27 May 2021 · Committee
Cafe, Cosy Nook, Shore Road, Port Erin, Isle Of Man, IM9 6hh
Permission was granted for the erection of a marquee, decking, and steps at the Cosy Nook Café in Port Erin, along with the use of part of the adjacent beach for the sale and consumption of food and drink. The use was approved on a temporary seasonal basis, operating between 15 May and 15 October each year, up to and including 15 October 2023. The site covers part of the café, its forecourt, and a section of the beach alongside it. The café has recently been added to the Protected Buildings Register. The officer's report identified highway safety and flood risk as the main planning issues to be considered. The application was approved by committee with one condition attached.
The Department of Environment, Food and Agriculture approved the application. The key planning issues considered were the impact on highway safety and the impact on and from flooding. One condition was attached to the permission.
standards which should be applied to development
The proposal is considered to comply with General Policy 2
General Policy 2: Development which is in accordance with the land-use zoning and proposals in the appropriate Area Plan and with other policies of this Strategic Plan will normally be permitted, provided that the development: (a) is in accordance with the design brief in the Area Plan where there is such a brief; (b) respects the site and surroundings in terms of the siting, layout, scale, form, design and landscaping of buildings and the spaces around them; (c) does not affect adversely the character of the surrounding landscape or townscape; (d) does not adversely affect the protected wildlife or locally important habitats on the site or adjacent land, including water courses; (e) does not affect adversely public views of the sea; (f) incorporates where possible existing topography and landscape features, particularly trees and sod banks; (g) does not affect adversely the amenity of local residents or the character of the locality; (h) provides satisfactory amenity standards in itself, including where appropriate safe and convenient access for all highway users, together with adequate parking, servicing and manoeuvring space; (i) does not have an unacceptable effect on road safety or traffic flows on the local highways; (j) can be provided with all necessary services; (k) does not prejudice the use or development of adjoining land in accordance with the appropriate Area Plan; (l) is not on contaminated land or subject to unreasonable risk of erosion or flooding; (m) takes account of community and personal safety and security in the design of buildings and the spaces around them; and (n) is designed having due regard to best practice in reducing energy consumption. 6.3 Development outside of areas zoned for development
presumes against development in areas not designated for development
Area Plan for the East sets out locally-applicable means for implementing the policies set out in the Isle of Man Strategic Plan 2016. In that Strategic Plan, we find the Environment Policies. Environment Policy 1 states: The countryside and its ecology will be protected for its own sake. For the purposes of this policy, the countryside comprises all land which is outside the settlements defined in Appendix 3 at A.3.6 or which is not designated for future development on an Area Plan. Development which would adversely affect the countryside will not be permitted unless there is an over- riding national need in land use planning terms which outweighs the requirement to protect these areas and for which there is no reasonable and acceptable alternative. Maintaining the purpose of this Area Plan as a means of implementation, there is some further direction to be found in the Strategic Plan, at paragraph 7.2.1: 'Whilst landscape and coastal change is inevitable, and in some cases desirable, the emphasis must be on the appropriateness of this change and the balance or equity between the needs of conservation and those of development. The primary goal must therefore be to respect, maintain and enhance the natural and cultural environment including nature conservation and landscape and coastal quality, and ensure its protection from inappropriate development.' Given the comprehensive nature of the Isle of Man Strategic Plan's Environmental Policies, only a small number of additional Proposals and Recommendations are necessary. In order to produce an implementable Area Plan for the East it is necessary to recognise those statutory desig nations and strategies which whilst having an Island-wide scope are highly relevant to the protection of environments within the Plan Area. An example is the UNESCO Biosphere status afforded to the Isle of Man. Island-level strategies identify crossborder issues and take account of the cumulative impacts of human engagement with nature. Area Plan Objectives i. To protect, conserve and enhance the natural and cultural environment of the plan area and promote biodiversity. ii. To improve the function, usability and provision of our green infrastructure and public spaces by providing a network of green spaces and features which are connected and where possible, accessible to the public. iii. To manage and improve flood risk and improve drainage conditions. iv. To support the working countryside and its custodians in maintaini ng a sustainable rural economy. Area Plan Desired Outcomes i. Where approved, d evelopment will be ecologically sustainable and designed to protect and where possible enhance biodiversity as well as mitigate and adapt to the effects of climate change. ii. The Green Infrastructure network will be established and fostered, connecting people with nature in a way that achieves the best shared outcomes for the urban and natural environment. iii. Statutory and non-statutory designations will continue to provide protection to the most important and most vulnerable cultural assets, habitats and environments in the plan area. iv. Beyond the towns and villages, the area as a whole will retain its landscape setting including its important visual interaction with the central uplands, central valley, coast and marine environment. Natural Environment Proposal 1 The