Planning Approval Decision Notice
Isle of Man Town and Country Planning Act 1999
The Town and Country Planning (Development Procedure) Order 2005
Samson Designs Mr S T Samson The Workshop Park Road Port St Mary
In pursuance of powers granted under the above Act and Order the Department of Local Government and the Environment does hereby APPROVE the following application made on behalf of:
Name: TLC Business Solutions Proposal: Construction of a two storey steel framed training centre headquarters with parking at: Site adjacent to Mannin Media Group Media House Ballafletcher Road Cronkbourne Douglas Isle of Man
which was considered on 26th July 2007, subject to compliance with the conditions specified below.
Date of Issue: 30th July 2007
Murray House Mount Havelock Douglas
Deputy Secretary Planning Committee
Schedule Of Conditions:
- The development hereby permitted shall commence before the expiration of four years from the date of this notice.
- This approval relates to drawing numbers 0704/02A and 0704/03A submitted 4th May 2007.
- The building may be used for office/training purposes only.
NOTE For single connections to a water main (i.e. a single dwelling) the applicant should contact Isle of Man Water Authority Customer Services, telephone 695949.
NOTE The applicant is advised to consult with the Manx Electricity Authority to determine the clearance required from the overhead high tension line or the underground cable which crosses the site.
NOTE The applicant is advised to consult the Manx Electricity Authority with regard to the siting of an electricity substation to cater for the proposed development.
NOTE The applicant/developer is recommended to consider the provision of access which is suitable for wheelchair users.
NOTE PRIOR to the commencement of any works the applicant is advised to consult the Chief Fire Officer to ensure that adequate fire precautions are taken.
This decision was made by the Director of Planning and Building control in accordance with the authority delegated to him under Article 3(13) of the Town and Country (Development Procedure) Order 2005.
Guidance Note
This permission refers only to that required under the Town and Country Planning (Development Procedure) Order 2005.
Any appeal against this decision must be in writing and must be received by this Department within 21 days of the date of this notice.
A form and guidance notes are available from either the Planning Office, Tel 685950, or to download from the Department's website www.gov.im/dlge/planning/plan
Please note that a copy of the Officer's report which led to the decision, together with correspondence relative to the application, is available for inspection at the Department.
The proposed development must not be commenced until either;
- The time for requesting an appeal has expired; or
- Any appeal has been determined;
Whichever is the later.