Master plan of business technology park
Shoprite Group Ltd.
22 November 2022 · Committee
Site 1 Of Former Isle Of Man Holiday Camp, Switzerland Road, Douglas, Isle Of Man, IM2 4re
The proposal involves three detached buildings on a previously developed site that has lain largely vacant for a considerable period. The largest building, Block 3, rises to part seven storeys and part three storeys with an L-shaped footprint, positioned above Douglas Promenade and visible from Douglas Head, Onchan Head, and King Edward Road. Gym and hospitality facilities are reserved for employees and residents on site, while the restaurant and café will be open to the public. The site sits adjacent to the Douglas Promenade Conservation Area and near the Registered Building Falcon Cliff, raising heritage and visual impact concerns. The key planning issues were the building's prominence and visibility, its effect on the Conservation Area and Falcon Cliff, a sizeable shortfall in on-site parking, tree loss, and ecology. Planning Committee concluded that the heritage impacts were not significant enough to justify refusal, that the parking shortfall was acceptable given the residential element of the development, and that bringing a long-vacant brownfield site back into productive use carried significant weight in favour of approval.
The Committee judged that the impacts on the Conservation Area and Registered Building Falcon Cliff, while present, were not severe enough to warrant refusal. The parking shortfall was considered acceptable in the context of the residential nature of the staff accommodation and the approved Travel Plan. Redeveloping a long-vacant brownfield site in Douglas and delivering employment and housing in an accessible urban location were treated as significant benefits that outweighed the identified harms.
Strategic Policy 1
Development should make the best use of resources
Strategic Policy 2
New development will be located primarily within our existing towns and villages
Strategic Policy 4
Strategic Policy 6
Major employment-generating development should be located in existing centres
Strategic Policy 9
General Policy 2
Development which is in accordance with the land-use zoning and proposals in the appropriate Area Plan
General Policy 2: Development which is in accordance with the land-use zoning and proposals in the appropriate Area Plan and with other policies of this Strategic Plan will normally be permitted, provided that the development: (a) is in accordance with the design brief in the Area Plan where there is such a brief; (b) respects the site and surroundings in terms of the siting, layout, scale, form, design and landscaping of buildings and the spaces around them; (c) does not affect adversely the character of the surrounding landscape or townscape; (d) does not adversely affect the protected wildlife or locally important habitats on the site or adjacent land, including water courses; (e) does not affect adversely public views of the sea; (f) incorporates where possible existing topography and landscape features, particularly trees and sod banks; (g) does not affect adversely the amenity of local residents or the character of the locality; (h) provides satisfactory amenity standards in itself, including where appropriate safe and convenient access for all highway users, together with adequate parking, servicing and manoeuvring space; (i) does not have an unacceptable effect on road safety or traffic flows on the local highways; (j) can be provided with all necessary services; (k) does not prejudice the use or development of adjoining land in accordance with the appropriate Area Plan; (l) is not on contaminated land or subject to unreasonable risk of erosion or flooding; (m) takes account of community and personal safety and security in the design of buildings and the spaces around them; and (n) is designed having due regard to best practice in reducing energy consumption. 6.3 Development outside of areas zoned for development
Environment Policy 3
Development will not be permitted where it would result in the unacceptable loss of or damage to woodland areas
ar sea views. Additionally, services for networked water supply and other essential utilities would be difficult to provide for additional development in this area (see Maps 3, 7 and 9). Natural Environment Proposal 3 (Green Gap) Between the settlements of Laxey and Baldrine, development which would erode the separation and detract from the openness between the settlements will not be supported. Glen Vine and Crosby - These two settlements, although proximate in location, are separate and distinct in many ways. Consultation has clearly demonstrated this through the views expressed during the stages of plan development. In cases such as this, the breaks in the urban fabric and the features of nature which provide a sense of openness should be protected from development which would erode this (see Maps 3 and 10). Natural Environment Proposal 4 (Green Gap) Between the settlements of Glen Vine and Crosby, development which would erode the separation and detract from the openness between the settlements is unlikely to be supported. Douglas, Union Mills and Strang (see Maps 3, 4 and 8) Natural Environment Proposal 5 (Green Gap) Between the settlements of and Douglas, Union Mills and Strang, development which would erode the separation and detract from the openness between the settlements is unlikely to be supported. The Upland Environment The Manx Uplands are an iconic part of our landscape and heritage. Reference to the 'sweet mountain air' and 'green hills and rocks' are enshrined in our national anthem and the colours of the heather and gorse are woven into the very fabric of Manx tartan. The hills are a place of great beauty, yet for some they are also a place to work and for others a place to exercise or simply enjoy open space. Our Uplands are also home to plants and animals that whilst familiar to us, are rare and impor tant in a global and European context. Furthermore, the uplands are a rich repository of cultural and archaeological remains, which are sensitive to change and can easily be damaged by inappropriate development. Production of food is an important and obvi ous function of hill land. But surprisingly, the Manx hills provide everyday functions that most people take for granted. Peatlands, which cover most of our hills reduce the impacts of climate change by locking up carbon dioxide, collect and filter our drinking water and slow the passage of rainfall into streams and rivers, thus reducing downstream flood risk. These multiple uses are of great benefit to the economy of the Isle of Man and