Planning Approval Decision Notice
Isle of Man Town and Country Planning Act 1999
The Town and Country Planning (Development Procedure) Order 2005
Lagan Construction (IOM) Ltd 9 Auckland Terrace Ramsey IM8 1AF
In pursuance of powers granted under the above Act and Order the PLANNING COMMITTEE of the Department of Local Government and the Environment does hereby APPROVE the following application made on behalf of:
Name: Department Of Transport Proposal: Installation of an additional cake silo at: Meary Veg Sewage Treatment Works Balnahowe Santon Isle Of Man IM4 1HL
which was considered on 30 March 2007, subject to compliance with the conditions specified below.
Date of Issue: 30 April, 2007 Murray House Mount Havelock Douglas
Schedule Of Conditions:
- The development hereby permitted shall commence before the expiration of four years from the date of this notice.
- This permission relates to the erection of a cake silo as shown in drawings reference 9018/001 and 9018/002 both received on 2nd February, 2007.
- The external finish of the silo must be coloured to match that of the existing.
This decision was made by the Planning Committee constituted in accordance with Article 3(1) of the Town and Country Planning (Development Procedure) Order 2005.
This permission refers only to that required under the Town and Country Planning (Development Procedure) Order 2005.
Any appeal against this decision must be in writing and must be received by this Department within 21 days of the date of this notice.
A form and guidance notes are available from either the Planning Office, Tel 685950, or to down load from the Department’s website www.gov.im/dlge/planning/plan
You should note that a copy of the Officer’s report which led to the decision being made, along with any correspondence relative to the application, is available for inspection at the Department.
The proposed development must not be commenced until either;
- The time for requesting an appeal has expired; or
- Any appeal has been determined;
Whichever is the later.