Department supports the protection, creation and improvement of green infrastructure in the East, particularly in those locations which have the potential to be part of a Green Infrastructure Network. Applications for development must take into account any approved Government Green Infrastructure Strategies, but in any case, must identify how development proposals intend to contribute to the long term provision of a network of connected green spaces. UNESCO Biosphere In 2017, the Isle of Man became the first ever entire nation to achieve UNESCO Biosphere status. Project partners pledge to take steps to protect natural resources, develop the economy in a sustainable way and promote outstanding living landscapes. UNESCO Biosphere Reserves are established to connect people and the economy with nature, wildlife, culture, heritage and communities. Biosphere Reserves have three functions: Conservation: to contribute to the conservation of landscapes, ecosystems, species and genetic variation. Development: to foster economic and human development which is socio -culturally and ecologically sustainable. Logistic support: to support demonstration projects, environmental education and training, research and monitoring related to local, regional, national and global issues of conservation and sustainable development. The Isle of Man Biosphere is zoned into six areas . Examples of all of these can be found in the Eastern area: Terrestrial Core areas, Marine Core areas, Terrestrial Buffer zone, Marine Buffer zone, Terrestrial Transition areas and Marine Transition areas. There is some overlap with The Isle of Man's First Biodiversity Strategy 2015-20
presume against development in areas that flood
irements of the relevant gas supply agency. Flood Risk 63 There was widespread concern about the adequacy of drainage and the risk of flooding, particularly in parts of Braddan, Onchan and Laxey. Environment Policy 10 of the Strategic Plan indicates that where development is proposed on any site where there is a potential risk of flooding, the prospective developer will be required to submit a flood risk assessment, together with details of proposed mitigation measures. This approach is reinforced in Utilities Proposal 6 of the draft Area Plan, which (among other things) requires the incorporation of Sustainable Drainage Systems (SuDS) into new developments, to attenuate the rate of surface water run-off. I consider these policies to be reasonable. Clearly, without adequate mitigation measures, new building should normally be resisted on land which is at serious risk of flooding, or where the proposed development would increase the flood risk elsewhere. 64 In my view, the format of Utilities Proposal 6 could be improved. First, as a Proposal of the Area Plan, I consider that it should be in a bold typeface, to differentiate it from the supporting text. (The same applies to a number of other policies e.g. Transport Policy 2, and Utilities Policies 2 and 5). Second, there appears to be an error of syntax at the start of the second sentence of Utilities Proposal 6, which should perhaps read 'Strategies to achieve this will include …'. Third, the third bullet point of this Proposal introduces SuDS. Subsequent bullet points describe features of SuDS, and are therefore subordinate to the third bullet point. For clarity, I consider that they should be indented. I recommend that the draft Area Plan be modified accordingly. Sewage Treatment 65 There was also some public concern about the adequacy of the sewerage system, both in terms of its capacity to accommodate the effluent from proposed residential development areas, and in terms of the current practice of discharging untreated sewage into the sea. Infrastructure Policy 1 of the Strategic Plan indicates that developments entailing the erection of multiple dwellings should take place only on sites that will ultimately be connected to the IRIS system, which takes sewage to a treatment works at Meary Veg. (IRIS is an acronym for Integration and Recycling of the Island's Sewage). However, as long ago as 2006/7, a review was undertaken to decide whether to continue with the IRIS strategy. This concluded that it would be beneficial to adopt a regional sewage treatment strategy (RSTS) for those settlements that were not already connected to the IRIS system, including Laxey, Baldrine and settlements in the Central Valley. To that extent, Infrastructure Policy 1 of the Strategic Plan is now out of date. 66 I understand that a planning application will soon be submitted for the development of a local sewage treatment facility for Laxey. Feasibility studies for the provision of a similar facility to serve Baldrine are ongoing. A replacement sewage works at Ballagarey, serving part of the Central Valley became operational in 2018. However, capacity limitations mean that planned development in Crosby is likely to have to rely on standalone sewage treatment for the time being, until the existing treatment works is replaced as anticipated in 2022. The Programme for Government (2016-2021) indicates an intention to complete the regional sewage treatment infrastructure within the lifetime of the present administration. 67 It seems to me that these considerations should be taken into account in the allocation and phasing of land for development. I will return to this matter when considering the draft Area Plan's proposals for housing. Electricity Renewable Energy 68 Peel Energy considered that the Area Plan should contain a detailed and specific chapter on renewable energy, providing measurable criteria against which applications for the development of renewable power generating facilities would be assessed. They cited the States of Jersey Island Plan 2011, which includes such material. And they pointed out that a Climate Change Emergency has recently been declared on the Isle of Man; that a Climate Change Bill is soon to be presented to Tynwald; and that there has been strong public support for the Government's Climate Change Mitigation Strategy. They argued that, in failing to provide detailed guidance on renewable power generation, the Area Plan was inconsistent with the Strategic Plan; and that since the Area Plan post-dated the Strategic Plan, its largely negative provisions would prevail. 69 Energy Policy 4 of the Strategic Plan applies to development proposals for renewable energy generated by wind, water, tidal or solar power. It indicates that any such proposals will be judged against that Plan's environmental objectives. Proposals for wind, water or tidal power would need to be supported by an Environmental Impact Assessment. The supporting text indicates that renewable energy schemes will be given similar scrutiny as is gi
