Planning Approval Notice 08/00773/B
Isle of Man Town and Country Planning Act 1999
The Town and Country Planning (Development Procedure) Order 2005
Mr H R \& Mrs E C Bethune<br>Ynnyd Y Ghiallyn<br>Ballaghennie Road<br>Bride<br>Isle Of Man<br>IM7 4BF
In pursuance of powers granted under the above Act and Order the Department of Local Government and the Environment does hereby APPROVE the following application made on behalf of:
Name: Mr H R \& Mrs E C Bethune Proposal: Erection of wind turbine at: Ynnyd Y Ghiallyn Ballaghennie Road Bride Isle Of Man IM7 4BF which was considered on 15th August 2008, subject to compliance with the conditions specified below.
Date of Issue: 21st August 2008
Murray House <br> Mount Havelock <br> Douglas
Secretary to the Planning Committee
Schedule Of Conditions:
- The development hereby permitted shall commence before the expiration of four years from the date of this notice.
- This approval relates to wind turbine the as proposed in the submitted documents and drawings $00773 / 1,00773 / 2$ and $00773 / 3$ received on 16th April and 30th July 2008.
- The proposed wind turbine is required to cease operation $1 / 2$ hour before sunset to $1 / 2$ hour after dawn from mid March to mid October.
- The wind turbine is to be finished with a drab olive green matt colour.
- In the event of the wind turbine erected under this approval becoming redundant it must be taken down along with all ancillary infrastructure and be removed from the site within 3 months of the cessation of use and the land restored back to its original use.
This decision was made by the Director of Planning and Building Control in accordance with the authority delegated to him under Article 3(13) of the Town and Country (Development Procedure) Order 2005.
Guidance Note
This permission refers only to that required under the Town and Country Planning (Development Procedure) Order 2005.
Any appeal against this decision must be in writing and must be received by this Department within 21 days of the date of this notice.
A form and guidance notes are available from either the Planning Office, Tel 685950, or to download from the Department's website www.gov.im/ dlge/planning/plan/applications/decision.xml
Please note that a copy of the Officer's report which led to the decision, together with correspondence relative to the application, is available for inspection at the Department.
The proposed development must not be commenced until either;
- The time for requesting an appeal has expired; or
- Any appeal has been determined;
Whichever is the later.