14 July 2006 · Delegated
Land To Rear Of Olinda, South Cape, Laxey, Isle Of Man, IM4 7jr
This application sought approval in principle for the erection of a dwelling with a garage on land to the rear of Olinda South Cape, Laxey, Isle of Man. The site is accessed via a private road shared with a number of other properties. The application was permitted on 14 July 2006 under delegated authority, with the officer recommending approval. Four conditions were attached to the permission. The consent was subsequently extended by two years in April 2008, and a further request for an extension of time was received in April 2010, indicating the development had not been completed within the original timeframe.
The application was permitted on 14 July 2006 under delegated authority. The officer recommended approval and the decision was made by the Director of Planning and Building Control. The consent was later extended, with a two-year extension agreed in April 2008 and a further extension request received in April 2010.
Laxey and Lonan Area Plan
the residential development of the site is in accordance with local plan policy
Condition 1
This approval is in principle only and will remain valid for a period of two years within which time no development may take place until such time as details of the reserved matters (siting, design, external appearance, internal layout, means of access, landscaping) have been approved by the Planning Authority. Such reserved matters should form the subject of a single application.
Condition 2
This approval relates to the location plan date stamped the 30th March 2006.
Condition 3
The proposed development must be connected to the main foul sewer.
Condition 4
There must be no discharge of surface water to the main foul sewer.
Approval in principle for the erection of a dwelling on the application site
material to the assessment of this current planning application
Approval in principle for the erection of a dwelling on the application site
material to the assessment of this current planning application