Planning Officer · 2021–2025
Charlotte Crowe is a currently active planning officer who has handled 64 planning applications over a 5-year career (2021–2025). Their most active parishes are Douglas (15), Onchan (8), Malew (8). Of 64 decided applications, 60 (94%) were approved and 4 (6%) refused. They specialise primarily in other, alteration, new_build applications. Their busiest year was 2025 with 58 decisions. Their caseload increased significantly over their career.
62
Decisions
58
Approved
4
Refused
93.6%
Approval Rate
An application to make minor changes to an existing planning permission at Cronkbreck House, Greeba was refused in September 2025, as the proposed works were considered too substantial to be treated as minor amendments.
Detailed drainage information submitted to discharge a condition on an earlier planning permission at Peel Road, Douglas was approved by the Department of Environment, Food and Agriculture.
Minor changes to an approved scheme for 23 apartments at the former Bayqueen Hotel, Port St Mary were permitted on 2 September 2025.
Minor amendments to an approved scheme for extensions and alterations at a residential property in Port St. Mary were permitted on 20 August 2025.
An application to discharge a planning condition at the Bayqueen Hotel, Port St Mary, relating to birdshade protection on glass balustrades, was approved in August 2025.
Minor amendments to an approved scheme for seven detached dwellings in Castletown were permitted, covering garage door styles, bedroom window changes, and air source heat pump locations.
A Precautionary Working Method Statement for common lizards, required by condition on an earlier planning permission for a field near Ballasalla, was approved on 25 July 2025.
This application sought minor changes to an approved scheme at Bridge House, West Baldwin, including alterations to external finishes, removal of an external store, a replacement roof to the utility room, repositioned rooflights, a relocated front door, and removal of a utility room flue. The changes were permitted on 23 July 2025.
Details of a temporary access and landscaping plan, required by a condition on an earlier planning permission, were approved for a property at Shearwater, Andreas Road, Dhoor, Ramsey.
An application to discharge a planning condition relating to materials and finishes at Larchwood Lodge, Baldrine was approved on 4 July 2025.
This application submitted details of a headwall construction to satisfy a condition attached to a wider planning permission for a large residential-led development east of Braddan Road. The details were approved by delegated decision on 4 July 2025.
This application submitted details of an arboricultural method statement required by a condition attached to an earlier planning permission for All Saints Church, Douglas. The details were approved on 30 June 2025.
Details of external materials — including windows, doors, and walls — required by a planning condition at Ballamaddrell Cottage were submitted and approved on 30 June 2025.
Details for conservation-type roof-lights, required by a condition on an earlier planning permission at 48 Patrick Street, Peel, were approved on 30 June 2025.
Details of external materials, finishes, windows, and doors required by a planning condition were submitted and approved for a property at 6 Market Hill, Douglas.
A minor change to an approved scheme at 4 Fairway Drive, Port Erin was permitted, altering a front elevation window from curtain walling to a smaller opening with an apex head.
Demolition of existing and erection of replacement 12 bedroomed respite care facility, with the installation of temporary access road
An application to discharge two conditions from a previous planning permission at Rose Cottage, Kirk Michael — covering the residential curtilage and foul waste disposal — was approved on 27 June 2025.
Details of an external lighting plan and schedule, required by a condition on an earlier campsite permission, were approved for land at West Kimmeragh Road, Bride on 27 June 2025.
An application to discharge a planning condition at 6 and 8 Bridge Road, Douglas, by providing construction contract details was approved on 27 June 2025.
Details of boundary sub-division, submitted to discharge a condition on a previous planning permission at The Bungalow, Sulby, were approved in June 2025.
This application submitted details of an external lighting plan to satisfy a pre-commencement condition attached to an earlier approval for commercial units and additional parking at Balthane, Ballasalla. The details were approved on 19 June 2025.
This application discharged a planning condition requiring details of how works near the River Neb would protect the river's fish population, and was permitted on 19 June 2025.
Details of cycle storage and parking, required by conditions on an earlier planning permission for land at Vollan Field, Ramsey, were approved in June 2025.