Name: Harbours Division (Capt Michael Brew) Proposal: Creation of a Cruise Ship tender pontoon berth at: Douglas Harbour Bounded By North Quay South Quay Battery Pier And Victoria Pier Douglas Isle Of Man
which was considered on 12 April 2007, subject to compliance with the conditions specified below.
Date of Issue: 18th April, 2007
Murray House Mount Havelock Douglas
Schedule Of Conditions:
- The development hereby permitted shall commence before the expiration of four years from the date of this notice.
- This permission relates to the creation of a cruise ship tender pontoon berth as shown in drawing numbers 102, 103 and 107 date stamped 7th February 2007, Statement of Case from Design Services Division of Department of Transport dated January 2007.
NOTE The applicant is advised to consult with the Fire Safety Department regarding access for fire appliances and general fire safety issues.
This decision was made by the Planning Committee constituted in accordance with Article 3(1) of the Town and Country Planning (Development Procedure) Order 2005.
This permission refers only to that required under the Town and Country Planning (Development Procedure) Order 2005.
Any appeal against this decision must be in writing and must be received by this Department within 21 days of the date of this notice.
A form and guidance notes are available from either the Planning Office, Tel 685950, or to down load from the Department’s website www.gov.im/dlge/planning/plan
You should note that a copy of the Officer’s report which led to the decision being made, along with any correspondence relative to the application, is available for inspection at the Department.
The proposed development must not be commenced until either;