presume against development in areas that flood
Environment Policy 11: Coastal development will only be permitted where it would not: i) increase or transfer the risk of flooding or coastal erosion through its impact on natural coastal processes; ii) prejudice the capacity of the coast to form a natural sea defence; and iii) increase the need for additional coast protection works except where necessary to protect existing investment or development.
presume against development in areas that flood
Environment Policy 13: Development which would result in an unacceptable risk from flooding, either on or off-site, will not be permitted. 7.13. Agriculture 7.13.1. Agriculture is an integral and vital part of the rural economy and rural society and to a great degree is responsible for the appearance and stewardship of the countryside. The Island's farms not only provide the community with a healthy proportion of meat and vegetable produce but also provide employment opportunities. It is important to sustain agric ultural industry by safeguarding its prime resources, by allowing appropriately designed and sited new buildings (where need is established) and by encouraging conservation -based land management regimes (including appropriate tree and shrub planting). Howe ver, this must not be at the expense of the appearance and character or openness of the landscape, or result in the loss of traditional hedgerows and field boundaries or the loss of limited areas of good quality agricultural land. A recent study on agricultural soils on the Isle of Man (1) revealed that the majority of the agricultural land on the Island (80.26%) fell within Class 3, based on the land use capability class system in England and Wales (classes range from Class 1 to 5, with Class 1 being the mo st versatile land). Class 3 land characteristics can be summarised as land with moderate limitations which restrict the choice of crops and/or demand careful management. Only 4.87% of agricultural land falls within Classes 1 and 2. According to the agricultural land use capability map (figure 4 of the study), all of the Class 1/2 land of which Class 1 is the dominant class can be found in the south of the Island to the east of Ballasalla. New Area Plans will include a general presumption against the rel ease of Class 1 and 2 agricultural land for development. The highest level of protection will apply to the highest graded quality of land with Classes 1 and 2 soils being afforded most protection from development and being taken out of agricultural use. Where there is a proposal to develop land which is categorised in the Agricultural Soils of the Isle of Man report as being mixed Classes 2 and 3, those wishing to develop the land should ascertain which parts of the site represent higher grade of soil wi th these parts being avoided for development purposes. 7.13.2 One of the prime considerations in the determination of development proposals in the countryside will continue to be the conservation and enhancement of the landscape. In terms of the di versification of farms and farm buildings, there may be some circumstances where this may be appropriate and it is acknowledged that small scale enterprises can promote healthy economic activity in rural areas whether this be for commercial, industrial, tourism, sport or recreation uses. There is, however, a general presumption against the introduction of new uses into the countryside (including industrial or office uses): (a) for which there is no local need; (b) which would materially effect the rural character of an area; (c) which would necessitate the creation of new buildings; and (d) which would be more appropriate in industrial zones, business parks or within urban centres. 7.13.3 In recent years there has been increasing demand for new development and buildings in the countryside, particularly for new modern agricultural buildings. Such buildings can have, and in a number of areas already have had an adverse effect on the character and appearance of the landscape, particularly when sited in exposed locations away from building groups and on elevated land. It is important that new development should be compatible with the character of the surrounding area, and the need for n ew buildings in the countryside will be balanced against the harm that development may have on the particular environment within which it is proposed. In terms of new agricultural dwellings, permission will not be granted unless real agricultural need is demonstrated and will in every case be assessed in terms of need, sensitive siting, design, and size, and be subject to an agricultural occupancy condition. (1) Agricultural Soils of the Isle of Man, Harris et al, (Centre for Manx Studies) 2001 7.13.4 It is recognised that there have been considerable changes in the economy in the last twenty years. The number of people in full time agricultural employment has reduced for a number of reasons including increased mechanisation, reductions in the number of farms; and increases in the size of farm holdings. In many cases smaller farms have been amalgamated into larger units to increase economic viability. This has often been accompanied by the sale of former farmhouses and cottages to those who do not earn their employment in agriculture. At the same time there has been an increase in part time involvement in farming either where the income from agriculture is supplemented by other employment or where the person's main employment is not in agriculture but they farm on a part time basis. In considering the applications for new houses in the coun tryside the Department will give careful consideration to agriculture justification based on full time employment in agriculture. See also Section 8.9 in Chapter 8 - Housing.
