Planning Approval Decision Notice
Isle of Man Town and Country Planning Act 1999
The Town and Country Planning (Development Procedure) Order 2005
Cornerstone Architects 79 Parliament Street Ramsey IM8 1AQ
In pursuance of powers granted under the above Act and Order the Department of Local Government and the Environment does hereby APPROVE the following application made on behalf of:
Name: Mr M Priest Proposal: Alterations and enlarged extension to form additional living accommodation at: Lilybank Kionslieu Hill Foxdale Isle of Man IM4 3HB
which was considered on 16th May 2007, subject to compliance with the conditions specified below.
Date of Issue: 18 May, 2007
Murray House Mount Havelock Douglas
Schedule Of Conditions:
- The development hereby permitted shall commence before the expiration of four years from the date of this notice.
- This approval relates to drawing numbers 01; 100 Rev C and 101 Rev C, submitted as part of this application and date stamped 5th March 2007.
- The external finishes of the extension must match those of the existing building in all respects.
- There must be no discharge of surface water (directly or indirectly) from this proposed development to any foul drainage system(s).
NOTE It is noted that surface water from the property is to be discharge via a soakaway. The use of soakaways are subject to Building Control approval and if this approval
is not granted, the Drainage Division would not give permission for the discharge of surface water into the existing foul system and an alternative means of disposal would have to be sought.
This decision was made by the Director of Planning and Building control in accordance with the authority delegated to him under Article 3(13) of the Town and Country (Development Procedure) Order 2005.
This permission refers only to that required under the Town and Country Planning (Development Procedure) Order 2005.
Any appeal against this decision must be in writing and must be received by this Department within 21 days of the date of this notice.
A form and guidance notes are available from either the Planning Office, Tel 685950, or to download from the Department’s website www.gov.im/dlge/planning/plan
Please note that a copy of the Officer’s report which led to the decision, together with correspondence relative to the application, is available for inspection at the Department.
The proposed development must not be commenced until either;
- The time for requesting an appeal has expired; or
- Any appeal has been determined;
Whichever is the later.
Applicant/Agent