the well - being of its people. It is important that the hills continue to provide these benefits long into the future. Ensuring sustainable management of such a wide range of uses to the satisfaction of all interested parties whilst retaining functions essential to the well -being of the Isle of Man is of paramount importance. The Isle of Man Government is the owner and landlord for the majority of the Uplands in the East region and is therefore in a position to implement policy which will deliver the optimum range of ecosystem services. Appropriate and positive Upland management such as controlled rotational burning/cutting of heather and low intensity grazing helps to reduce the fuel load of the hill, provides firebreaks and reduces the risk of unplanned wildfires that further protects the biodiversity of the site, but also the vast amounts of carbon locked away in the peat soils. The majority of this work is carried out by The Department of Environment, Food & Agriculture's grazing and shooting tenants. The Manx Uplands are critically important from a habitat and biodiversity perspective. The hills in the East support a significant number of breeding hen harriers; however, other native Upland breeding birds such as curlew and red grouse have suffered severe declines in recent decades and as such are of high conservation concern. Strict control of access and recreational activity on vulnerable soils should be implemented to reduce soil erosion and subsequent carbon loss. Curlew and hen harriers are recognised as an internationally important species, while (within the EU) upland heather moorland is designated as a priority habitat. In order to ensure protection and positive management of the Uplands, the following proposal is appropriate: Environment Proposal 6 Uses of the Uplands that contribute to the management and preservation of this distinctive environment will be supported. Dark Skies On the Isle of Man, 26 Dark Sky Discovery Sites have been identified, of which nine are located in the East. They are classified as Milky Way Sites meaning that at these sites the Milky Way is visible to the naked eye. The sites are accessible and light pollution is limited. The following Dark Sky Discovery Sites are located within the East: • Port Soderick Upper Car Park • Port Soderick Brooghs, Little Ness Car Park • Mount Murray Golf Club • Onchan Park • West Baldwin Reservoir Car Park • Clypse Kerrowdhoo Reservoi
Environment Policy 4
uch as this, the breaks in the urban fabric and the features of nature which provide a sense of openness should be protected from development which would erode this (see Maps 3 and 10). Natural Environment Proposal 4 (Green Gap) Between the settlements of Glen Vine and Crosby, development which would erode the separation and detract from the openness between the settlements is unlikely to be supported. Douglas, Union Mills and Strang (see Maps 3, 4 and 8) Natural Environment Proposal 5 (Green Gap) Between the settlements of and Douglas, Union Mills and Strang, development which would erode the separation and detract from the openness between the settlements is unlikely to be supported. The Upland Environment The Manx Uplands are an iconic part of our landscape and heritage. Reference to the 'sweet mountain air' and 'green hills and rocks' are enshrined in our national anthem and the colours of the heather and gorse are woven into the very fabric of Manx tartan. The hills are a place of great beauty, yet for some they are also a place to work and for others a place to exercise or simply enjoy open space. Our Uplands are also home to plants and animals that whilst familiar to us, are rare and impor tant in a global and European context. Furthermore, the uplands are a rich repository of cultural and archaeological remains, which are sensitive to change and can easily be damaged by inappropriate development. Production of food is an important and obvi ous function of hill land. But surprisingly, the Manx hills provide everyday functions that most people take for granted. Peatlands, which cover most of our hills reduce the impacts of climate change by locking up carbon dioxide, collect and filter our drinking water and slow the passage of rainfall into streams and rivers, thus reducing downstream flood risk. These multiple uses are of great benefit to the economy of the Isle of Man and the well - being of its people. It is important that the hills continue to provide these benefits long into the future. Ensuring sustainable management of such a wide range of uses to the satisfaction of all interested parties whilst retaining functions essential to the well -being of the Isle of Man is of paramount importance. The Isle of Man Government is the owner and landlord for the majority of the Uplands in the East region and is therefore in a position to implement policy which will deliver the optimum range of ecosystem services. Appropriate and positive Upland management such as controlled rotational burning/cutting of heather and low intensity grazing helps to reduce the fuel load of the hill, provides firebreaks and reduces the risk of unplanned wildfires that further protects the biodiversity of the site, but also the vast amounts of carbon locked away in the peat soils. The majority of this work is carried out by The Department of Environment, Food & Agriculture's grazing and shooting tenants. The Manx Uplands are critically important from a habitat and biodiversity perspective. The hills in the East support a significant number of breeding hen harriers; however, other native Upland breeding birds such as curlew and red grouse have suffered severe declines in recent decades and as such are of high conservation concern. Strict control of access and recreational activity on vulnerable soils should be implemented to reduce soil erosion and subsequent carbon loss. Curlew and hen harriers are recognised as an internationally important species, while (within the EU) upland heather moorland is designated as a priority habitat. In order to ensure protection and positive management of the Uplands, the following proposal is appropriate: Environment Proposal 6 Uses of the Uplands that contribute to the management and preservation of this distinctive environment will be supported. Dark Skies On the Isle of Man, 26 Dark Sky Discovery Sites have been identified, of which nine are located in the East. They are classified as Milky Way Sites meaning that at these sites the Milky Way is visible to the naked eye. The sites are accessible and light pollution is limited. The following Dark Sky Discovery Sites are located within the East: • Port Soderick Upper Car Park • Port Soderick Brooghs, Little Ness Car Park • Mount Murray Golf Club • Onchan Park • West Baldwin Reservoir Car Park • Clypse Kerrowdhoo Reservoir Car Park • Conrhenny Car Park • Ballanette Nature Reserve • Axnfell Plantation Natural Environment Proposal 7 Proposals for development in the vicinity of Dark Sky Discovery Sites are to have minimal outdoor lighting and be encouraged to have a design response which is non-intrusive into the darkness of night. Baffling and directionality of lighting must be sensitive to contain any necessary lighting within a subject site only. Watercourses and Wetlands The collection of hills in the East has produced a network of mountain streams which gradually join and widen to become the rivers flowing out into Douglas Bay, Port Groudle a
