19 October 2022 · Delegated
Cregg Mill, Silverdale Road, Ballasalla, Isle Of Man, IM9 3ds
Permission was sought for a change of use of the lower ground floor to tourist accommodation at Cregg Mill on Silverdale Road, Ballasalla (Malew). The application was approved, with the Council determining to grant permission subject to conditions. The formal decision was made on 19 October 2022. The formal decision record lists 7 conditions.
The application was approved. The Council determined to approve the change of use of the lower ground floor to tourist accommodation, subject to conditions. The decision was made on 19 October 2022.
Conditions of Approval
The development hereby approved shall be begun before the expiration of four years from the date of this decision notice.
Conditions of Approval
Notwithstanding the submitted plans, the proposed flood wall shall be similar to the existing stone walls on the site in terms of its shape, colour, size and thickness.
Conditions of Approval
No works in connection with the development hereby approved shall commence until details of proposed construction materials showing, including the colour, texture, bond and pointing of any stonework and render and manufacturer's specification for the flood barrier system have been submitted to and approved in writing by the Department.
Conditions of Approval
The development hereby approved shall not be used or occupied other than for the purpose of short-let holiday accommodation and shall not be used as a separate dwelling. The accommodation hereby approved shall not be occupied by the same person(s) for a single period or cumulative periods exceeding 28 days in any calendar year.
Conditions of Approval
The development hereby approved shall be carried out in strict accordance with the submitted Flood mitigation scheme detailed in the Planning Statement, Correspondence in Cover Email dated 21 June 2022, Proposed Plans and Sections received 12 April 2022, and the Lakeside Flood Solutions Brochure, and shall be retained thereafter. The tourist accommodation shall not be brought into use until these mitigation measures have been fully implemented.
Conditions of Approval
The tourist accommodation hereby approved shall not be occupied or let between the months of October, November & December of any year.
Conditions of Approval
The development hereby approved shall be carried out only in accordance with the following drawings and documents: Drawings 01, 02, 03 received 24 June 2021 Drawings A01, A02 received 12 April 2022 Flood Barrier Systems brochure received 1 July 2022