DAFF Inland Fisheries Response
Department of Agriculture, Fisheries and Forestry
Isle of Man Government Reillys Ellen Vannin
Rheynn Eirinys, Eeastaght as Keylljyn Chief Executive - Mr. Colin Kniveton
E J Callow The Planning Committee Department of Local Government and the Environment Murray House Mount Havelock Douglas IM1 2SF
14 October 2008
Dear Miss Callow
Inland Fisheries Rose House, 51 – 59 Circular Road Douglas, Isle of Man IM1 1AZ Tel no (01624) 686044 Fax no (01624 685851 Email: [email protected]
RECEIVED ON 15 OCT 2008 DEPT OF LOCAL GOVERNMENT AND THE ENVIRONMENT
Quoting Ref: IF/62
Planning List – 02nd October 2008
08/01778/B Alterations and extensions to dwelling, The Lodge Fairy Cottage Development must be a minimum distance of 8 metres from the watercourse in order to minimise the risk of damage or disturbance to the river banks and river bed. Measures must be in place during construction works to safeguard the watercourse from run-off and sedimentation.
08/01475/B Erection of dwelling in association with approved 02/00712/B, Plot 11 Poachers Pocket Development Bridge Road Ballasalla (Re advertised due to amended plans received) Development must be a minimum distance of 8 metres from the watercourse in order to minimise the risk of damage or disturbance to the river banks and river bed. Measures must be in place during construction works to safeguard the watercourse from run-off and sedimentation.
08/01797/B Erection of a replacement agricultural building and improvement of a hardstanding area, Ballaglass Corony There must be no development within 8 metres of the watercourse in order to minimise the risk of disturbance to the river where appropriate. Measures must be in place during construction works to safeguard the watercourse from run-off and sedimentation.
08/01796/B Erection of a greenhouse, Bluebell Cottage Patrick Road St Johns There must be no development within 8 metres of the watercourse in order to minimise the risk of disturbance to the river where appropriate. Measures must be in place during construction works to safeguard the watercourse from run-off and sedimentation.
For further advice and guidance, please contact the Inland Fisheries Section of DAFF.
Yours sincerely
Neil Milsom EO - Fisheries