Energy Policy 5
velopment which would erode the separation and detract from the openness between the settlements is unlikely to be supported. Douglas, Union Mills and Strang (see Maps 3, 4 and 8) Natural Environment Proposal 5 (Green Gap) Between the settlements of and Douglas, Union Mills and Strang, development which would erode the separation and detract from the openness between the settlements is unlikely to be supported. The Upland Environment The Manx Uplands are an iconic part of our landscape and heritage. Reference to the 'sweet mountain air' and 'green hills and rocks' are enshrined in our national anthem and the colours of the heather and gorse are woven into the very fabric of Manx tartan. The hills are a place of great beauty, yet for some they are also a place to work and for others a place to exercise or simply enjoy open space. Our Uplands are also home to plants and animals that whilst familiar to us, are rare and impor tant in a global and European context. Furthermore, the uplands are a rich repository of cultural and archaeological remains, which are sensitive to change and can easily be damaged by inappropriate development. Production of food is an important and obvi ous function of hill land. But surprisingly, the Manx hills provide everyday functions that most people take for granted. Peatlands, which cover most of our hills reduce the impacts of climate change by locking up carbon dioxide, collect and filter our drinking water and slow the passage of rainfall into streams and rivers, thus reducing downstream flood risk. These multiple uses are of great benefit to the economy of the Isle of Man and the well - being of its people. It is important that the hills continue to provide these benefits long into the future. Ensuring sustainable management of such a wide range of uses to the satisfaction of all interested parties whilst retaining functions essential to the well -being of the Isle of Man is of paramount importance. The Isle of Man Government is the owner and landlord for the majority of the Uplands in the East region and is therefore in a position to implement policy which will deliver the optimum range of ecosystem services. Appropriate and positive Upland management such as controlled rotational burning/cutting of heather and low intensity grazing helps to reduce the fuel load of the hill, provides firebreaks and reduces the risk of unplanned wildfires that further protects the biodiversity of the site, but also the vast amounts of carbon locked away in the peat soils. The majority of this work is carried out by The Department of Environment, Food & Agriculture's grazing and shooting tenants. The Manx Uplands are critically important from a habitat and biodiversity perspective. The hills in the East support a significant number of breeding hen harriers; however, other native Upland breeding birds such as curlew and red grouse have suffered severe declines in recent decades and as such are of high conservation concern. Strict control of access and recreational activity on vulnerable soils should be implemented to reduce soil erosion and subsequent carbon loss. Curlew and hen harriers are recognised as an internationally important species, while (within the EU) upland heather moorland is designated as a priority habitat. In order to ensure protection and positive management of the Uplands, the following proposal is appropriate: Environment Proposal 6 Uses of the Uplands that contribute to the management and preservation of this distinctive environment will be supported. Dark Skies On the Isle of Man, 26 Dark Sky Discovery Sites have been identified, of which nine are located in the East. They are classified as Milky Way Sites meaning that at these sites the Milky Way is visible to the naked eye. The sites are accessible and light pollution is limited. The following Dark Sky Discovery Sites are located within the East: • Port Soderick Upper Car Park • Port Soderick Brooghs, Little Ness Car Park • Mount Murray Golf Club • Onchan Park • West Baldwin Reservoir Car Park • Clypse Kerrowdhoo Reservoir Car Park • Conrhenny Car Park • Ballanette Nature Reserve • Axnfell Plantation Natural Environment Proposal 7 Proposals for development in the vicinity of Dark Sky Discovery Sites are to have minimal outdoor lighting and be encouraged to have a design response which is non-intrusive into the darkness of night. Baffling and directionality of lighting must be sensitive to contain any necessary lighting within a subject site only. Watercourses and Wetlands The collection of hills in the East has produced a network of mountain streams which gradually join and widen to become the rivers flowing out into Douglas Bay, Port Groudle and Laxey Bay. Several of these rivers fro m the natural boundaries between the Eastern Parishes. A non-exhaustive list of streams and rivers in the East includes: Crammag River Injebreck River Creg-y-Cowin River West Baldwin River Awin Ny Darragh Baldwin River River Glass
Environment Policy 36
Where development is proposed outside of, but close to, the boundary of a Conservation Area, this will only be permitted where it will not detrimentally affect important views into and out of the Conservation Area
Environment Policy 36: Where development is proposed outside of, but close to, the boundary of a Conservation Area, this will only be permitted where it will not detrimentally affect important views into and out of the Conservation Area. 7.31 Advertisements in Conservation Areas 7.31.1 Some advertisements found and proposed in Conservation Areas are inappropriate and do not reflect the special character and designation of the area. The design of advertisements should respect the physical appearance of the premises in order to integrate re adily with its surroundings. Traditional details, hanging signs and hand painted signage are most appropriate and will be encouraged.
