Loading document...
PLAINING & BUILDING CONTROL RECEIVED ON 27 AUG 2015 DEPT OF ENVIRONMENT FOOD AND AGRICULTURE
CABINET OFFICE Government Office DOUGLAS Isle of Man IM1 3PN Direct Line (01624) 685280 Fax Number (01624) 685710 Email [email protected] CHIEF SECRETARY Mr Will Greenhow ACMA
26th August 2015
Our Reference : DF15/0018
Planning Secretary Department of Environment, Food and Agriculture Planning & Building Control Division Murray House Mount Havelock Douglas
Dear Sir/Madam,
TOWN AND COUNTRY PLANNING ACT 1999 TOWN AND COUNTRY PLANNING (DEVELOPMENT PROCEDURE) (No2) ORDER 2013
I refer to the abovementioned planning application.
In accordance with Article 10(9) of the Town and Country Planning (Development Procedure) (No 2) Order 2013, I herewith give notice of the decision as follows.
The application has been approved subject to the following conditions:
Reason: The development has been found to be acceptable only on a short term basis because it meets a specific need.
| Applicant | Department of Infrastructure |
|---|---|
| Proposal | Construction of a facility for the temporary (maximum 5 years) storage of dredgings from Peel Marina |
| Address | Fields 314574 & 314514 Poortown Road Peel |
Reason: To ensure that risks from contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors.
Reason: To ensure that risks from contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors.
Reason: To ensure that risks from contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors.
Reason: The site is being used as a temporary facility for the storage of material which has now been completed.
Reason: In the interests of environmental and visual amenity.
In accordance with Article 10(10)(c) of the Order, please be advised that the decision of the Council of Ministers is binding and final (subject to the possibility of judicial review by petition of doleance).
Yours faithfully,
A Johnstone Planning Appeals Administrator On behalf of the Chief Secretary
Copyright in submitted documents remains with their authors. Request removal