Planning Approval Decision Notice
Isle of Man Town and Country Planning Act 1999
The Town and Country Planning (Development Procedure) Order 2005
Heritage Homes Ltd Park House Isle Of Man Business Park Cooil Road Isle Of Man Braddan
In pursuance of powers granted under the above Act and Order the Department of Local Government and the Environment does hereby APPROVE the following application made on behalf of:
Name: Heritage Homes Ltd Proposal: Provision of temporary drainage infrastructure to serve approved residential development (PA’s 04/02634 & 05/00811) at: Fields 320649 320653 324323 324324 And Main Road And Eyrton Lane And Former Railway Line Main Road Crosby Isle Of Man
which was considered on 8 June 2006, subject to compliance with the conditions specified below.
Date of Issue: 15 June, 2006 Murray House Mount Havelock Douglas
Schedule Of Conditions:
- The development hereby permitted shall commence before the expiration of four years from the date of this notice.
- This approval relates to drawing no. 207 rev. A date stamped the 12th January 2006 and drawing no.s 205 rev. D and 206 rev. D date stamped the 22nd March 2006.
- Within three months of the cessation of its use the drainage infrastructure that has been installed in accordance with this approval must be removed from the application site in its entirety and the site be made good.
NOTE The applicant/developer is advised that this approval does not confer approval of any required licence to discharge under the Water Pollution Act (1993).
NOTE The applicant/developer is advised to contact the Department of Transport Drainage Division prior to the commencement of development to discuss the implementation of the development. Such discussions are recommended to cover aspects such as the submission of full technical construction drawings and watercourse calculations, the method of crossing of the old railway line with the effluent pipe and installation details.
NOTE The applicant/developer is advised that the Department of Transport has stated that the treated effluent pipe from the development to the River Dhoo will remain private and will not become part of an adopted public drainage system once installed. The responsibility for future maintenance will fall to the applicant/developer/owner.
NOTE The applicant/developer is advised to contact the Manx Electricity Authority’s Operations and Maintenance Department prior to the commencement of development to discuss working practices around electricity lines and cables that are within the proximity of the application site.
This decision was made by the Director of Planning and Building control in accordance with the authority delegated to him under Article 3(13) of the Town and Country (Development Procedure) Order 2005
This permission refers only to that required under the Town and Country Planning (Development Procedure) Order 2005.
Any appeal against this decision must be in writing and must be received by this Department within 21 days of the date of this notice.
A form and guidance notes are available from either the Planning Office, Tel 685950, or to down load from the Department’s website www.gov.im/dlge/planning/plan
You should note that a copy of the Officer’s report which led to the decision being made, along with any correspondence relative to the application, is available for inspection at the Department.
The proposed development must not be commenced until either;
- The time for requesting an appeal has expired; or
- Any appeal has been determined;
Whichever is the later.