Environment Policy 42
New development in existing settlements must be designed to take account of the particular character and identity
pment. 8.13.2 The extent of formal open space with in settlement boundaries in the South is identified on the Proposals Map (Map 3) and Inset Maps (Maps 4-7). The Isle of Man Strategic Plan (Environment Policy 42) seeks to protect these open spaces and indicates that: 8.13.3 "Inappropriate backland development, and the removal of open or green spaces which contribute to the visual amenity and sense of place of a partic ular area will not be permitted.''
Environment Policy 43
The Department will generally support proposals which seek to regenerate run-down urban and rural areas
the continued regeneration within Douglas, particularly around the Promenades and Quayside and Douglas Regeneration Area to create further housing, employment, retail and leisure opportunities. Environment Policy 43 of the Strategic Plan recognises that there are some areas showing signs of deterioration and degradation, limited investment, empty and underused buildings, derelict sites and generally poor environments. It suggests that areas that could benefit from regeneration should be identified in Area Plans and any schemes or proposals whether for refurbishment, environmental improvements or complete redevelopment must be formulated by involving the local community which would be directly affected by the regeneration of the area. Re-use of sound built fabric, rather than its demolition will be encouraged. Comprehensive Treatment Area Objectives The objectives are to: i. Optimise use of land and buildings; ii. Unlock difficult sites; iii. Assist with a co-ordinated approach to development; iv. Improve the urban environment and visual amenity; v. Encourage further investment; vi. Provide for space for Douglas Town Centre to grow; and vii. Improve access and provide better linkages. Area Plan Desired Outcomes The outcomes for each identified 'treatment area' will be tied to the proposed mix of uses on each site. The desired outcomes can be summarised under the following headings - many of which are interlinked: i. Urban Design and Integration a. To provide urban design outcomes which recognise the history of each area, their relationships to neighbouring land uses and features and takes into account appropriate transition from one land use to the next. ii. Infrastructure a. General/grey - to ensure that development staging is co-ordinated with the delivery of infrastructure and to create a road network that is permeable. b. Green - to e stablish appropriate public open space assets that are visually and physically linked via the local road network and associated pedestrian and cycling trails and waterways. To protect character in terms of landscape quality and nature conservation value with settlement boundaries. iii. Uses a. Provision of retail, community services, leisure without compromising the function and role of nearby activity centres, and which facilitates efficient and direct pedestrian, cyclist and vehicle movement. iv. Making a positive contribution a. To create an attractive urban environment that features tree -lined streets and attractive open spaces with high-amenity landscaping. v. Making the best use of resources a. Areas have been chosen because of their ability to complement existing town centres uses, and to take advantage of the roads and service infrastructure already in-place. b. To ensure balance between water quality, biodiversity, recreation and visual amenity while optimising developable land within settlement limits. vi. A more integrated transport network a. Provide realistic and workable alternatives to the use of private vehicles through the creation of direct links for pedestrians, cyclists and public transport users to town centre and retail areas, to schools, leisure facilities and other community assets. Key features of Comprehensive Treatment Areas in the East The proposals set out in this Plan: • Identify four CTAs in Douglas and one in Onchan; • Have a strong treatment focus on delivering quality urban environments, with a complementary mix of land uses and clear underlying visioning; • Translate to mapped areas without defined edges; • Describe the treatment which is proposed; and • Intend the period, within which that treatment is to begin , as being within 5 years beginning with the date on which the Plan is adopted. Proposed Comprehensive Treatment Areas in the East Comprehensive Treatment Area 1 - The Villiers (area is shown on Map 5) Despite planning approval for a variety of uses having been granted, much of the site remains undeveloped and has done for some time. The site has a negative effect on this prominent area of Douglas and impacts on the appearance of the Promenade as a whole. The area fronting the Promenade should either be developed or its appearance improved by creating an attractive public space. Re -development of the wider area would not be discounted, although where existing buildings are attractive and have a sound fabric, they should be incorporated into any wider scheme. The Central Douglas Masterplan suggests there is opportunity to support the intensification of the high street through the removal of some buildings on Duke Street. The Villiers site CTA is also a strategic freight corridor and maintaining access for commercial vehicles, including HGV's, must be considered in any proposed development. CTA Proposal 1 - The Villiers (Treatment Plan) Development of this area shall include office, leisure, retail, hotel, residential, entertainment venues, food and d rink uses and public open space or a combination thereof; or the laying out of
Housing Policy 1
The housing needs of the Island will be met by making provision for sufficient development opportunities
Housing Policy 1: The housing needs of the Island will be met by making provision for sufficient development opportunities to enable 5,100 additional dwellings (net of demolitions), and including those created by conversion, to be built over the Plan period 2011 to 2026. 8.4.10 Analysis of the residential land availability statistics as well as preliminary examination of the potential of existing settlements, show that there is sufficient land to satisfy the demand for housing in lin e with the existing Island Spatial Strategy up until 2026. It is acknowledged that some land in and around the Main Centre (Douglas) is limited and that land designated on some extant development plans has been slow at coming forward for development. There appear to be a number of reasons for this ranging from the unwillingness of land owners to release land for development, the quality and location of that land , through to economic pressures; all of which may partly explain the decline in planning applica tions being submitted for new dwellings over the last decade or more. It will be necessary to address any land shortages as well as the suitability and deliverability of residential land as part of the preparation of the Area Plans.
