19 August 2014 · Committee
Field 411363, Truggan Road, Port St Mary, Isle Of Man, IM9 5ld
The application sought to convert two fields on Truggan Road, Port St. Mary into a campsite and motorhome park, including a shower/toilet block, associated facilities, landscaping, and a new vehicular access. The site falls within a sensitive landscape area covering Port Erin, Port St. Mary, and Bay Ny Carrickey, where the green separation between settlements is considered fragile and key views across the bay are valued. The officer acknowledged that well-located camping facilities can benefit the Island's tourism offer and that a dedicated motorhome site could reduce inappropriate parking elsewhere. However, two decisive concerns led to refusal.
The committee refused the application because the local road network was unsuitable for the volume of large vehicles the site would generate, and no transport assessment or limit on motorhome numbers was provided to address this. The proposed landscaping was also insufficient to prevent unacceptable visual harm to the countryside, and the development could not meet the high threshold required to justify countryside development under Environment Policy 1.
Environment Policy 1 of the Strategic Plan
Area Plan for the East sets out locally-applicable means for implementing the policies set out in the Isle of Man Strategic Plan 2016. In that Strategic Plan, we find the Environment Policies. Environment Policy 1 states: The countryside and its ecology will be protected for its own sake. For the purposes of this policy, the countryside comprises all land which is outside the settlements defined in Appendix 3 at A.3.6 or which is not designated for future development on an Area Plan. Development which would adversely affect the countryside will not be permitted unless there is an over- riding national need in land use planning terms which outweighs the requirement to protect these areas and for which there is no reasonable and acceptable alternative. Maintaining the purpose of this Area Plan as a means of implementation, there is some further direction to be found in the Strategic Plan, at paragraph 7.2.1: 'Whilst landscape and coastal change is inevitable, and in some cases desirable, the emphasis must be on the appropriateness of this change and the balance or equity between the needs of conservation and those of development. The primary goal must therefore be to respect, maintain and enhance the natural and cultural environment including nature conservation and landscape and coastal quality, and ensure its protection from inappropriate development.' Given the comprehensive nature of the Isle of Man Strategic Plan's Environmental Policies, only a small number of additional Proposals and Recommendations are necessary. In order to produce an implementable Area Plan for the East it is necessary to recognise those statutory desig nations and strategies which whilst having an Island-wide scope are highly relevant to the protection of environments within the Plan Area. An example is the UNESCO Biosphere status afforded to the Isle of Man. Island-level strategies identify crossborder issues and take account of the cumulative impacts of human engagement with nature. Area Plan Objectives i. To protect, conserve and enhance the natural and cultural environment of the plan area and promote biodiversity. ii. To improve the function, usability and provision of our green infrastructure and public spaces by providing a network of green spaces and features which are connected and where possible, accessible to the public. iii. To manage and improve flood risk and improve drainage conditions. iv. To support the working countryside and its custodians in maintaini ng a sustainable rural economy. Area Plan Desired Outcomes i. Where approved, d evelopment will be ecologically sustainable and designed to protect and where possible enhance biodiversity as well as mitigate and adapt to the effects of climate change. ii. The Green Infrastructure network will be established and fostered, connecting people with nature in a way that achieves the best shared outcomes for the urban and natural environment. iii. Statutory and non-statutory designations will continue to provide protection to the most important and most vulnerable cultural assets, habitats and environments in the plan area. iv. Beyond the towns and villages, the area as a whole will retain its landscape setting including its important visual interaction with the central uplands, central valley, coast and marine environment. Natural Environment Proposal 1 The Department supports the protection, creation and improvement of green infrastructure in the East, particularly in those locations which have the potential to be part of a Green Infrastructure Network. Applications for development must take into account any approved Government Green Infrastructure Strategies, but in any case, must identify how development proposals intend to contribute to the long term provision of a network of connected green spaces. UNESCO Biosphere In 2017, the Isle of Man became the first ever entire nation to achieve UNESCO Biosphere status. Project partners pledge to take steps to protect natural resources, develop the economy in a sustainable way and promote outstanding living landscapes. UNESCO Biosphere Reserves are established to connect people and the economy with nature, wildlife, culture, heritage and communities. Biosphere Reserves have three functions: Conservation: to contribute to the conservation of landscapes, ecosystems, species and genetic variation. Development: to foster economic and human development which is socio -culturally and ecologically sustainable. Logistic support: to support demonstration projects, environmental education and training, research and monitoring related to local, regional, national and global issues of conservation and sustainable development. The Isle of Man Biosphere is zoned into six areas . Examples of all of these can be found in the Eastern area: Terrestrial Core areas, Marine Core areas, Terrestrial Buffer zone, Marine Buffer zone, Terrestrial Transition areas and Marine Transition areas. There is some overlap with The Isle of Man's First Biodiversity Strategy 2015-20
Transport Policy 4
Transport Policy 4: The new and existing highways which serve any n ew development must be designed so as to be capable of accommodating the vehicle and pedestrian journeys generated by that development in a safe and appropriate manner, and in accordance with the environmental objectives of this plan. 11.3.2 Notwithstanding policies within this plan which encourage travel by means other than private car it is anticipated that the number of vehicles using the Island's roads will continue to increase. This increase in demand is likely to lead to a greater need for road impro vements in order that travel can take place in a safe, effective, and environmentally acceptable manner. The Department of Transport will continue to assess the need for such improvements to public highways and undertake works where appropriate, with much of the improvement within existing roads carried out under the provisions of the Town and Country Planning (Permitted Development) Order2005. The need for improvements to the Island's highway network must be balanced against the environmental objectives of this plan.
