Strategic Policy 4(a)
Source:
Policy text not yet available. This policy has been cited in 60 applications.
60
Citations
50.0%
Approval Rate
2024
Peak Year
Douglas
Top Parish
Installation of replacement front door (retrospective)
Alterations and erection of replacement rear extension and rear store and garden room, installation of rooflights, solar panels, air source heat pump, replacement of garage door with a window, creation of seating area, access ramp and bin store, and replacement of front windows and door.
Installation of two permanent illuminated wall mounted signs
Erection of a replacement detached dwelling and associated detached garage, greenhouse and workshop
Installation of twelve solar PV panels to south and east roof faces
Replacement of garage door, erection of raised decking to enclose garage and yard, erection of canopy over raised decking, removal of existing fire escape, replacement of first floor window with door to create external access
Re-roofing of existing conservatory with solid roof
Replace existing timber sliding sash windows with uPVC sliding sash windows and replace windows and door on the rear extension with a double door and a picture window
Installation of perimeter fall restraint to flat roof
Partial demolition of a building, erection of a single storey building extension, alterations to fenestration and render to remaining building including the provision of new drop-off layby with associated pavement and drainage works and use of the site for Class 4.3 (in association with 25/00567/CON)