8 April 2019 · Delegated
St. Johns Steel Services, Old Brick Works, Mines Road, Foxdale, Isle Of Man, IM4 3ex
Permission was granted for the partial demolition, refurbishment, and replacement of an industrial building at the Old Brickworks, Mines Road, Foxdale on the Isle of Man. The applicant was Livelladean Limited. The site forms part of an existing building group in the centre of Foxdale village. The building subject to the works is notably the tallest in that group and the only one not to have been recently redeveloped, making it a prominent feature in the local setting. The decision was made on 8 April 2019 by the Head of Development Management under delegated powers, with four conditions attached to the approval.
The application was approved by the Head of Development Management under delegated authority. The proposal involved partial demolition and refurbishment of an existing industrial building, along with replacement industrial units at the Old Brickworks site in Foxdale village.
General Policy 2
complies with the relevant parts
General Policy 2: Development which is in accordance with the land-use zoning and proposals in the appropriate Area Plan and with other policies of this Strategic Plan will normally be permitted, provided that the development: (a) is in accordance with the design brief in the Area Plan where there is such a brief; (b) respects the site and surroundings in terms of the siting, layout, scale, form, design and landscaping of buildings and the spaces around them; (c) does not affect adversely the character of the surrounding landscape or townscape; (d) does not adversely affect the protected wildlife or locally important habitats on the site or adjacent land, including water courses; (e) does not affect adversely public views of the sea; (f) incorporates where possible existing topography and landscape features, particularly trees and sod banks; (g) does not affect adversely the amenity of local residents or the character of the locality; (h) provides satisfactory amenity standards in itself, including where appropriate safe and convenient access for all highway users, together with adequate parking, servicing and manoeuvring space; (i) does not have an unacceptable effect on road safety or traffic flows on the local highways; (j) can be provided with all necessary services; (k) does not prejudice the use or development of adjoining land in accordance with the appropriate Area Plan; (l) is not on contaminated land or subject to unreasonable risk of erosion or flooding; (m) takes account of community and personal safety and security in the design of buildings and the spaces around them; and (n) is designed having due regard to best practice in reducing energy consumption. 6.3 Development outside of areas zoned for development
Development will not be permitted on or close to contaminated land unless it can be demonstrated that there is no unacceptable risk
loped land is an important element in achieving regeneration and sustainable development objectives and to improve both the built and living environment. This is supported by paragraph 7.20.2 and Environment Policy 26 of the Strategic Plan. Development proposals on contaminated and/or unstable land, or where previous land use may indicate some level of contamination, must include an assessment of the extent of contamination and/or instability and any possible risks. Transport and Utilities Introduction This Chapter focuses on Transport (roads, public transport, cycleways, footpaths) and Utilities (energy, telecommunications, water supply, sewerage drainage and electricity). This Plan addresses infrastructure issues within distinct C hapters but it is impossible to plan for different kinds of infrastructure in isolation. The work undertaken to support this plan has included comprehensive site assessments looking at all aspects of development and needs in terms of supporting infrastructure, as well as scenario testing work which looked at broad development patterns and the implications on infrastructure as a whole. Issues relating to roads and utilities are often referred to as grey infrastructure and were discussed in the scenario testing work in these terms. Ahead of sections on ' area plan objectives' and 'area plan desired outcomes' in this Chapter, there is a brief discussion of two important long term infrastructure strategies which set the broad context for the preparation of the Area Plan for the East. This Plan incorporates the objectives of both the National Infrastructure Strategy and the Harbour Strategy and is in support of their desired aims. Strategic Plan Implementation - Transport and Utilities The Isle of Man Strategic Plan contains specific strategic policy in respect of transport and other grey infrastructure. The Chapters on Strategic Objectives and Strategic Policies state that development needs to: • optimise the use of previously developed land; • use sites efficiently; • utilise existing and planned infrastructure, facilities and services; • minimise journeys by private car, make best use of public transport, not adversely affect highway safety for all users, encourage pedestrian movement; • be located and designed to promote a more integrated transport network; • encourage the efficient use of energy; • safeguard the efficient operation of the Island's ports for fishing, commercial and leisure use without compromising environmental objectives; and be well served by modern telecommunications without compromising the protection of the landscape. The overall objective for these may be summed up as being to protect pub lic-benefiting utilities and other assets and enable the orderly provision and co -ordination of these and other facilities for the benefit of the community. Since the Strategic Plan 2016 was adopted, some changes have occurred relevant to the services and utilities - changes to titles of service authorities and suppliers and changes to strategies and service types and terms used to describe those types. None of these changes alter the intention of the policies in the Strategic Plan and are thus taken into account in this Area Plan as natural evolutions of business operations. All-Island Strategies National Infrastructure Strategy15 While the Area Plan for the East is a short to medium term document, the National Infrastructure Strategy (NIS) aims to ensure there is an integrated, reliable, secure and resilient provision of Island-wide infrastructure that meets the social and economic needs of the Island up to 2050. The document presents an audit of the Island's current infrastructure, sets out the available capacities for each key asset and identifies any known issues with supply. It then examines a number of factors which could impact on the future provision of the Island's infrastructure: the Island's population and age structure, the spatial distr ibution of development, the economic situation of the Island, climate change, technological change and the need to meet national and international obligations and regulations. Finally, consideration is given to the obsolescence of each of the Island's key assets. Key assets in the East identified in the document are: • Douglas and Laxey harbours • Combined Cycle Gas Turbine (CCGT) facility at Pulrose and the Energy-from-Waste Facility at Richmond Hill • Gas pipeline for Glen Mooar to Pulrose Power Station • LPG stores in Douglas • The Douglas Water Treatment Works • West Baldwin, Clypse and Kerrowdhoo Reservoirs • Meary Veg sludge treatment facility The NIS Strategy identifies the following issues faced by specific assets: • Flood risk to the National Sports Centre, D ouglas Fire Station, Banks Circus bus depot, Douglas Railway Station, Pulrose Power Station and Pulrose Bridge after major flooding occurred in 2015; and • traffic congestion at Quarterbridge and Governor's Hill roundabouts. The Strategy concludes that the Island's key assets are currently ma
parking provision must be in accordance with the Department's current standards
Transport Policy 7: The Department will require that in all new development, parking provision must be in accordance with the Department's current standards. The current standards are set out in Appendix 7. 11.5.4 New development can have a significant impact in terms of the traffic generated by it and the impact on the various modes of travel. The Department considers that proposals which are likely to be significant traffic generators should be accompanied by a Transport Assessment(1) which should look at all modes of transport including access by public transport, cycling and on foot.
Condition 1
The development hereby approved shall be begun before the expiration of four years from the date of this decision notice.
Condition 2
Prior to the use of the site as approved the site must be laid out with the parking spaces clearly marked and in accordance with Manual for Manx Roads in accordance with a drawing to be approved by the Department.
Condition 3
The buildings hereby approved may be used only for industrial or storage purposes.
Condition 4
No approval is granted to the installation of any internal floorspace, through the introduction of further mezzanine levels or otherwise, without planning approval.
adjacent sites were the subject of recent applications for alterations and redevelopment
upgraded the building fabric in the area
adjacent sites were the subject of recent applications for alterations and redevelopment
upgraded the building fabric in the area
erection of the carpet warehouse and showroom
surrounding land has been successfully redeveloped
development of a dwelling on land known to be contaminated
development of a dwelling on land known to be contaminated