Planning Approval Decision Notice
Isle of Man Town and Country Planning Act 1999
The Town and Country Planning (Development Procedure) Order 2005
Mr Ray Corkhill Railway Inn Main Road Union Mills Braddan
In pursuance of powers granted under the above Act and Order the PLANNING COMMITTEE of the Department of Local Government and the Environment does hereby APPROVE the following application made on behalf of:
Name: Mr & Mrs D Kaniewski Proposal: Change of use from tourist accommodation to residential dwelling at: Barn Conversion Ballagyr Farm Ballagyr Lane Peel Isle of Man IM5 2AD
which was considered on 15th November 2007, subject to compliance with the conditions specified below.
Date of Issue: 20th November 2007
Murray House Mount Havelock Douglas
Deputy Secretary Planning Committee
Schedule Of Conditions:
- The use must be taken up within four years of the date of this notice in order for this approval to remain valid after that time.
- This permission relates to the change of use of the existing tourist accommodation to permanent residential accommodation, as shown in drawings 2399/1 and 2592/1B both received on 20th September, 2007.
- Notwithstanding condition 3 above, no approval is granted for the use of the entire field as defined as the site in the submitted drawings, for residential purposes. Prior to the occupation of the building as a permanent residence the applicant must have approved by
the planning authority the details of how the residential curtilage is to be defined: this should generally be no further south into the field than 20m from the Lane and no further along the frontage than is the existing hard surfaced area and the curtilage should be delineated by a Manx sod hedge in accordance with Planning Circular 1/92. This must form the subject of a new planning application as this application for change of use does not include any building or engineering operations.
- Notwithstanding the provisions of the Town and Country Planning (Permitted Development) Order 2005 (or any Order revoking or re-enacting that Order) no extensions, greenhouses, walls, gates, fences, garden sheds, summerhouses, flag poles, decking, garages, or tanks for the storage of oil for domestic heating shall be erected (other than those expressly authorised by this approval.)
NOTE For a change in the water supply to premises (domestic or commercial) the applicant should contact the Isle of Man Water Authority Byelaws Inspector (Michael Karran), telephone 695957.
NOTE The Chief Fire Officer recommends the installation of mains wired interconnected domestic smoke detection. handwritten note
This decision was made by the Planning Committee constituted in accordance with Article 3(1) of the Town and Country Planning (Development Procedure) Order 2005.
Guidance Note
This permission refers only to that required under the Town and Country Planning (Development Procedure) Order 2005.
Any appeal against this decision must be in writing and must be received by this Department within 21 days of the date of this notice.
A form and guidance notes are available from either the Planning Office, Tel 685950, or to download from the Department’s website www.gov.im/dlge/planning/plan/applications/decision.xml
Please note that a copy of the Officer’s report which led to the decision, together with correspondence relative to the application, is available for inspection at the Department.
The proposed development must not be commenced until either;
- The time for requesting an appeal has expired; or
- Any appeal has been determined;