5 March 2026 · Delegated
Manx Telecom/Crown Castle, Transmitter Site, Chibbyr Pheric Road, Rencell, Laxey, Isle Of Man, IM4 7hz
The application proposes the installation of 3 antennas onto an existing 45m lattice mast and 1 replacement equipment cabinet at an existing telecommunications site located at Ballacollister Farm, Laxey. The site is a small fenced parcel within an agricultural field used for grazing, containing three data buildings and the existing mast with various telecommunications equipment. The application was assessed against planning policies covering the principle of development, visual impact, residential amenity, and public health. The application was approved by delegated decision on 5 March 2026, subject to 5 conditions.
The application was approved because the proposal was considered acceptable in principle and justified under the relevant planning policies. The assessment found that the visual impact, residential amenity, and public health considerations were satisfactorily addressed.
Development should make the best use of resources
The proposed replacement antennas would conform with Strategic Policy 1c,4b
General Development Considerations
General Policy 3
General Policy 3: Development will not be permitted outside of those areas which are zoned for development on the appropriate Area Plan with the exception of: (a) essential housing for agricultural workers who have to live close to their place of work; (Housing Policies 7, 8, 9 and 10); (b) conversion of redundant rural buildings which are of architectural, historic, or social value and interest; (Housing Policy 11); (c) previously developed land (1) which contains a significant amount of building; where the continued use is redundant; where redevelopment would reduce the impact of the current situation on the landscape or the wider environment; and where the development proposed would result in improvements to the landscape or wider environment; (d) the replacement of existing rural dwellings; (Housing Policies 12, 13 and 14); (e) location-dependent development in connection with the working of minerals or the provision of necessary services; (f) building and engineering operations which are essential for the conduct of agriculture or forestry; (g) development recognised to be of overriding national need in land use planning terms and for which there is no reasonable and acceptable alternative; and (h) buildings or works required for interpretation of the countryside, its wildlife or heritage. 6.4 Planning Agreements 6.4.1 Where development is acceptable and in accordance with the provisions of this Plan and the relevant Area Plan, but raises issues which cannot be addressed by the imposition of planning conditions, the Department will seek to conclude an Agreement with the developer under Section 13 of the 1999 Town and Country Planning Act.
Protection of the countryside
Area Plan for the East sets out locally-applicable means for implementing the policies set out in the Isle of Man Strategic Plan 2016. In that Strategic Plan, we find the Environment Policies. Environment Policy 1 states: The countryside and its ecology will be protected for its own sake. For the purposes of this policy, the countryside comprises all land which is outside the settlements defined in Appendix 3 at A.3.6 or which is not designated for future development on an Area Plan. Development which would adversely affect the countryside will not be permitted unless there is an over- riding national need in land use planning terms which outweighs the requirement to protect these areas and for which there is no reasonable and acceptable alternative. Maintaining the purpose of this Area Plan as a means of implementation, there is some further direction to be found in the Strategic Plan, at paragraph 7.2.1: 'Whilst landscape and coastal change is inevitable, and in some cases desirable, the emphasis must be on the appropriateness of this change and the balance or equity between the needs of conservation and those of development. The primary goal must therefore be to respect, maintain and enhance the natural and cultural environment including nature conservation and landscape and coastal quality, and ensure its protection from inappropriate development.' Given the comprehensive nature of the Isle of Man Strategic Plan's Environmental Policies, only a small number of additional Proposals and Recommendations are necessary. In order to produce an implementable Area Plan for the East it is necessary to recognise those statutory desig nations and strategies which whilst having an Island-wide scope are highly relevant to the protection of environments within the Plan Area. An example is the UNESCO Biosphere status afforded to the Isle of Man. Island-level strategies identify crossborder issues and take account of the cumulative impacts of human engagement with nature. Area Plan Objectives i. To protect, conserve and enhance the natural and cultural environment of the plan area and promote biodiversity. ii. To improve the function, usability and provision of our green infrastructure and public spaces by providing a network of green spaces and features which are connected and