Housing Policy 5
Housing Policy 5: In granting planning permission on land zoned for residential development or in predominantly residential areas the Department will normally require that 25% of provision should be made up of affordable housing. This policy will apply to developments of 8 dwellings or more. The term affordable housing is defined by the Department as housing which is either: directly provided by the Department; or directly provided by Local Authorities; or meets the criteria for the Department's House Purchase Assistance Scheme 2004 (and any successor schemes approved by Tynwald). 8.7 New Housing in Existing Settlements 8.7.1 Recent Local Plans and Area Plans have included development briefs guiding the design and layout of land which is zoned for residential use. Such briefs should not needlessly prescribe design, but should indicate site-specific constraints, the need for provision of public facilities or amenities (such as play areas, neighbourhood shops, or land for schooling, open space, or road improvements), and, if appropriate, the maximum or minimum density and the need for the inclusion of an element of affordable housing. Where these briefs state that an optimum density should be achieved this should not be used as an argument for higher density development which has an adverse effect on the residential amenity of adjoining properties or the character of the area.
Business Policy 1
The growth of employment opportunities throughout the Island will be encouraged
Business Policy 1: The growth of employment opportunities throughout the Island will be encouraged provided that development proposals accord with the policies of this Plan. 9.1.3 This chapter concent rates on the land use implications of business activity, including industry, storage and distribution, office and commercial development, retailing and tourism. 9.1.4 In respect of employment land availability, the Department has undertaken and published an Employment Land Availability Study (1). A summary of this is included in Appendix 9. Across the Island there are some 118 hectares of land allocated for industrial development. Much of this is concentrated around Ballasalla and the Airport. There is, however, a spread of land available across the Island to support employment and regeneration opportunities in each area. Such land will be important to support the regeneration of the Service Centres and the Gateway and Employment role of the Airport area. 9.1.5 The Douglas area has seen by far the bulk of the industrial land take up in recent decades and much of the land allocated for such purposes has been taken up. This is why the Department has resolved to proceed with a Development Order for the development of some 20 hectares of employment land to the south of Cooil Road. A recent report on the take up of industrial land in the Douglas area indicates that it has been faster than anticipated and at current rates that all the land will be required by 2015. While the situation will be subject to detailed assessment in the preparation of the Plan for the East, the Department is satisfied that the release of additional land is both necessary and appropriate at this stage. 9.1.6 The Department has also reviewed planning permissions for office development. The majority of these are focused in the Douglas area. Take up has been low in recent years with the exception of certain relocations to corporate headquarters, such as Skandia. There are a number o f sites still available for new office development, in addition to the existing stock. Of note is the recent trend for sites with office consents to subsequently secure planning permission for residential use. The most notable example being the final pha se of the Villiers development, which now has a residential permission in addition to its partly - implemented office consent. 9.1.7 The following information has been extracted from the Review of Economic Strategy (Treasury 2003) which formed part of the background to the Economic Strategy 2004 approved by Tynwald in October that year. (1) Employment Land Availability Study DLGE 2007 9.1.8 The Isle of Man has enjoyed unprecedented economic success in the last ten years. Over this period annual gross domestic product, or GDP (the value of the economy' s output of all goods and services), has more than doubled in real terms (both absolute and per capita) such that from a deficit of around one quarter, per capita GDP in the Isle of Man now exceeds that of the UK by 7% and the average for the European Union (EU 15) by 10%. 9.1.9 The period 1993 - 2000 saw the economy not only expanding but doing so at an accelerating rate, before slowing in 2000/01. Since 2001 the economy has continued to grow at around 5% per annum (the latest national income accounts revealed growth of 5.9% in 2002/03), meaning that, after the recession in the early 1980's the Isle of Man economy has recorded economic growth in each of the last twenty years. 9.1.10 This economic performance has been led by the financial and related se rvices sectors. The finance industry grew by over 80% between 1996 and 2001 alone. But the table below illustrates that probably all areas of Manx economy are today generating more income in real terms than a decade ago, even it the relative importance o f some, most noticeably manufacturing, has declined. Table One - Sectoral Contributions to National Income 1992/93 v 2000/01 (at 2000/01 prices) Contributions to National Income (£) Real Increase in income generated (%) 1992/93 % 2000/01 % Manufacturing 72.0 11 76.7 6 6.5 Finance 229.7 35 505.4 41 120.0 Tourism 41.0 6 67.7 6 65.1 Agriculture/Fishing 11.7 2 15.8 1 35.0 Construction 46.7 7 89.6 7 91.9 Professional Services 96.7 15 186.1 15 92.4 Utilities, Distribution and Miscellaneous Services 133.1 20 223.8 18 68.1 Pubic Administration 34.6 5 53.6 4 54.9 Total 665.5 100 1,218.7 100 83.1 9.1.11 National income data aside, the clearest indication of the economic success enjoyed by the Island in recent times comes from the labour market. Census results show that the workforce increased from 33,189 in 1991 to 39,685 by 2001, an increase almost identical to that in the total resident population over the period. But the number seeking emp loyment but who were unemployed at the time halved from 1,360 to 635. 