Area Plan for the South adopted in 2013
Source:
Policy text not yet available. This policy has been cited in 26 applications.
26
Citations
73.3%
Approval Rate
2015
Peak Year
Malew
Top Parish
Material change of conservatory roof to solid roof.
Erection of a log cabin in rear garden for residential use/dog grooming business
Change of use from bar (class 3) to a retail unit (class 1)
Erection of 15 industrial units in two separate blocks
Alterations to property including replacement of roof tiles with marley concrete tiles and rendering of west gable
Use of part of field as a builder's compound until March 2019 to implement works to adjacent Derbyhaven House (retrospective)
Installation of black flue from multi-fuel fire on south-east elevation
Erection of dwelling (amendment to PA 15/01308/B)
Installation of 3 additional tourist accommodation huts on campsite
Creation of a vehicular access to serve three dwellings