Environment Policy 27: The Department will seek to enhance the natural environment, including sites contaminated by former mine workings, along with other Government Departments, local communities, the private sector and all appropriate agencies in order to ensure the appropriate reclamation, water management, planting of appropriate tree species, the management of special habitats including aquatic habitats and the removal of eyesores.
7.22.1 The policy set out below aims to safeguard life and property from ground instability such as landslips and subsidence. Therefore, unless mitigating measures can be taken, development will not be permitted where it would be at risk from unstable land or increase the risk of ground instability elsewhere.
7.22.2 It may be necessary for a developer to undertake a specialist investigation and assessment to identify any remedial measures required to deal with ground instability. It may also be appropriate to carry out monitoring after the development has taken place. Ultimately it is the responsibility of the developer to ensure that land is safe and suitable for development. Whilst the Department will try to ensure that a development will not be put at unacceptable risk, the subsequent liability for safe development and secure occupancy of a site rests with the developer and / or landowner.
24
Citations
88.2%
Approval Rate
2025
Peak Year
Patrick
Top Parish
Transportation of sediment from the Peel silt lagoon to Cross Vein Mine, treatment of it on site, and use in remediation of the site including capping works; this includes the construction of a settlement pond, temporary treatment plant, a vehicular access point, access tracks, drainage ditches, perimeter fencing, landscape works and temporary welfare facilities
Siting of two storage containers with link roof between
Approval in Principle (with all matters reserved) for erection of industrial building for purposes of storage and distribution (class 2.4) with associated parking and landscaping
Erection of a block of 20 light industrial units
Erection of a building for the storage of items associated with the maintenance of the site
Landscaping of the former quarry works area to provide an information point, seating and viewing area
Alterations and extensions to existing agricultural building for housing of animals and storage of feed and equipment
Continuation of restoration works rebuilding of gravel bund, re-profiling of the lake edge, new ponds, erection of birdwatching hide.
Creation of 2 ponds
Installation of a shipping container for storage of tools and equipment during the development of the nature reserve (retrospective)