Officer's Report
The site is defined as the western-most part of the Inner Harbour in Douglas.
Proposed is the provision of a further 41 pontoon berths and associated works.
The pontoons would be of the same construction as Phase 1.
The principle issue is the design/materials of the entrance canopy, and the treatment of the ramps/plinth associated therewith.
See also Mr Sewell’s comments regarding parking.
The entrance canopy is of similar form and materials to that in Phase 1 i.e. basic, but such as to make little visual impact.
The plinth should be faced so as to fit in the North Quay scheme.
The correspondence in relation to parking is self explanatory. The Department of Transport has sufficient control over sufficient parking spaces which are close to the site.
Recommendation
Recommended Decision: Permitted
Date of Recommendation:
Conditions and Notes for Approval / Reasons and Notes for Refusal
C : Conditions for approval N : Notes attached to conditions R : Reasons for refusal
: Notes attached to refusals
C 1. The development hereby permitted shall commence before the expiration of four years from the date of this notice.
C 2. The sides and top surface of the plinth must be finished in materials to match those approved in response to condition (3) of the approval granted in response to PA02/1904: Reclamation of harbour area to form boat-park and slipway, Inner Harbour, Bridge Road, Douglas; the Department’s Conservation Officer should be consulted hereon, and the recommendations arising therefrom must form the subject of amended details which must be submitted to and approved by the Planning Committee prior to the commencement of any works.
C 3. Subject to condition (2) above, this approval relates to the submitted drawings which are date-stamped 26th August 2005.
Decision Made : ... Committee Meeting Date : ...
21 November 2005 05/01642/B Page 3 of 3
Planning Report and Recommendations
General Report Site Visited YES/NO
The site is defined as the western-most
part of the Inner Harbour in Douglas.
Proposed is the provision of a further 41
pouloon tenths and associated works.
The pouloons would be of the same
construction as Phase 1.
The principal issue is the design/materials
of the entrance canopy, and the treatment of the ramps/plinths associated therewith.
See also Mr. Sewell's comments regarding
Signed Date
Summary of objections/views LA - no objection
Recommendations Approve/Refuse
Signed Date
Planning Report and Recommendations
Signed Date 14/4/05
Summary of objections/views
General Report
Site Visited
YES/NO
6. The entrance canopy is of similar form and materials to that in Phase 1 i.e. basic, but such as to make little visual impact.
7. The plinth should be faced so as to fit in with the approved palette of materials for the N. Quay scheme.
8. The correspondence in relation to parking is self explanatory. The DOT has sufficient control over sufficient parking spaces which are close to the site.
Signed Date 14/11/05
Recommendations
Approve/Refuse