9.1.12 Changes in the underlying structure of the economy reflected in the national income accounts are further depicted in the Census statistics below showing the distribution of labour between the different sectors of the economy. Table Two - Employment by Sector 1991 v 1996 1991 1996 2001 No. % No. % No. % Agriculture and Fishing 1,240 3.9 938 2.8 543 1.4 Manufacturing 3,348 10.5 3,562 10.6 3,185 8.2 Construction 3,404 10.7 3,372 10.0 2,512 6.4 Utilities1 513 1.6 462 1.4 515 1.3 Transport and Communications 2,437 7.7 2,688 8.0 2,970 7.6 Wholesaling and Retailing 3,844 12.1 3,692 11.0 4,372 11.2 Finance 4,353 13.7 5,942 17.7 8,959 22.9 ICT2 n.a n.a n.a n.a 361 0.9 Professional Services 5,438 17.1 6,081 18.1 7,296 18.7 Tourist Accommodation 856 2.7 765 2.3 743 1.9 Entertainment and Catering 1,403 4.4 1,156 3.4 2,116 5.4 Miscellaneous Services 2,849 9.0 2,768 8.2 2,373 6.1 Public Administration 2,144 6.7 2,146 6.4 3,105 8.0 Total 31,829 100.0 33,5773 100.0 39,050 100.0 Notes: 1 Electricity, gas and water 2 Not separated out from other sectors until 2001 3 Includes 5 where occupation not recorded 9.2 Industry and Storage and Distribution 9.2.1 The nature of industrial activity on the Island changed very considerably during the last century. The previously dominant primary industries of fishing and agriculture now contribute only 1% to the Gross Domestic Product (GDP) and provide only 1.4% of our total employment, whereas manufacturing contributes 6% to the GDP and provides 8.2% of our employment, and the construction industry contributes 6% to the GDP and provides 6.4% of our employment. Storage and distribution has also become a more important activity, particularly in terms of the demands it makes on land, buildings, and access requirements. 9.2.2 Most of the Island's industry is located close to major transportation links, particularly in the case of Douglas, Braddan and Ballasalla, which all have convenient access to Ronaldsway airport and Douglas harbour. Ramsey and Peel harbours are used for the importation and exportation of large scale good s (fuel, building supplies etc). All of these are conveniently accessible to significant pools of labour. In order to minimise excessive transportation of goods and travel for employees, and to promote sustainable development, much of the Island's future industrial development should continue to be concentrated in these locations, and appropriate areas of land should be made available for such uses in the Area Plans for these parts of the Island. It will also be appropriate, when formulating Area Plans for our smaller settlements, to make provision for the continued operation of small -scale family businesses, particu
Business Policy 7
New office floor space should be located within town and village centres
Business Policy 7: New office floor space should be located within town and village centres on land which is zoned for the purpose on the appropriate area plan; exceptionally, permission may be given for new office space (a) on approved Business Parks for Corporate Headquarters which do not involve day to day callers; or (b) in buildings of acknowledged architectural or historic interest for which office use represents the only or most appropriate practicable and economic way of securing future use, renovation and maintenance.
Recreation Policy 3
Where appropriate, new development should include the provision of landscaped amenity areas
Recreation Policy 3: Where appropriate, new development should include the provision of landscaped amenity areas as an integra l part of the design. New residential development of ten or more dwellings must make provision for recreational and amenity space in accordance with the standards specified in Appendix 6 to the Plan. 10.3.9 Open Space in new developments should be provid ed within the site, but where it is impractical to provide the recreational space within the site, consideration may be given either to (a) provision off-site, but conveniently close thereto; or to (b) the use of commuted sums, which, under the terms of a section 13 Agreement, would be paid to the Local Authority as a contribution towards the provision of community recreational open space. Further details of these requirements are included in Appendix 6.
Transport Policy 1
New development should, where possible, be located close to existing public transport facilities and routes
Transport Policy 1: New development should, where possible, be located close to existing public transport facilities and routes, including pedestrian, cycle and rail routes.
Urban Environment Proposal 3
Development proposals must make a positive contribution to local character and distinctiveness
Urban Environment Proposal 3 Development proposals must make a positive contribution to local character and distinctiveness. Traditional or contemporary approaches may be appropriate, depending upon the nature of the proposal and the context of the surrounding area. Creative Re-use As stated in the Strategic Plan, Paragraph 7.25: 'Conservation of the built environment and archaeological features should be viewed as an asset to be promoted and not as a constraint to be overcome'. It is recognised that retaining the best examples of built heritage for future generations benefits the resident population by celebrating its unique national identity and increasing the sense of wellbeing and improved quality of life brought about by beautiful surroundings. The value of mid and late-20th Century architecture should not be ignored as the best examples of these periods contribute to a rich and vibrant built heritage. Supporting the continued use and retention of these buildings requires a pragmatic and dynamic understanding of different potential uses. A proposed use which retains a building of heritage value, but requires modification to that building, is superior to a proposal which leads only to demolition or decay of that building.
