In pursuance of powers granted under the above Act and Order the Department of Local Government and the Environment does hereby APPROVE the following application made on behalf of:
Name: A - Dore Proposal: Change of use from sales warehouse to workshop and showroom at: Unit 5 Spring Valley Industrial Estate Douglas Isle of Man IM2 2QR
which was considered on 13th June 2007, subject to compliance with the conditions specified below.
Date of Issue: 15 June, 2007 Murray House Mount Havelock Douglas Secretary Planning Committee (Signature: [Handwritten signature])
Schedule Of Conditions:
- The use must be taken up within four years of the date of this notice in order for this approval to remain valid after that time.
- This approval relates to the plans and information submitted as part of this application and date stamped 14th March 2007.
NOTE PRIOR to the commencement of any works the applicant is advised to consult the Chief Fire Officer to ensure that adequate fire precautions are taken.
NOTE For a change in the water supply to premises (domestic or commercial) the applicant should contact the Isle of Man Water Authority Byelaws Inspector (Michael Karren), telephone 695957.
NOTE The applicant/developer is recommended to consider the provision of access which is suitable for wheelchair users.
This decision was made by the Director of Planning and Building control in accordance with the authority delegated to him under Article 3(13) of the Town and Country (Development Procedure) Order 2005.
This permission refers only to that required under the Town and Country Planning (Development Procedure) Order 2005.
Any appeal against this decision must be in writing and must be received by this Department within 21 days of the date of this notice.
A form and guidance notes are available from either the Planning Office, Tel 685950, or to download from the Department’s website www.gov.im/dlge/planning/plan
Please note that a copy of the Officer’s report which led to the decision, together with correspondence relative to the application, is available for inspection at the Department.
The proposed development must not be commenced until either;
- The time for requesting an appeal has expired; or
- Any appeal has been determined;
Whichever is the later.