6 April 2017 · Committee
Field 414526, Track From Balnahowe Road, Ballnahowe, Port Erin, Isle Of Man, IM9 6jf
The application, submitted by Cheeseden Investments Limited, sought permission to erect three 10 kW wind turbines on a small piece of agricultural land at Ballaman, Ballnahowe Road, Port Erin. The scheme was amended in February 2017 to address concerns raised during the process. Under the revised design, each turbine would stand 15 metres high with a 7-metre turning diameter, arranged in a north-to-south line with 22 metres between each turbine. The Department of Environment, Food and Agriculture refused the application on 6 April 2017. Two formal reasons were given: the applicant had not demonstrated that the turbines would not interfere with the safe operation of the Isle of Man Airport, and the visual impact on the surrounding landscape — including views from Port Erin, the coastal footpath, and the elevated Mull Circle — was considered so harmful that it could not be justified by the environmental benefits of the scheme. The officer report also identified concerns about impacts on local ecology and the living conditions of nearby residents.
The application was refused by committee. Two reasons were given: first, it had not been shown that the turbines would not pose a risk to aircraft safety at the Isle of Man Airport; second, the visual harm to the landscape around Port Erin — particularly from the coastal footpath and the Mull Circle — was considered too significant to be outweighed by the renewable energy benefits of the proposal.
Refusal Reasons
Development involving alternative sources of energy supply, including wind, water and tide power, and the use of solar panels, will be judged against the environmental objectives and policies set out in this Plan. Installations involving wind, water and tide power will require the submissions of an Environmental Impact Assessment.
The countryside and its ecology will be protected for its own sake.
Other Strategic Plan policies which are considered relevant
Area Plan for the East sets out locally-applicable means for implementing the policies set out in the Isle of Man Strategic Plan 2016. In that Strategic Plan, we find the Environment Policies. Environment Policy 1 states: The countryside and its ecology will be protected for its own sake. For the purposes of this policy, the countryside comprises all land which is outside the settlements defined in Appendix 3 at A.3.6 or which is not designated for future development on an Area Plan. Development which would adversely affect the countryside will not be permitted unless there is an over- riding national need in land use planning terms which outweighs the requirement to protect these areas and for which there is no reasonable and acceptable alternative. Maintaining the purpose of this Area Plan as a means of implementation, there is some further direction to be found in the Strategic Plan, at paragraph 7.2.1: 'Whilst landscape and coastal change is inevitable, and in some cases desirable, the emphasis must be on the appropriateness of this change and the balance or equity between the needs of conservation and those of development. The primary goal must therefore be to respect, maintain and enhance the natural and cultural environment including nature conservation and landscape and coastal quality, and ensure its protection from inappropriate development.' Given the comprehensive nature of the Isle of Man Strategic Plan's Environmental Policies, only a small number of additional Proposals and Recommendations are necessary. In order to produce an implementable Area Plan for the East it is necessary to recognise those statutory desig nations and strategies which whilst having an Island-wide scope are highly relevant to the protection of environments within the Plan Area. An example is the UNESCO Biosphere status afforded to the Isle of Man. Island-level strategies identify crossborder issues and take account of the cumulative impacts of human engagement with nature. Area Plan Objectives i. To protect, conserve and enhance the natural and cultural environment of the plan area and promote biodiversity. ii. To improve the function, usability and provision of our green infrastructure and public spaces by providing a network of green spaces and features which are connected and where possible, accessible to the public. iii. To manage and improve flood risk and improve drainage conditions. iv. To support the working countryside and its custodians in maintaini ng a sustainable rural economy. Area Plan Desired Outcomes i. Where approved, d evelopment will be ecologically sustainable and designed to protect and where possible enhance biodiversity as well as mitigate and adapt to the effects of climate change. ii. The Green Infrastructure network will be established and fostered, connecting people with nature in a way that achieves the best shared outcomes for the urban and natural environment. iii. Statutory and non-statutory designations will continue to provide protection to the most important and most vulnerable cultural assets, habitats and environments in the plan area. iv. Beyond the towns and villages, the area as a whole will retain its landscape setting including its important visual interaction with the central uplands, central valley, coast and marine environment. Natural Environment Proposal 1 The Department supports the protection, creation and improvement of green infrastructure in the East, particularly in those locations which have the potential to be part of a Green Infrastructure Network. Applications for development must take into account any approved Government Green Infrastructure Strategies, but in any case, must identify how development proposals intend to contribute to the long term provision of a network of connected green spaces. UNESCO Biosphere In 2017, the Isle of Man became the first ever entire nation to achieve UNESCO Biosphere status. Project partners pledge to take steps to protect natural resources, develop the economy in a sustainable way and promote outstanding living landscapes. UNESCO Biosphere Reserves are established to connect people and the economy with nature, wildlife, culture, heritage and communities. Biosphere Reserves have three functions: Conservation: to contribute to the conservation of landscapes, ecosystems, species and genetic variation. Development: to foster economic and human development which is socio -culturally and ecologically sustainable. Logistic support: to support demonstration projects, environmental education and training, research and monitoring related to local, regional, national and global issues of conservation and sustainable development. The Isle of Man Biosphere is zoned into six areas . Examples of all of these can be found in the Eastern area: Terrestrial Core areas, Marine Core areas, Terrestrial Buffer zone, Marine Buffer zone, Terrestrial Transition areas and Marine Transition areas. There is some overlap with The Isle of Man's First Biodiversity Strategy 2015-20
Development will not be permitted which would damage, disturb or detract from an important archaeological site or an Ancient Monument or the setting thereof.