Condition 1
- 1. The development hereby approved shall be begun before the expiration of four years from the date of this decision notice. Reason: To comply with Article 26 of the Town and Country Planning (Development Procedure) Order 2019 and to avoid the accumulation of unimplemented planning approvals.
Condition 2
- 2. Prior to the occupation of any building hereby approved the Visibility splays as shown on Drawing No: 21/432/TR/001 Rev E shall be provided and maintained at all times free from any obstruction at height not exceeding 1.05m above the level of the adjacent highway carriageway. Reason: In the interest of highway safety
Condition 3
- 3. Prior to the occupation of any building hereby approved the new accesses as shown on Drawing No: 21/432/TR/001 Rev E shall be provided and retained thereafter. Reason: In the interest of highway safety
Condition 4
- 4. The development hereby approved shall not be occupied or operated until the parking and turning areas have been provided in accordance with the approved drawings - 2108-PL-3003, 2108-PL-3006, 2108-PL-3010, 2108-PL-3309. Such areas shall not be used for any purpose other than the parking and turning of vehicles associated with the development and shall remain free of obstruction for such use at all times. Reason: To ensure that sufficient provision is made for off-street parking and turning of vehicles in the interests of highway safety.
Condition 5
- 5. The development hereby approved shall not be occupied or operated until the cycle parking areas have been provided in accordance with the approved drawings 2108-PL-3110 and 2108-PL-3310. Such areas shall not be used for any purpose other than the cycle parking associated with the development and shall remain free of obstruction for such use at all times. Reason: To ensure that sufficient cycle provision is made for the development which has under provision of car parking.
Condition 6
- 6. The submitted Travel Plan hereby approved shall be implemented in accordance with the measures set out therein and within three months of occupation evidence of the implementation of measures set out in the Travel Plan shall be prepared, submitted to and agreed with the Department in writing unless alternative timescales are agreed in writing. Reason: to mitigate the under provision of on-site parking and to ensure the sustainable travel options are undertaken as proposed.
Condition 7
- 7. Prior to the commencement of the development hereby approved further details of the tree removal proposed within the groups, G1, G2, G3, G5 and G6 marked on the tree impact plans (TRN-240322 & TRS-24322) must be submitted to and agreed with the Department and shall include further details for acceptable tree protection measures. Reason: to provide clarity on exactly which trees are being removed within affected tree groups, ensuring tree loss on the site is minimised and that the legislation providing protection to retained trees is enforceable.
Condition 8
- 8. No retained tree shall be cut down, uprooted, or otherwise destroyed during the development phase, other than in accordance with the approved plans. In the event that existing trees marked for retention die or become damaged or otherwise defective prior to commencement or during the construction phase due to events outside the applicants control, the Department shall be notified as soon as reasonably practicable and remedial action agreed and implemented. Reason: Required to safeguard and enhance the character and amenity of the area, to provide ecological, environmental and bio-diversity benefits and to maximise the quality and to enhance its setting within the immediate locality.
Condition 9
- 9. All planting, seeding or turfing comprised in the approved details of landscaping (including tree planting) as shown within Cowley White Landscaped Design Planting Plan (Drawings no. 002-KGC-REV A and 003-KGC-REV B) dated 30th March 2022 and the Planting Schedule/Key dated 28th April 2022must be carried out in the first planting and seeding seasons following the completion of the development or the occupation of the hereby approved office/residential units, whichever is the sooner. Any trees or plants which within a period of five years from the completion of the development die, are removed, or become seriously damaged or diseased must be replaced in the next planting season with others of a similar size and species. The hard landscaping works shall be completed in full accordance with the approved details prior to the first occupation of the hereby approved office/residential units. - Reason: To ensure the provision of an appropriate landscape setting to the development.
Condition 10
- 10. No site works or clearance shall be commenced until protective fences which conform with British Standard 5837:2012 (or any British Standard revoking and re-enacting British Standard 5837:2012 with or without modification) have been erected around any existing trees and other existing or proposed landscape areas as shown in drawing OTP240322 (Manx Roots - Tree Protection Plan) or otherwise agreed with the Department (Condition 7). Unless and until the development has been completed these fences shall not be removed and the protected areas are to be kept clear of any building, plant equipment, material, debris and trenching, with the existing ground levels maintained, and there shall be no entry to those areas except for approved arboricultural or landscape works. Reason: To safeguard the areas to be landscaped and the existing trees and planting to be retained within the site.
