Environment Policy 26
Source: Ape Written Statement
loped land is an important element in achieving regeneration and sustainable development objectives and to improve both the built and living environment. This is supported by paragraph 7.20.2 and Environment Policy 26 of the Strategic Plan. Development proposals on contaminated and/or unstable land, or where previous land use may indicate some level of contamination, must include an assessment of the extent of contamination and/or instability and any possible risks.
This Chapter focuses on Transport (roads, public transport, cycleways, footpaths) and Utilities (energy, telecommunications, water supply, sewerage drainage and electricity).
This Plan addresses infrastructure issues within distinct Chapters but it is impossible to plan for different kinds of infrastructure in isolation. The work undertaken to support this plan has included comprehensive site assessments looking at all aspects of development and needs in terms of supporting infrastructure, as well as scenario testing work which looked at broad development patterns and the implications on infrastructure as a whole. Issues relating to roads and utilities are often referred to as grey infrastructure and were discussed in the scenario testing work in these terms. Ahead of sections on 'area plan objectives' and 'area plan desired outcomes' in this Chapter, there is a brief discussion of two important long term infrastructure strategies which set the broad context for the preparation of the Area Plan for the East. This Plan incorporates the objectives of both the National Infrastructure Strategy and the Harbour Strategy and is in support of their desired aims.
The Isle of Man Strategic Plan contains specific strategic policy in respect of transport and other grey infrastructure. The Chapters on Strategic Objectives and Strategic Policies state that development needs to:
The overall objective for these may be summed up as being to protect public-benefiting utilities and other assets and enable the orderly provision and co-ordination of these and other facilities for the benefit of the community.
Since the Strategic Plan 2016 was adopted, some changes have occurred relevant to the services and utilities - changes to titles of service authorities and suppliers and changes to strategies and service types and terms used to describe those types. None of these changes alter the intention of the policies in the Strategic Plan and are thus taken into account in this Area Plan as natural evolutions of business operations.
While the Area Plan for the East is a short to medium term document, the National Infrastructure Strategy (NIS) aims to ensure there is an integrated, reliable, secure and resilient provision of Island-wide infrastructure that meets the social and economic needs of the Island up to 2050.
The document presents an audit of the Island's current infrastructure, sets out the available capacities for each key asset and identifies any known issues with supply. It then examines a number of factors which could impact on the future provision of the Island's infrastructure: the Island's population and age structure, the spatial distribution of development, the economic situation of the Island, climate change, technological change and the need to meet national and international obligations and regulations. Finally, consideration is given to the obsolescence of each of the Island's key assets. Key assets in the East identified in the document are:
The NIS Strategy identifies the following issues faced by specific assets:
The Strategy concludes that the Island's key assets are currently ma
20
Citations
70.0%
Approval Rate
2023
Peak Year
Patrick
Top Parish
Transportation of sediment from the Peel silt lagoon to Cross Vein Mine, treatment of it on site, and use in remediation of the site including capping works; this includes the construction of a settlement pond, temporary treatment plant, a vehicular access point, access tracks, drainage ditches, perimeter fencing, landscape works and temporary welfare facilities
Erection of a block of 20 light industrial units
Installation of service reservoir and connecting pump station with associated access, boundary fencing and landscaping
Creation of Site Area for stationing, washing and maintenance of rental motor vehicles and secure parking of customer vehicles, erection of Industrial Unit for vehicle maintenance purposes with associated parking (amendment to approved under PA 21/00294/B)
Erection of Industrial Unit for general industrial/light industrial/storage/distribution with associated parking (amendment to approved under PA 21/00294/B)
Erection of 11 units for general industrial/light industrial/storage/distribution with associated parking
Partial demolition and refurbishment of industrial building, and erection of replacement industrial units
Erection of a detached office building to replace existing
Erection of 1 light industrial unit
Erection of 8 light industrial units