1 August 2006 · Delegated
Ballacunner, Smeale Road, Andreas, Isle Of Man, IM7 4ja
Permission was granted for the erection of a replacement dwelling and new septic tank at Ballacunner, Smeale Road, Andreas, Isle of Man. The officer's report noted that the proposed building sits well back from the public highway and is screened by substantial trees, meaning it would be largely obscured from view. These site characteristics supported a finding that the development would have limited visual impact on the surrounding area. The application was decided by the Director of Planning and Building Control under delegated authority, with six conditions attached to the permission.
The application was approved by the Director of Planning and Building Control under delegated authority. The officer recommended approval, and the decision notice confirms permission was granted. The proposed building's position well back from the road, screened by substantial trees, meant its visual impact was considered acceptable.
Planning Circular 3/91
The replacement building should be sited essentially on the same footprint as the existing, should be of the same general size and should be designed in accordance with Policies 2-7 of Planning Circular 3/91
Condition 1
The development hereby permitted shall commence before the expiration of four years from the date of this notice.
Condition 2
This permission relates to the erection of a replacement dwelling with septic tank as shown in drawing number 27.1.06, Site and Location plans and Planning Statement date stamped 12th June 2006.
Condition 3
The existing roof slates should be salvaged and, insofar as proves practical, re-used on the replacement building. The remaining parts of the roof(s) must be finished in dark natural slate.
Condition 4
Any landscaping including garden walls and footpaths indicated on the approved drawing shall be completed in all respects, with the exception of tree and shrub planting, within three months of the first occupation of the dwelling and the trees and shrubs shall be planted in the planting and seeding season following that first occupation. Any tree or shrub which within a period of five years from the completion of the development dies, is removed or becomes seriously damaged or diseased shall be replaced in the next planting season with another of similar size and species, unless the planning authority gives written consent to any variation.
Condition 5
No existing tree or shrub indicated on the approved plans shall be cut down, grubbed out, topped, lopped or uprooted without the written consent of the planning authority. Any such tree or shrub removed without such consent or which dies, becomes seriously damaged or diseased within a period of 5 years from the completion of the development shall be replaced in the next planting season with another of similar size and species, unless the planning authority gives written consent to any variation.
Condition 6
The front elevation of the main dwelling and the front porch must be clad in traditionally laid stone prior to completion. Note: Split stone on a backing render is not acceptable as an external finish