Energy Policy 1
Source:
Policy text not yet available. This policy has been cited in 9 applications.
9
Citations
100.0%
Approval Rate
2020
Peak Year
Douglas
Top Parish
Installation of replacement boundary fencing and walls with additional flood protection
Erection of two replacement fire water storage tanks
Erection of security fencing and gates
Erection of a detached substation
Erection of solar photovoltaic panels
Alterations and extension to dwelling, alterations to driveway and vehicular access
Installation of two bulk storage fuel tanks to replace existing
Erection of a wooden support pole to facilitate the re-location of an overhead electricity line
Erection of a meteorological wind monitoring mast