Transport Policy 6
Transport Policy 6: In the design of new development and transport facilities the needs of pedestrians will be given similar weight to the needs of other road users. 11.5. Car Parking 11.5.1 The level of car parking provided in new development is critical to creating more sustainable development. Too little and the traffic generated can create problems on adjacent streets. Too much can increase congestion and delay public transport. The problem is most severe in existing settlements and at its worst in the Douglas area. 11.5.2 In respect of town centre office development, it has been the Department's usual practice to require the provision of one parking space per 50sq metres of nett office floor space, such parking spaces to be provided preferably on site but otherwise conveniently close to the site. The standard of 1 space per 50sq metres is based on: 1/3 staff walking or cycling: 1/3 travelling by public transport and 1/3 by private car. This provision is very often rather less than the demand created by the development. In the case of office developments outside of the town centre, the requirement is usually one parking space per 15sq metres of nett office floor space, a ratio which reflects more accurately the actual demand for parking space arising from the office use. The Douglas Local Plan did in fact invite consideration of other options whereby either the requirement should be increased such as to meet fully the demand for parking space, or the requirement should be reduced so that, with proper enforcement of on-street parking restrictions, fewer workers would come into town by car. 11.5.3 The long term target is to reduce the level of car parking required for town centre developments and seek to develop more sustainable staff and visitor transport plans including improved public transport, staff buses, shared and pooled cars, cycling and walking. Consideration should be given to the provision of cycle parking for staff and customers in non -residential development and to the provision of secure cycle stores in apartments. In the shorter term, the Department proposes the following general policy in respect of parking provision.
Strategic Policy 8
Strategic Policy 8: Tourist development proposals will generally be permitted where they make use of existing built fabric of interest and quality, where they do not affect adversely environmental, agricultural, or highway interests and where they enable enjoyment of our natural and man - made attractions. 4.4.5 This policy reflects the general restriction on new development outside defined development zones. Tourist proposals in the countryside will normally be required to meet the above criteria. 4.4.6 Viable and vibrant town and village centres not only provide the opportunity for economic success, but also provide convenient and accessible amenities for all members of the community and an opportunity to obtain renewal of some of our poorer built fabric. Accordingly:
Condition 1
The development hereby approved shall commence before the expiration of four years from the date of this notice.
Condition 2
The campsite hereby approved shall not be used between the end of October and the first week in April or Easter (whichever is the earliest).
Condition 3
There shall be no more than 6 motor homes on the site at any one time, and they shall occupy Pitch Nos 1, 2, 3, 15, 16 and 17, as shown on Drwg No C/9004/1(d), and no other pitches.
Condition 4
Before development starts, details of the number, appearance and location of any "glamping pods" shall be submitted to and approved in writing by the Department. The "glamping pods" shall be installed in accordance with approved details.
Condition 5
Before the development starts, a landscaping scheme shall be submitted to and approved in writing by the Department. It shall include details of all hard surfaces, and all new trees and hedges together with a programme for their planting. The scheme shall be implemented as approved. Any tree or hedge plant that, within a period of 5 years from the date of planting, dies, is removed or becomes seriously damaged or diseased shall be replaced during the next planting season with another of the same species and size.
Condition 6
Before development starts, details of any external lighting shall be submitted to and approved in writing by the Department. The external lighting shall be installed in accordance with the approved details. Thereafter, no other external lighting shall be installed without the prior approval of the Department.