7 October 2022 · Delegated
Hillcrest, Balnahowe, Santon, Isle Of Man, IM4 1hn
This application at Hillcrest, Balnahowe, Santon sought to remove three conditions attached to an earlier planning permission. Those conditions restricted the use and occupation of the dwelling to agricultural workers, commonly known as an agricultural tie. The application was refused on 7 October 2022. The decision-maker found that the applicant had not provided enough information to clearly demonstrate that there is no longer a long-term need for the property to be occupied by agricultural workers in the locality. Because that evidence was not provided, the case for lifting the agricultural tie did not meet the requirements set out in the Strategic Plan (2016). The decision was made by a Principal Planner under delegated authority.
The application was refused because the applicant did not provide sufficient evidence to show there is no longer a long-term need for the dwelling to be reserved for agricultural workers in the area. Without that evidence, the case for removing the agricultural occupancy tie could not be justified under the relevant housing policy.
Refusal Reasons
Restrictive conditions for agricultural dwellings
Housing Policy 8: Where permission is granted for an agricultural dwelling, a condition will be attached restricting the occupation to a person engaged or last engaged solely in agriculture; or a widow or widower of such a person, or any resident dependants. 8.9.4 Such a condition will not usually be removed on subsequent applications unless it is shown that the long -term need for dwellings for agricultural workers, both on the particular farm and in the locality, no longer warrants reserving the dwelling for that purpose. 8.9.5 If it is not possib le for the farm worker to live in the nearest village, the siting of the proposed dwelling should be selected having regard to the various landscape policies in Chapter 7. In particular, the dwelling should self-evidently form part of the farm group.
Efficient use of land and resources
Strategic Policy 1: Development should make the best use of resources by: (a) optimising the use of previously developed land, redundant buildings, unused and under -used land and buildings, and re - using scarce indigenous building materials; (b) ensuring efficient use of sites, taking into account the needs for access, landscaping, open space (1) and amenity standards; and (c) being located so as to utilise existing and planned infrastructure, facilities and services. 4.2.2 In pursuance of (c) abo ve, the Department will, when formulating its programme for the preparation of new Area Plans, have particular regard to: (a) the availability of mains drainage connected to IRIS or other mains systems; (b) securing the future viability of rural primary schools; (c) the public investment in the Island's highway, bus, railway and tramway networks; (d) the provision and availability of water; and (e) community facilities. 4.3 Environment 4.3.1
Priority for new development to identified towns and villages
Strategic Policy 2: New development will be located primarily within our existing towns and villages, or, where appropriate, in sustainable urban extensions(2) of these towns and villages. Development will be permitted in the countryside only in the exceptional circumstances identified in paragraph 6.3. (1) Open Space is defined in Appendix 1. (2) Sustainable Urban Extensions are defined in Appendix 1 4.3.2 Appendix 3 to the Plan identifies the towns and villages, and also explains why the Department has rejected the idea of a new settlement, which was mooted in the Consultation Draft published in May 2000. 4.3.3 Each of our towns and villages has an ind ividual character arising not only from its geographical position and existing fabric, but also from its historical, cultural, and social background. This character should be protected and enhanced. Accordingly:
Development only in countryside in accordance with General Policy 3
General Development Considerations
General Policy 2: Development which is in accordance with the land-use zoning and proposals in the appropriate Area Plan and with other policies of this Strategic Plan will normally be permitted, provided that the development: (a) is in accordance with the design brief in the Area Plan where there is such a brief; (b) respects the site and surroundings in terms of the siting, layout, scale, form, design and landscaping of buildings and the spaces around them; (c) does not affect adversely the character of the surrounding landscape or townscape; (d) does not adversely affect the protected wildlife or locally important habitats on the site or adjacent land, including water courses; (e) does not affect adversely public views of the sea; (f) incorporates where possible existing topography and landscape features, particularly trees and sod banks; (g) does not affect adversely the amenity of local residents or the character of the locality; (h) provides satisfactory amenity standards in itself, including where appropriate safe and convenient access for all highway users, together with adequate parking, servicing and manoeuvring space; (i) does not have an unacceptable effect on road safety or traffic flows on the local highways; (j) can be provided with all necessary services; (k) does not prejudice the use or development of adjoining land in accordance with the appropriate Area Plan; (l) is not on contaminated land or subject to unreasonable risk of erosion or flooding; (m) takes account of community and personal safety and security in the design of buildings and the spaces around them; and (n) is designed having due regard to best practice in reducing energy consumption. 6.3 Development outside of areas zoned for development
