26 August 2015 · Delegated
Field 314574, Poortown Road, Peel, Isle Of Man, IM5 2al
This application sought permission to construct a temporary facility on two fields off Poortown Road, Peel, for storing dredgings from Peel Marina. The permission was limited to a maximum of five years. The application was approved as a Department Application, decided on a delegated basis and signed by A Johnstone on behalf of the Chief Secretary. Six conditions were attached to the approval, though the detail of those conditions is not available in the supplied evidence.
The application was approved as a Department Application, signed on behalf of the Chief Secretary by A Johnstone. The decision notice confirms approval, though detailed planning reasons are not available in the supplied evidence.
Conditions of Approval
The storage facility hereby approved shall remain for a limited period of five years from the date of this approval. On (or before) the expiry of this approval the facility shall be removed and the land restored to its former levels, or to an agreed profile, be seeded and be capable of use of use for agricultural purposes in accordance with details to be submitted to and approved in writing by Planning and Building Control Directorate of the Department of Environment Food and Agriculture (P&BC DEFA).
Condition 2
Prior to the facility hereby approved ceasing to operate, a detailed remediation scheme to bring the site to a condition suitable for its intended subsequent use must be submitted to and approved in writing by P&BC DEFA.
Condition 3
The approved final remediation scheme submitted pursuant to condition 2, must be carried out in accordance with its terms. Following completion of measures identified in the approved remediation scheme, a verification report that demonstrates the effectiveness of the remediation carried out must be produced, and is subject to the approval in writing of P&BC DEFA.
Condition 4
In the event that contamination is found following final remediation it must be reported in writing immediately to DEFA. An investigation and risk assessment must then be undertaken and where remediation is necessary a remediation scheme must be prepared and be submitted to and approved in writing by P&BC DEFA and implemented.
Condition 5
Following the initial disposal of material (which has now been completed), no further material may be transported to and deposited at the site.
Condition 6
Within a period of three months from the date of this approval, a detailed tree survey indicating: - (i) those trees which have been removed from the site in order to construct the facility; - (ii) those trees which are likely to have been damaged as a result of the works to construct the facility; and - (iii) a scheme for tree planting, including a timetable for such shall be submitted to and approved in writing by P&BC DEFA.