Planning Approval Decision Notice
Isle of Man Town and Country Planning Act 1999
The Town and Country Planning (Development Procedure) Order 2005
Partington Nixon & Kinrade 7-9 Drinkwater Street Douglas IM1 1AT
In pursuance of powers granted under the above Act and Order the Department of Local Government and the Environment does hereby APPROVE the following application made on behalf of:
Name: Mr Steve King Proposal: Construction of a detached double garage with living accommodation over with additional use as tourist accommodation at: Ballakneen Main Road Santon Isle of Man IM4 1JB
which was considered on 26th June 2007, subject to compliance with the conditions specified below.
Date of Issue: 27th June 2007
Murray House Mount Havelock Douglas
Schedule Of Conditions:
- The development hereby permitted shall commence before the expiration of four years from the date of this notice.
- This permission relates to the erection of a garage with accommodation above. The accommodation may be used only as such ancillary to that available in the main dwelling, Ballakneen, as shown in plans reference 4088/1P and -2P and -3 all received on 25th April, 2007.
- There must be no discharge of surface water to the main foul sewer.
- The proposed development must be connected to the main foul sewer.
NOTE: A Drainage Connection Fee will be payable to the Drainage Authority on this development
NOTE: The Chief Fire Officer recommends the installation of mains wired interconnected domestic smoke detection.
NOTE: For a change in the water supply to premises (domestic or commercial) the applicant should contact the Isle of Man Water Authority Byelaws Inspector (Michael Karren), telephone 695957.
NOTE: Prior to the commencement of works on this proposal, the applicant will be required to divert the existing public sewer which crosses the site. The applicant should contact the Department of Transport in this respect.
This decision was made by the Director of Planning and Building control in accordance with the authority delegated to him under Article 3(13) of the Town and Country (Development Procedure) Order 2005.
Guidance Note
This permission refers only to that required under the Town and Country Planning (Development Procedure) Order 2005.
Any appeal against this decision must be in writing and must be received by this Department within 21 days of the date of this notice.
A form and guidance notes are available from either the Planning Office, Tel 685950, or to download from the Department’s website www.gov.im/dlge/planning/plan.
Please note that a copy of the Officer’s report which led to the decision, together with correspondence relative to the application, is available for inspection at the Department.
The proposed development must not be commenced until either;
- The time for requesting an appeal has expired; or
- Any appeal has been determined;
Whichever is the later.