Exceptions to development in the countryside
General Policy 3: Development will not be permitted outside of those areas which are zoned for development on the appropriate Area Plan with the exception of: (a) essential housing for agricultural workers who have to live close to their place of work; (Housing Policies 7, 8, 9 and 10); (b) conversion of redundant rural buildings which are of architectural, historic, or social value and interest; (Housing Policy 11); (c) previously developed land (1) which contains a significant amount of building; where the continued use is redundant; where redevelopment would reduce the impact of the current situation on the landscape or the wider environment; and where the development proposed would result in improvements to the landscape or wider environment; (d) the replacement of existing rural dwellings; (Housing Policies 12, 13 and 14); (e) location-dependent development in connection with the working of minerals or the provision of necessary services; (f) building and engineering operations which are essential for the conduct of agriculture or forestry; (g) development recognised to be of overriding national need in land use planning terms and for which there is no reasonable and acceptable alternative; and (h) buildings or works required for interpretation of the countryside, its wildlife or heritage. 6.4 Planning Agreements 6.4.1 Where development is acceptable and in accordance with the provisions of this Plan and the relevant Area Plan, but raises issues which cannot be addressed by the imposition of planning conditions, the Department will seek to conclude an Agreement with the developer under Section 13 of the 1999 Town and Country Planning Act.
Protection of the countryside
Area Plan for the East sets out locally-applicable means for implementing the policies set out in the Isle of Man Strategic Plan 2016. In that Strategic Plan, we find the Environment Policies. Environment Policy 1 states: The countryside and its ecology will be protected for its own sake. For the purposes of this policy, the countryside comprises all land which is outside the settlements defined in Appendix 3 at A.3.6 or which is not designated for future development on an Area Plan. Development which would adversely affect the countryside will not be permitted unless there is an over- riding national need in land use planning terms which outweighs the requirement to protect these areas and for which there is no reasonable and acceptable alternative. Maintaining the purpose of this Area Plan as a means of implementation, there is some further direction to be found in the Strategic Plan, at paragraph 7.2.1: 'Whilst landscape and coastal change is inevitable, and in some cases desirable, the emphasis must be on the appropriateness of this change and the balance or equity between the needs of conservation and those of development. The primary goal must therefore be to respect, maintain and enhance the natural and cultural environment including nature conservation and landscape and coastal quality, and ensure its protection from inappropriate development.' Given the comprehensive nature of the Isle of Man Strategic Plan's Environmental Policies, only a small number of additional Proposals and Recommendations are necessary. In order to produce an implementable Area Plan for the East it is necessary to recognise those statutory desig nations and strategies which whilst having an Island-wide scope are highly relevant to the protection of environments within the Plan Area. An example is the UNESCO Biosphere status afforded to the Isle of Man. Island-level strategies identify crossborder issues and take account of the cumulative impacts of human engagement with nature. Area Plan Objectives i. To protect, conserve and enhance the natural and cultural environment of the plan area and promote biodiversity. ii. To improve the function, usability and provision of our green infrastructure and public spaces by providing a network of green spaces and features which are connected and where possible, accessible to the public. iii. To manage and improve flood risk and improve drainage conditions. iv. To support the working countryside and its custodians in maintaini ng a sustainable rural economy. Area Plan Desired Outcomes i. Where approved, d evelopment will be ecologically sustainable and designed to protect and where possible enhance biodiversity as well as mitigate and adapt to the effects of climate change. ii. The Green Infrastructure network will be established and fostered, connecting people with nature in a way that achieves the best shared outcomes for the urban and natural environment. iii. Statutory and non-statutory designations will continue to provide protection to the most important and most vulnerable cultural assets, habitats and environments in the plan area. iv. Beyond the towns and villages, the area as a whole will retain its landscape setting including its important visual interaction with the central uplands, central valley, coast and marine environment. Natural Environment Proposal 1 The Department supports the protection, creation and improvement of green infrastructure in the East, particularly in those locations