Other Strategic Plan policies which are considered relevant
to these policies. The final sentence of Urban Environment Proposal 8, which states that there is no presumption against the development of archaeological sites, appears potentially to contradict Environment Policy 40 of the Strategic Plan, which indicates that development which would damage, disturb or detract from an archaeological site or its setting will not be permitted. I recommend that Urban Environment Proposal 8 be deleted from the draft Area Plan. Railway Architecture 53 Urban Environment Proposal 9 refers to the protection of station buildings, gate-keeper's huts and other line-side structures. However, it seems to me that if they are worthy of preservation, these buildings should be registered. While I do not doubt their cultural importance, in the absence of their registration, it is not clear to me how the planning authority could prevent their demolition or removal. I recommend that Urban Environment Proposal 9 be deleted from the draft Area Plan. CHAPTER 7 - TRANSPORT AND UTILITIES Highways Traffic Congestion 54 The Area Plan recognises that that there is already traffic congestion at the Quarterbridge junction; at the junction between Mountain Road and Governor's Road; and at the junction between Glencrutchery Road and Victoria Road. The evidence is that if all the development sites identified in the draft Area Plan were to be built-out, and no improvements were made to the road system, there would be a significant increase in congestion in Douglas and Onchan. Modelling commissioned by the Government suggests that, in the worst case, the average speed of traffic during the afternoon peak could decrease from 19mph to 12mph. Some journey times would be likely to increase by more than 100%, when compared with 2016 data. This would affect both private and public transport. However, it seems to me that, in practice, this worst case scenario is unlikely to arise. 55 Opportunities for additional carriageway provision are very limited and none are proposed in Douglas or Onchan in the Area Plan. However, there may be potential for limited highway improvements in the proposed Comprehensive Treatment Areas. Additionally, there is scope for the installation of an improved system of traffic signals, which could improve the capacity of the existing road network, particularly at junctions. Further mitigation could result from the introduction of the Active Travel Strategy, whereby drivers are to be encouraged to walk or cycle to their destinations, where this is practicable. Children living reasonably close to their school could be encouraged to walk there (perhaps in a supervised 'walking bus'); or go by bike. Reduced car use might also be achieved by a modal shift in favour of public transport; or car travellers could be encouraged to share a single vehicle, wherever possible. There may also be increasing scope for some office workers to undertake their duties at home, by making use of IT facilities. 56 Experience has shown that increasing peak period road congestion often results in 'peak spreading', where car users choose to begin their journeys a little earlier (or later) in order to avoid the worst delays. Congestion charging has also been shown to be an effective way of managing peak period delays. However, a degree of peak hour congestion is characteristic of most urban areas, and is perhaps an inevitable consequence of mass car commuting. Cycle Parking and Changing Facilities 57 The Braddan Parish Commissioners argued that the provision of cycle parking and changing facilities should be encouraged at places of employment. I agree. Chapter 11.5.3 of the Strategic Plan already states that 'consideration should be given to cycle parking for staff … in non-residential development'. However, I consider that such provision could appropriately be required as part of a development brief for any proposed employment site. I also consider that employers should be encouraged to introduce Travel Plans, with the aim of reducing the level of car commuting. I recommend that the provision of cycle parking and changing facilities, and the production of a Travel Plan, should be considered for any proposed employment development. Park and Ride 58 The Braddan Parish Commissioners, Miss P Newton and others urged that consideration be given to the introduction of a 'park and ride' scheme, whereby drivers entering Douglas would be encouraged to leave their vehicles at a peripheral car park and complete their journeys by bus. I understand that a previous 'park and ride' scheme had only limited success, and no firm proposal to try again has been put forward by any Government Department. I see no purpose in allocating land for a park and ride facility in the Area Plan, unless there is a good prospect of the requisite investment being made to bring such a scheme to fruition during the plan period. The TT Access Road 59 The TT Access Road provides the sole vehicular route to and from the interior of the TT course when racing is in progress. It is a single track carriageway with passing places, whic