Planning Policy Statement
Planning Circular 1/98 # THE ALTERATION AND REPLACEMENT OF WINDOWS The Department of Infrastructure Planning And Building Control Division Murray House Mount Havelock Douglas Isle of Man IM1 2SF July 1998 # THE ALTERATION AND REPLACEMENT OF WINDOWS ## INTRODUCTION 1. This Planning Circular sets down the Department's policies in respect of the alteration or replacement of windows. These policies vary according to the age, merit and location of the building. For ease of use, the Circular divides buildings into several categories, and sets out the policies and reasoning for each category. ## NEED FOR PLANNING APPROVAL 2. This Circular should be read in conjunction with the recent Permitted Development Order (S.D. 664/97). The effect of the Order is that, with certain exceptions, the installation of a window in an existing aperture in a building erected after 1920 does not require planning approval. The exceptions are - a) Where the building is a registered building or in a conservation area, or in an area in respect of which the Planning Committee has passed a resolution to the effect that planning approval is required for such work; or b) Where the work would be in breach of a condition imposed on the grant of planning approval. ## GENERAL REASONING 3. The appearance of any building is strongly influenced by the detailing of its windows. The character and integrity of a building are usually best preserved by the retention and repair of the original windows, or, if this is not possible, the installation of replacements which respond suitably to the original design. In this context, "original" means those windows which were installed in the building at the time of its construction. If you are in doubt as to whether the existing windows are the originals, the staff in the Office of Planning may be able to give advice. ## BUILDING CATEGORIES 4. For the purposes of this Circular, buildings have been divided into the following categories:- a) Registered Buildings b) Buildings in Conservation Areas c) Buildings erected before 1921 and not falling within a) or b) which have largely retained their original character d) Other buildings erected before 1921 e) Buildings constructed after 1920 which do not fall into category a) or b) and which are not subject to previous planning conditions restricting the installation of replacement windows. Subsequent paragraphs of this Circular deal with each category in turn. ## Category a) REGISTERED BUILDINGS 5. Policy If the original windows are still in place they should preferably be repaired. If repair is impracticable, replacement windows MUST BE THE SAME as the originals in all respects, including the method of opening, materials and detailed design. This policy will be strictly applied other than where the particular circumstances are so exceptional as to justify a relaxation. Reasons for Policy: Registered Buildings are those buildings which are judged to be of special architectural or historic interest and which are already entered into the Protected Buildings register. Because of their special status, these buildings merit particular care and any work carried out by way of repair or alteration requires Registered Building Consent. Planning Approval and Registered Building Consent ARE ALWAYS required. Category b) BUILDINGS IN CONSERVATION AREAS 6. Policy If the original windows are in place they should preferably be repaired. If repair is impracticable, replacement windows which would be readily visible from a public thoroughfare MUST HAVE THE SAME method of opening as the originals. Whatever the material used in their construction, the windows MUST HAVE THE SAME pattern and section of glazing bars and the same frame sections as the original windows. Windows not readily visible from a public thoroughfare must have the same or similar pattern of glazing bars as the originals, but not necessarily the original method of opening, whatever the material used in the construction. Reasons for Policy: The Department has a duty to determine which parts of the Island are areas of special architectural or historic interest, the character of which it is desirable to preserve or enhance, and shall by order designate such areas as Conservation Areas. Planning Approval is required for all external works to properties in Conservation Areas to ensure that any proposals are in keeping with not only the individual building, but the special character and quality of the area as a whole. Planning Approval IS REQUIRED for alteration or replacement of window in the category of buildings. Category c) BUILDINGS ERECTED BEFORE 1921 AND NOT FALLING WITHIN CATEGORIES a) OR b) WHICH HAVE LARGELY RETAINED THEIR ORIGINAL CHARACTER 7. For ease of use, this category has been divided into two, based on the location of the building: i) Buildings in an Urban Setting Policy In the individual building, or group of buildings, whose principal elevations are readily visible from a public thoroughfare, if the original windows are in place, it may be possible to repair and renovate them. This can take place without permission, and will be encouraged by the Department. If repair is impracticable, or existing windows are not the