7 December 2017 · Delegated
Unit 1, Balthane Industrial Estate, Balthane, Ballasalla, Isle Of Man, IM9 2aq
Permission was granted for the erection of one light industrial unit at the former Manx Metals site within Balthane Industrial Estate, Ballasalla. The site sits on a minor road to the east of the main road through the estate, with a frontage of 32 metres and a depth of 70 metres, and had until recently been used as a scrap metal processing facility. The officer's report identified three main planning issues: whether the site was contaminated and could be remediated, whether the development would have any adverse impact on the character of the area or the local highway network, and whether light industrial use was acceptable in principle. The application was approved with six conditions attached. The decision was made by the Head of Development Management under delegated authority on behalf of the Department of Environment, Food and Agriculture.
The application was approved on 7 December 2017. The key planning issues considered were whether the former scrap metal site could be remediated from any contamination, whether the new building would affect the character of the area or the local road network, and whether light industrial use was acceptable in principle at this location.
Balthane Industrial Estate
encouraging an improvement of its appearance
All industrial uses
will be located on the Industrial Estate at Balthane
Balthane Industrial Estate would be the preferred location for additional or replacement waste facilities
preferred location for additional or replacement waste facilities
Development which is in accordance with the land-use zoning
relevant as follows
General Policy 2: Development which is in accordance with the land-use zoning and proposals in the appropriate Area Plan and with other policies of this Strategic Plan will normally be permitted, provided that the development: (a) is in accordance with the design brief in the Area Plan where there is such a brief; (b) respects the site and surroundings in terms of the siting, layout, scale, form, design and landscaping of buildings and the spaces around them; (c) does not affect adversely the character of the surrounding landscape or townscape; (d) does not adversely affect the protected wildlife or locally important habitats on the site or adjacent land, including water courses; (e) does not affect adversely public views of the sea; (f) incorporates where possible existing topography and landscape features, particularly trees and sod banks; (g) does not affect adversely the amenity of local residents or the character of the locality; (h) provides satisfactory amenity standards in itself, including where appropriate safe and convenient access for all highway users, together with adequate parking, servicing and manoeuvring space; (i) does not have an unacceptable effect on road safety or traffic flows on the local highways; (j) can be provided with all necessary services; (k) does not prejudice the use or development of adjoining land in accordance with the appropriate Area Plan; (l) is not on contaminated land or subject to unreasonable risk of erosion or flooding; (m) takes account of community and personal safety and security in the design of buildings and the spaces around them; and (n) is designed having due regard to best practice in reducing energy consumption. 6.3 Development outside of areas zoned for development
Development will not be permitted on or close to contaminated land
to comply with Environment Policy 26
loped land is an important element in achieving regeneration and sustainable development objectives and to improve both the built and living environment. This is supported by paragraph 7.20.2 and Environment Policy 26 of the Strategic Plan. Development proposals on contaminated and/or unstable land, or where previous land use may indicate some level of contamination, must include an assessment of the extent of contamination and/or instability and any possible risks. Transport and Utilities Introduction This Chapter focuses on Transport (roads, public transport, cycleways, footpaths) and Utilities (energy, telecommunications, water supply, sewerage drainage and electricity). This Plan addresses infrastructure issues within distinct C hapters but it is impossible to plan for different kinds of infrastructure in isolation. The work undertaken to support this plan has included comprehensive site assessments looking at all aspects of development and needs in terms of supporting infrastructure, as well as scenario testing work which looked at broad development patterns and the implications on infrastructure as a whole. Issues relating to roads and utilities are often referred to as grey infrastructure and were discussed in the scenario testing work in these terms. Ahead of sections on ' area plan objectives' and 'area plan desired outcomes' in this Chapter, there is a brief discussion of two important long term infrastructure strategies which set the broad context for the preparation of the Area Plan for the East. This Plan incorporates the objectives of both the National Infrastructure Strategy and the Harbour Strategy and is in support of their desired aims. Strategic Plan Implementation - Transport and Utilities The Isle of Man Strategic Plan contains specific strategic policy in respect of transport and other grey infrastructure. The Chapters on Strategic Objectives and Strategic Policies state that development needs to: • optimise the use of previously developed land; • use sites efficiently; • utilise existing and planned infrastructure, facilities and services; • minimise journeys by private car, make best use of public transport, not adversely affect highway safety for all users, encourage pedestrian movement; • be located and designed to promote a more integrated transport network; • encourage the efficient use of energy; • safeguard the efficient operation of the Island's ports for fishing, commercial and leisure use without compromising environmental objectives; and be well served by modern telecommunications without compromising the protection of the landscape. The overall objective for these may be summed up as being to protect pub lic-benefiting utilities and other assets and enable the orderly provision and co -ordination of these and other facilities for the benefit of the community. Since the Strategic Plan 2016 was adopted, some changes have occurred relevant to the services and utilities - changes to titles of service authorities and suppliers and changes to strategies and service types and terms used to describe those types. None of these changes alter the intention of the policies in the Strategic Plan and are thus taken into account in this Area Plan as natural evolutions of business operations. All-Island Strategies National Infrastructure Strategy15 While the Area Plan for the East is a short to medium term document, the National Infrastructure Strategy (NIS) aims to ensure there is an integrated, reliable, secure and resilient provision of Island-wide infrastructure that meets the social and economic needs of the Island up to 2050. The document presents an audit of the Island's current infrastructure, sets out the available capacities for each key asset and identifies any known issues with supply. It then examines a number of factors which could impact on the future provision of the Island's infrastructure: the Island's population and age structure, the spatial distr ibution of development, the economic situation of the Island, climate change, technological change and the need to meet national and international obligations and regulations. Finally, consideration is given to the obsolescence of each of the Island's key assets. Key assets in the East identified in the document are: • Douglas and Laxey harbours • Combined Cycle Gas Turbine (CCGT) facility at Pulrose and the Energy-from-Waste Facility at Richmond Hill • Gas pipeline for Glen Mooar to Pulrose Power Station • LPG stores in Douglas • The Douglas Water Treatment Works • West Baldwin, Clypse and Kerrowdhoo Reservoirs • Meary Veg sludge treatment facility The NIS Strategy identifies the following issues faced by specific assets: • Flood risk to the National Sports Centre, D ouglas Fire Station, Banks Circus bus depot, Douglas Railway Station, Pulrose Power Station and Pulrose Bridge after major flooding occurred in 2015; and • traffic congestion at Quarterbridge and Governor's Hill roundabouts. The Strategy concludes that the Island's key assets are currently ma
Condition 1
The development hereby approved shall be begun before the expiration of four years from the date of this decision notice.
Condition 2
On breaking through any concrete, a sample of the soil shall be taken and tested to ensure that there is no risk of harm before works continue. Prior to the commencement of works, the applicant shall have approved by the Department a method or process for this including timescales and identification of the appropriate authority together with proposed mitigation should any harmful material be found.
Condition 3
Prior to any other construction, the access shown on drawing 16/42/01 dated Dec 2016 shall be constructed and maintained thereafter.
Condition 4
Prior to the occupation of any building, the car parking and manoeuvring areas shall be provided and remain free from obstruction thereafter.
Condition 5
Prior to the application of any external cladding, the colour of this must be approved by the Department and the colour retained as such thereafter.
Condition 6
No additional internal floorspace may be introduced without the benefit of planning approval.