Planning Approval Decision Notice
Application Ref. No:08/00338/B
Ref: CD/PT/AA
Isle of Man Town and Country Planning Act 1999
The Town and Country Planning (Development Procedure) Order 2005
Balderton Consulting Ltd C/o Wilson & Collins Ltd Balthane Industrial Estate
Ballasalla
IM9 2AJ
In pursuance of powers granted under the above Act and Order the Department of Local Government and the Environment does hereby APPROVE the following application made on behalf of:
Name: Balderton Consulting Ltd Proposal: Erection of industrial units at: Land To Rear Of Balderton Court
Balthane
Ballasalla
Isle Of Man
which was considered on 19th May 2008, subject to compliance with the conditions specified below. Date of Issue: 28th May 2008 Murray House Mount Havelock
Douglas
Deputy Secretary Planning
Committee
Schedule Of Conditions:
- The development hereby permitted shall commence before the expiration of four years from the date of this notice.
- This permission relates to the erection of an industrial building with associated parking as shown in drawings GA 300A received on 16th April, 2008 and GA1 1250/B, GA 1, GA 4 all received on 18th February, 2008.
- The building may be used only for general industrial purposes including storage and/distribution.
- There must be no discharge of surface water to the main foul sewer.
08/00338/B
- The proposed development must be connected to the main foul sewer.
NOTE: A Drainage Connection Fee will be payable to the Drainage Authority on this development
NOTE The applicant is advised that there are Underground Cables/Overhead Lines present in the area indicated in the planning application. Please contact Anthony Kinrade or Ian Horsey, Operations and Maintenance Department, Network Services, Manx Electricity Authority, (Tel. 687687) to discuss working practices around Cables and Overhead Lines which may need to be diverted before any work can be carried out on site.
The applicant is also advised to contact the Manx Electricity Authority for Electrical Site Safety 5 documents, (Tel. 687766), before any work is carried out on site. All work to be carried out with reference to Health and Safety Executive Guidance Notes HS(G)47 and GS6.
NOTE The applicant is advised to contact the Manx Electricity Authority Planning Department (Tel. 687781), to discuss the electricity supply for this application.
This decision was made by the Director of Planning and Building control in accordance with the authority delegated to him under Article 3(13) of the Town and Country (Development Procedure) Order 2005.
Guidance Note This permission refers only to that required under the Town and Country Planning (Development Procedure) Order 2005. Any appeal against this decision must be in writing and must be received by this Department within 21 days of the date of this notice.
A form and guidance notes are available from either the Planning Office, Tel 685950, or to download from the Department's website www.gov.im/dlge/planning/plan/applications/decision.xml
Please note that a copy of the Officer's report which led to the decision, together with correspondence relative to the application, is available for inspection at the Department.
The proposed development must not be commenced until either:
- The time for requesting an appeal has expired; or
- Any appeal has been determined;
Whichever is the later.
08/00338/B