Continuation Sheet APPLICATION No. 03/1576Page of --- The proposed research plan for extension is considered to be an appropriate & standard for the field of medical care to the proposed research. --- File No. 30/1104 --- {{table:505153}} ## Application No: 03 11643 Page of ### Planning Report and Recommendations #### General Report Site Visited YES/NO The proposal is the alteration and extension of some formal outbuildings at "frostu" Fallauwelsha, France. If the proposals "culminate" the existing building with its existing openings, etc., it would be necessary to avoid architectural stress. There would be opportunities to do both that is to have a new interpretation of the building whilst maintaining some of the existing details. I would prefer to see these existing patterns of opening, reclaimed and re-used. In addition, the restensions have some very new roof pitches (as low as 17") in place. Natural waste roofs tend to be steeper (generally not lower than 25" on the island). The "walling" to the bottom of the vertical timber boarding levels is better. A length of 7.02 m is needed. The "walling" to the bottom of the vertical timber boarding levels is better. There is a length of 7.02 m. The boarding is itself in use. (Date 9.02.04) Summary of objections/views contact us to me. #### Recommendations Approved/Refused Recommended Re: The all without the need to a new application incorporating some of the items above. Signed: J. M. FARO Date: 9.02.04 {{table:505154}}
Copyright in submitted documents remains with their authors. Request removal
Source & Provenance
Official reference
03/01590/B
Source authority
Isle of Man Government Planning & Building Control