Planning Approval Decision Notice
Isle of Man Town and Country Planning Act 1999
The Town and Country Planning (Development Procedure) Order 2005
Douglas Corporation IJG Clague MBE Borough Engineer & Surveyor Town Hall Ridgeway Street Douglas
In pursuance of powers granted under the above Act and Order the Department of Local Government and the Environment does hereby APPROVE the following application made on behalf of:
Name: Douglas Corporation Proposal: Reserved matters application for installation of street lighting within gardens, refurbishment of pathways, repair work and general soft landscaping at: Municipal Gardens Derby Square Douglas Isle of Man IM1 3LS
which was considered on 17th May 2007, subject to compliance with the conditions specified below.
Date of Issue: 18 May, 2007 Murray House Mount Havelock Douglas
Schedule Of Conditions:
- The development hereby permitted shall commence before the expiration of four years from the date of this notice.
- This permission relates to the installation of street lighting within gardens, refurbishment of pathways, repair work and general soft landscaping as shown in drawing numbers 01, 02 Rev C, 03 Rev B, 04, 05, photographs with pavement/seating details date stamped 18th October 2006.
This decision was made by the Director of Planning and Building control in accordance with the authority delegated to him under Article 3(13) of the Town and Country (Development Procedure) Order 2005.
This permission refers only to that required under the Town and Country Planning (Development Procedure) Order 2005.
Any appeal against this decision must be in writing and must be received by this Department within 21 days of the date of this notice.
A form and guidance notes are available from either the Planning Office, Tel 685950, or to download from the Department’s website www.gov.im/dlge/planning/plan
Please note that a copy of the Officer’s report which led to the decision, together with correspondence relative to the application, is available for inspection at the Department.
The proposed development must not be commenced until either;
- The time for requesting an appeal has expired; or
- Any appeal has been determined;
Whichever is the later.
Applicant/Agent