15 August 2025 · Delegated
Springbank, Baldrine Road, Baldrine, Isle Of Man, IM4 6eb
Permission was granted for a front extension to an existing attached garage at Spring Bank, Baldrine Road, Baldrine. The property is a two-storey house on a corner plot where Baldrine Road meets the Manx Electric Railway, with its front elevation facing the railway line and its rear facing Baldrine Road. The officer report identified character and appearance, highways impact, and flooding as the main planning considerations. The site retains space for two vehicles to park to the rear of the property. The application was determined under delegated powers and approved on 15 August 2025, subject to one condition.
The Department of Environment, Food and Agriculture approved the application on 15 August 2025. The key planning issues considered were the extension's impact on the character and appearance of the area, any highways effects, and flooding. The proposal was found acceptable across all these areas.
general standards towards acceptable development
The proposal complies with General Policy 2
General Policy 2: Development which is in accordance with the land-use zoning and proposals in the appropriate Area Plan and with other policies of this Strategic Plan will normally be permitted, provided that the development: (a) is in accordance with the design brief in the Area Plan where there is such a brief; (b) respects the site and surroundings in terms of the siting, layout, scale, form, design and landscaping of buildings and the spaces around them; (c) does not affect adversely the character of the surrounding landscape or townscape; (d) does not adversely affect the protected wildlife or locally important habitats on the site or adjacent land, including water courses; (e) does not affect adversely public views of the sea; (f) incorporates where possible existing topography and landscape features, particularly trees and sod banks; (g) does not affect adversely the amenity of local residents or the character of the locality; (h) provides satisfactory amenity standards in itself, including where appropriate safe and convenient access for all highway users, together with adequate parking, servicing and manoeuvring space; (i) does not have an unacceptable effect on road safety or traffic flows on the local highways; (j) can be provided with all necessary services; (k) does not prejudice the use or development of adjoining land in accordance with the appropriate Area Plan; (l) is not on contaminated land or subject to unreasonable risk of erosion or flooding; (m) takes account of community and personal safety and security in the design of buildings and the spaces around them; and (n) is designed having due regard to best practice in reducing energy consumption. 6.3 Development outside of areas zoned for development
flood risk
irements of the relevant gas supply agency. Flood Risk 63 There was widespread concern about the adequacy of drainage and the risk of flooding, particularly in parts of Braddan, Onchan and Laxey. Environment Policy 10 of the Strategic Plan indicates that where development is proposed on any site where there is a potential risk of flooding, the prospective developer will be required to submit a flood risk assessment, together with details of proposed mitigation measures. This approach is reinforced in Utilities Proposal 6 of the draft Area Plan, which (among other things) requires the incorporation of Sustainable Drainage Systems (SuDS) into new developments, to attenuate the rate of surface water run-off. I consider these policies to be reasonable. Clearly, without adequate mitigation measures, new building should normally be resisted on land which is at serious risk of flooding, or where the proposed development would increase the flood risk elsewhere. 64 In my view, the format of Utilities Proposal 6 could be improved. First, as a Proposal of the Area Plan, I consider that it should be in a bold typeface, to differentiate it from the supporting text. (The same applies to a number of other policies e.g. Transport Policy 2, and Utilities Policies 2 and 5). Second, there appears to be an error of syntax at the start of the second sentence of Utilities Proposal 6, which should perhaps read 'Strategies to achieve this will include …'. Third, the third bullet point of this Proposal introduces SuDS. Subsequent bullet points describe features of SuDS, and are therefore subordinate to the third bullet point. For clarity, I consider that they should be indented. I recommend that the draft Area Plan be modified accordingly. Sewage Treatment 65 There was also some public concern about the adequacy of the sewerage system, both in terms of its capacity to accommodate the effluent from proposed residential development areas, and in terms of the current practice of discharging untreated sewage into the sea. Infrastructure Policy 1 of the Strategic Plan indicates that developments entailing the erection of multiple dwellings should take place only on sites that will ultimately be connected to the IRIS system, which takes sewage to a treatment works at Meary Veg. (IRIS is an acronym for Integration and Recycling of the Island's Sewage). However, as long ago as 2006/7, a review was undertaken to decide whether to continue with the IRIS strategy. This concluded that it would be beneficial to adopt a regional sewage treatment strategy (RSTS) for those settlements that were not already connected to the IRIS system, including Laxey, Baldrine and settlements in the Central Valley. To that extent, Infrastructure Policy 1 of the Strategic Plan is now out of date. 66 I understand that a planning application will soon be submitted for the development of a local sewage treatment facility for Laxey. Feasibility studies for the provision of a similar facility to serve Baldrine are ongoing. A replacement sewage works at Ballagarey, serving part of the Central Valley became operational in 2018. However, capacity limitations mean that planned development in Crosby is likely to have to rely on standalone sewage treatment for the time being, until the existing treatment works is replaced as anticipated in 2022. The Programme for Government (2016-2021) indicates an intention to complete the regional sewage treatment infrastructure within the lifetime of the present administration. 67 It seems to me that these considerations should be taken into account in the allocation and phasing of land for development. I will return to this matter when considering the draft Area Plan's proposals for housing. Electricity Renewable Energy 68 Peel Energy considered that the Area Plan should contain a detailed and specific chapter on renewable energy, providing measurable criteria against which applications for the development of renewable power generating facilities would be assessed. They cited the States of Jersey Island Plan 2011, which includes such material. And they pointed out that a Climate Change Emergency has recently been declared on the Isle of Man; that a Climate Change Bill is soon to be presented to Tynwald; and that there has been strong public support for the Government's Climate Change Mitigation Strategy. They argued that, in failing to provide detailed guidance on renewable power generation, the Area Plan was inconsistent with the Strategic Plan; and that since the Area Plan post-dated the Strategic Plan, its largely negative provisions would prevail. 69 Energy Policy 4 of the Strategic Plan applies to development proposals for renewable energy generated by wind, water, tidal or solar power. It indicates that any such proposals will be judged against that Plan's environmental objectives. Proposals for wind, water or tidal power would need to be supported by an Environmental Impact Assessment. The supporting text indicates that renewable energy schemes will be given similar scrutiny as is gi
Manx Electric Railway
the proposal as a whole will not detract from the MER line, and would comply with Transport Policy 3
Transport Policy 3: New development on or around existing and former rail routes should not compromise their attraction as a tourism and leisure facility or their potential as public transport routes, or cycle / leisure footpath routes. 11.3 Highways and Traffic 11.3.1 The ability of new and existing highways to safely and efficiently accommodate the traffic generated by new development is an important factor when considering the location and layout of new development. Not only must the tr affic routes involved be of a size which is capable of taking the projected volume of traffic but they must also be designed so that points of potential traffic conflict such as junctions and roundabouts are in an appropriate location and of a suitable des ign, including provision for pedestrians. The need for new and improved highways in order to facilitate new development must be balanced against the environmental objectives of this plan.
parking standards
Transport Policy 7: The Department will require that in all new development, parking provision must be in accordance with the Department's current standards. The current standards are set out in Appendix 7. 11.5.4 New development can have a significant impact in terms of the traffic generated by it and the impact on the various modes of travel. The Department considers that proposals which are likely to be significant traffic generators should be accompanied by a Transport Assessment(1) which should look at all modes of transport including access by public transport, cycling and on foot.
Condition 1
The development hereby approved shall be begun before the expiration of four years from the date of this decision notice.