originals, the preference will be for replacement windows in the said principal elevations to have the same method of opening as the originals. Whatever the materials used in their construction, the windows MUST HAVE the same or similar pattern and section of glazing bars and the same or similar frame sections as the original windows. Windows are not part of the principal elevations and which are not readily visible from a public thoroughfare should preferably have the same or similar pattern of glazing bars as the originals, but not necessarily the original method of opening, whatever the material used in their construction. Reasons for Policy: In many of our towns there are individual and groups of buildings which, although not worthy of Registration and not located in Conservation Areas, make a most important contribution to the local townscape; e.g. prominent corner sites or terraces. Where these buildings remain substantially unaltered, the aim is to encourage their enhancement in response to the original architectural concept. Planning Approval IS REQUIRED for alterations or replacement windows in this category of buildings. ii) Buildings in a rural setting Policy In an individual building, or group of buildings, whose principal elevations are readily visible from a public thoroughfare, if the original windows are in place, it may be possible to repair and renovate them. This can take place without permission, and will be encouraged by the Department. If repair is impracticable or the existing windows are not the originals, the preference will be for replacement windows on the said principal elevations, to have the same method of opening as the originals. Whatever the material used in their construction, the windows MUST HAVE the same or similar pattern and section of glazing bars and the same or similar frame sections as the original windows. Windows not part of the principal elevations and which are not readily visible from a public thoroughfare should preferable have the same or similar pattern of glazing bars as the originals, but not necessarily the original method of opening, whatever the material use in their construction. Reasons for Policy: The Island is fortunate in that it still retains a considerable number of unspoilt traditional vernacular buildings which epitomise the quality of the rural landscape. These buildings may not be worthy of Registration, and may not be located in Conservation Areas, but they do make a most important contribution to the traditional character of the rural landscape. Where these buildings remain substantially unaltered, the aim is to encourage their enhancement whilst preserving the original vernacular style. Planning Approval IS REQUIRED for alteration or replacement of windows in this category of buildings. Category d) OTHER BUILDINGS ERECTED BEFORE 1921 8. Policy Replacement windows should preferably be the same or as similar to the originals in the pattern of the glazing bars. However, provided that the glazing pattern is retained, a more relaxed approach will be taken to the replacement of windows in such properties. Reasons for Policy: Many buildings fall within this category and although there is little in the way of restriction, the aim is to encourage simulation of the original glazing pattern and this will apply particularly to buildings which are part of a larger group, such as a terrace, where replacement windows, if carefully designed, may serve to enhance the overall appearance of the group. Planning Approval IS REQUIRED for alteration or replacement of windows in this category of buildings. Category e) BUILDINGS CONSTRUCTED AFTER 1920 WHICH DO NOT FALL INTO CATEGORIES a) OR b) AND WHICH ARE NOT SUBJECT TO PREVIOUS PLANNING CONDITIONS RESTRICTING THE INSTALLATION OF REPLACEMENT WINDOWS. 9. The installation of replacement windows in these buildings does not require planning approval. The Department nevertheless recommends that the design of such windows should respect the architectural style of the building. ## FINANCIAL ASSISTANCE 10. Attention is drawn to the fact that the repair of existing windows or the installation of replacement windows may qualify for grant assistance under Financial Assistance Schemes which the Department operates. Further information regarding the availability of Grant Assistance is obtainable from the Finance Section of the Department. ## REVOCATION AND STATUS 11. Planning Circular 2/93 (Replacing External Doors and Windows) is herby withdrawn. 12. This Circular is issued by the Department in accordance with Article 11 (2)(a)(vi) of the Isle of Man Planning Scheme (Development Plan) Order 1982. 13. Further advice or information is available from: The Planning Office Department of Infrastructure 1st Floor Murray House Mount Havelock Douglas Isle of Man .
Condition 1
This approval relates to the erection and retention of the structures shown in the approved plans and the use of the beach area for the consumption and sale of food and drink (Class 1.3) all between 15th May and 15th October in any year and until and including 15th October, 2023 after which the beach area must return to be publicly accessible and all temporary structures removed from the site.