17 May 2007 · Delegated
Renscault Farm, East Baldwin, Isle Of Man, IM4 5ep
This application sought permission to create a new vehicular access and track at Renscault Farm, East Baldwin, Isle of Man. The proposal was assessed under delegated authority by the Director of Planning and Building Control. The principal planning consideration identified in the officer report was whether adequate visibility splays could be provided at the new access. This was found to be acceptable, and the application was permitted with three conditions attached to the approval.
The application was approved by the Director of Planning and Building Control under delegated authority. The key planning consideration was whether adequate visibility splays could be achieved for the new access, and this was found to be satisfactory.
Planning Circular 1/06
site must include provision for a footpath link to join the site to the north allowing pedestrian access from the Main Road to the Colby Glen Road, via Site 13 and the site being developed under 11/0684/B. Advice must be sought from the Highway's Division (DoI) prior to any application being made. 5. Development plans must include ground level information and cross sectional drawings to show the relationship of any new dwellings with existing dwellings in Ballacriy Park which appear to be at a lower level than the Ballacubbon land.
Condition 1
The development hereby permitted shall commence before the expiration of four years from the date of this notice.
Condition 2
This approval relates to Drawing Numbers 06/J009 - 01; 02; 03 and letter, submitted as part of this application and date stamped 1st February 2007.
Condition 3
No approval is hereby granted or implied for the erection of lighting along the length of the driveway.