which have the potential to be part of a Green Infrastructure Network. Applications for development must take into account any approved Government Green Infrastructure Strategies, but in any case, must identify how development proposals intend to contribute to the long term provision of a network of connected green spaces. UNESCO Biosphere In 2017, the Isle of Man became the first ever entire nation to achieve UNESCO Biosphere status. Project partners pledge to take steps to protect natural resources, develop the economy in a sustainable way and promote outstanding living landscapes. UNESCO Biosphere Reserves are established to connect people and the economy with nature, wildlife, culture, heritage and communities. Biosphere Reserves have three functions: Conservation: to contribute to the conservation of landscapes, ecosystems, species and genetic variation. Development: to foster economic and human development which is socio -culturally and ecologically sustainable. Logistic support: to support demonstration projects, environmental education and training, research and monitoring related to local, regional, national and global issues of conservation and sustainable development. The Isle of Man Biosphere is zoned into six areas . Examples of all of these can be found in the Eastern area: Terrestrial Core areas, Marine Core areas, Terrestrial Buffer zone, Marine Buffer zone, Terrestrial Transition areas and Marine Transition areas. There is some overlap with The Isle of Man's First Biodiversity Strategy 2015-20
Exceptions to allowing new housing in the countryside
Housing Policy 4: New housing will be located primarily within our existing towns and villages, or, where appropriate, in sustainable urban extensions (1) of these towns and villages where identified in adopted Area Plans: otherwise new housing will be permitted in the countryside only in the following exceptional circumstances: (a) essential housing for agricultural workers in accordance with Housing Policies 7, 8, 9 and 10; (b) conversion of redundant rural buildings in accordance with Housing Policy 11; and (c) the replacement of existing rural dwellings and abandoned dwellings in accordance with Housing Policies 12, 13 and 14. 8.5.6 The anticipated increase in the total number of dwellings on the Island over the Plan period is approximately 14%. By administering the programme of Area Plan preparation, the Department will ensure that there is sufficient land zoned for residential development to meet the overall housing requirement figure required by Housing Policy 1. The Department has resolved to prepare under the provisions of the Town and Country Planning Act 1999 four Area Plans which will concentrate upon larger areas of the Island. These will focus on the North, West, East and South of the Island and correspond with those areas discussed at paragraph 5.9 of the Spatial Strategy Chapter. 8.6 Affordable Housing 8.6.1 The Department is concerned about the increasing difficulties of securing the provision of affordable housing across the Island. The Department can, and does as a Housing Authority, intervene financially to provide financial support to local Authorities; financial support to prospective owner occupiers (through the House Purchase Assistance Scheme 2002) and by direct provision of new houses to rent. The provision of affordable housin g is a material consideration in the preparation of the development plan. In the current situation the Department considers that, to secure an adequate provision of affordable housing, it is appropriate to require that any area of land identified for hous ing purposes should include a contribution towards the provision of affordable housing. 8.6.2 There are currently around 1,584 (as at 31 st March 2007) households on the General Housing Waiting List. In addition, there are some 690 (as at 31 st March 2007) households registered with the Department under the House Purchase Assistance Scheme (HPAS). This indicates a total current need of some 2,274 households for affordable housing. (1) Sustainable Urban Extensions are defined in Appendix 1 8.6.3 In the current circumstances the Department considers that approximately 25 % of new housing provision should take the form of affordable housing. In assessing the appropriate percentage in each instance, the Department will have regard to the fact that the figure is a target over the Plan Period as a whole; to evidence of local housing need; to the nature of the land and viability of the scheme; and to the nature of existing adjacent housing. The 25% provision will be monitored and reviewed as part of any review of the Strategic Plan.
New agricultural dwellings
Housing Policy 7: New agricultural dwellings will only be permitted in exceptional circumstances where real agricultural need is demonstrated. 8.9.3 In judging whether the need is sufficient to over -ride other policies, particular regard will be had to:- (a) the previous or proposed severance of land and buildings; (b) the agricultural justification for sub-division of a farm; (c) the long -term viability of new or unproven agricultural enterprises such as small - holdings, market gardens, or horticulture; (d) the extent to which the applicant's employment in agriculture is only part-time; and (e) in the case of a retiring farmer, whether the proposal would result in vacation of an existing farm dwelling for agricultural use, and whether the applicant would continue to assist in the operation of the farm.