Planning Circular 1/06
Source: Aps Written Statement
site must include provision for a footpath link to join the site to the north allowing pedestrian access from the Main Road to the Colby Glen Road, via Site 13 and the site being developed under 11/0684/B. Advice must be sought from the Highway's Division (DoI) prior to any application being made.
5. Development plans must include ground level information and cross sectional drawings to show the relationship of any new dwellings with existing dwellings in Ballacriy Park which appear to be at a lower level than the Ballacubbon land.
600
Citations
90.9%
Approval Rate
2006
Peak Year
Douglas
Top Parish
Installation of replacement windows to front and rear elevations and rear door
Erection of a temporary classroom block
Alterations and creation of additional windows
Refurbishment of restaurant including new conservatory (comprising amendments to PA 07/01232B)
Change of use from storage facility to office accommodation
Creation of patio doorways and patio areas
Erection of a flower packaging and storage shed
Erection of shed, two greenhouses and laying of stone track
Erection of temporary storage facility
Approval in principle to erect a dwelling and garage