Condition 11
- 11. Prior to the commencement of the development hereby approved a Construction Environmental Management Plan (CEMP), to be provided to Planning for written approval prior to any works(excluding site clearance), including enabling works, taking place. The CEMP will need to contain details of the roles, responsibilities, training, procedures and monitoring on site which will ensure that the environment is protected during all phases of the development and all environmental legislation and policy is adhered to. The CEMP will need to incorporate the following avoidance and mitigation measures and the works must be undertaken in strict accordance with these measures: - o A precautionary working method statement which demonstrates how construction and site operations will avoid and mitigate detrimental impacts on birds - timescales for vegetation removal and suitable checks by an ecologist. - o A precautionary working method statement which demonstrates how construction and site operations will avoid and mitigate detrimental impacts on bats - pre-felling inspections - of trees with potential roost features by a suitable qualified ecological consultant and responsible tree removal methodologies, use of bat sensitive construction lighting, storage plans for vehicles and equipment, action to be taken should bats be encountered during constructions works, measures to be taken should any additional trees be identified for removal, including prefelling inspections by an ecologist and additional mitigation should potential roost features be found. - o A precautionary working method statement which demonstrates how construction and site operations will avoid and mitigate detrimental impacts on common lizards - reasonable avoidance measures for lizards, and measures to be taken should lizards be encountered during construction works. - o Details of the measures to be taken to prevent the surrounding woodland from the damaging impacts of dust, noise, sediment runoff, and bioharmful pollutants. - o Details of the measures to be taken to prevent damage or disturbance to the surrounding boundary trees and woodland - construction exclusion zones and use of protective fencing which shall be maintained throughout the works and which is replaced promptly should it become damaged. - o Responsible removal methodologies for the Schedule 8 invasive plants Montbretia and griselinia. All the agreed measures shall be adhered to in full. Reason: To ensure that the environment is protected during all phases of the development and all environmental legislation and policy is adhered to.
Condition 12
- 12. Prior to the occupation or use of the development hereby approved an Ecological mitigation plan, to be provided to Planning for written approval, which includes the following; - o Details of bat and bird boxes to be installed around the site, including on trees and buildings. Details should include the numbers to be installed, their location and type, and timescales for their installation - boxes on the retained trees should be installed prior to any further vegetation removal. Bat boxes should include boxes suitable for both crevice and cavity roosting species and bird boxes should include both open fronted and entry hole boxes; - o Further details about the construction and maintenance of the wildlife pond; - o Details of stumpery/log pile habitats to be created around the edge of the site; - o Details of a new bug hotel/s which are to be created on site; - o Details of at least 5 habitat planters to be installed around the site; - o Details of the additional measures which will be put in place should bird strikes still be an issue on the glass fronted building, even after the application of the solar control glass coating; - o Specifications for the brown roof, including a species list suitable for the Isle of Man; All the agreed measures shall be adhered to in full prior to the occupation/operation of any building. Reason: To ensure a net biodiversity gain and all environmental legislation and policy is adhered to.
Condition 13
- 13. Prior to the occupation or use of the development hereby approved a detailed internal lighting plan throughout the site to ensure protection of bats/birds and to ensure appropriate protection of the nearby identified Registered Building/Conservation Area shall be submitted in writing for approval by the Department and the approved scheme shall be fully adhered to and retained thereafter. Reason: To ensure adequate protection of protected species and ensuring appropriate protection of the visual amenities of nearby identified Registered Building/Conservation Area.
Condition 14
- 14. Prior to commencement of any works, details shall be submitted in writing to the Department for approval which shows the surface water drainage arrangements for the raised pedestrian crossing at the junction of Victoria Road and Switzerland Road. Further details showing how any surface water runoff from the proposed entrances will be prevented from draining onto the adjacent public highway and where such water will be drained to. The approved details shall be completed prior to the occupation of the development. Reason; In the interests of surface water runoff and highway safety.
Condition 15
- 15. Prior to the commencement of any works (excluding enabling working) a detailed plan showing further details of the existing and proposed culvert running through the site (as indicated in Flood Management Division email dated 11th August 2022) shall be submitted in writing for approval by the Department and this approved scheme shall be completed prior to the occupation/operation of any building on the site and retained thereafter. Reason: In the interest of flood risk.
Condition 16
- 16. No development shall commence until a schedule of materials and finishes and samples of the materials to be used in the construction of the external surfaces, including roofs, have been submitted to and approved in writing by the Department. The development shall not be carried out unless in accordance with the approved details. - Reason: In the interests of the character and appearance of the site and surrounding area.
Condition 17
- 17. Prior to the commencement of any development hereby approved a detailed external lighting plan throughout the site to ensure protection of bats/birds and to ensure appropriate protection of the nearby identified Registered Building/Conservation Area shall be submitted in writing for approval by the Department and the approved scheme shall be fully adhered to and retained thereafter. Reason: To ensure adequate protection of protected species and ensuring appropriate protection of the visual amenities of nearby identified Registered Building/Conservation Area.
Erection of four small office units with associated car parking, drainage, hard and soft landscaping works (resubmission of PA 11/00178/B)
Isle Of Man Enterprises Plc.
Erection of four office units with associated car parking, drainage and hard and soft landscaping works
Shoprite Group Plc.
Erection of office building with two apartments, car parking and new access road
Shoprite Plc
Approval in principle to business science park and hotel and associated car parking
Project Management Ltd
Master plan of business technology park
Shoprite Group Ltd.