where possible, accessible to the public. iii. To manage and improve flood risk and improve drainage conditions. iv. To support the working countryside and its custodians in maintaini ng a sustainable rural economy. Area Plan Desired Outcomes i. Where approved, d evelopment will be ecologically sustainable and designed to protect and where possible enhance biodiversity as well as mitigate and adapt to the effects of climate change. ii. The Green Infrastructure network will be established and fostered, connecting people with nature in a way that achieves the best shared outcomes for the urban and natural environment. iii. Statutory and non-statutory designations will continue to provide protection to the most important and most vulnerable cultural assets, habitats and environments in the plan area. iv. Beyond the towns and villages, the area as a whole will retain its landscape setting including its important visual interaction with the central uplands, central valley, coast and marine environment. Natural Environment Proposal 1 The Department supports the protection, creation and improvement of green infrastructure in the East, particularly in those locations which have the potential to be part of a Green Infrastructure Network. Applications for development must take into account any approved Government Green Infrastructure Strategies, but in any case, must identify how development proposals intend to contribute to the long term provision of a network of connected green spaces. UNESCO Biosphere In 2017, the Isle of Man became the first ever entire nation to achieve UNESCO Biosphere status. Project partners pledge to take steps to protect natural resources, develop the economy in a sustainable way and promote outstanding living landscapes. UNESCO Biosphere Reserves are established to connect people and the economy with nature, wildlife, culture, heritage and communities. Biosphere Reserves have three functions: Conservation: to contribute to the conservation of landscapes, ecosystems, species and genetic variation. Development: to foster economic and human development which is socio -culturally and ecologically sustainable. Logistic support: to support demonstration projects, environmental education and training, research and monitoring related to local, regional, national and global issues of conservation and sustainable development. The Isle of Man Biosphere is zoned into six areas . Examples of all of these can be found in the Eastern area: Terrestrial Core areas, Marine Core areas, Terrestrial Buffer zone, Marine Buffer zone, Terrestrial Transition areas and Marine Transition areas. There is some overlap with The Isle of Man's First Biodiversity Strategy 2015-20
Environmental Policy 22
Environment Policy 22: Development will not be permitted where it would unacceptably harm the environment and/or the amenity of nearby properties in terms of: i) pollution of sea, surface water or groundwater; ii) emissions of airborne pollutants; and iii) vibration, odour, noise or light pollution. 7.17.2 In addition to the above, changes in the activities associated with the current permitted use of land or a building, which in themselves do not constitute development and therefore do not require planning permission, can have an adverse impact on adjacent properties by virtue of noise, light or general disturbance. For example the addition of security lig hting on a property may cause light pollution affecting adjacent properties and the wider area. The introduction of new activities into established parks and recreation areas can have an impact on neighbours. In such cases the Department would advocate t he person or organisation considering the change to give careful consideration to the potential impact of such activity in terms of location, siting and design.
Need for communications infrastructure versus environmental impacts
Condition 1
The development hereby approved shall be begun before the expiration of four years from the date of this decision notice.
Condition 2
Unless otherwise approved in writing by the Department, any telecommunications cabinet, mounted equipment or telecommunications structure must be removed from the land on which it is situated, within 6 months of it no longer being required for telecommunications purposes, and such land must be restored to its condition before the development took place, so far as is practicable.
Condition 3
The proposed telecommunications equipment shall be coloured to match the tower / mast to which they are affixed and retained in perpetuity. REASON: To mitigate any visual impact.
Condition 4
No permission is hereby approved for any other antennas, telecommunication or radio equipment affixed to the mast, other than demostrated as part of this application. REASON: To control development on this site.
Condition 5
The existing telecommunication equipment as shown on the drawing referenced; Proposed Elevation (drg. no. UKIM004292-30-301-G0002 Rev A) shall be removed from the lattice tower within 2 months of the new telecommunication equipment being brought into use. Reason: To prevent the retention of redundant equipment which could be detrimental to the visual amenity of the area.