Planning Approval Decision Notice
Isle of Man Town and Country Planning Act 1999
The Town and Country Planning (Development Procedure) Order 2005
Mr Ashley Pettit<br>Ashley Pettit Architects<br>James Place<br>Victoria Road<br>Douglas<br>IM2 4HD
In pursuance of powers granted under the above Act and Order the PLANNING COMMITTEE of the Department of Infrastructure does hereby APPROVE the following application made on behalf of:
Name: Proposal: at:
Mr Len Chatel Erection of two dwellings with integral garages and associated visitor parking (Re advertised due to amended plans received) Land in front of Bay View Hotel between Shore Road Underway and High Street Port St. Mary Isle of Man which was considered on 21st May 2010, subject to compliance with the conditions specified below.
Date of Issue: 27th May 2010 Murray House Mount Havelock Douglas
Schedule Of Conditions:
- The development hereby permitted shall commence before the expiration of four years from the date of this notice.
- This permission relates to the erection of two dwellings as shown and described in drawings P01, P06, P09 and the Structural Engineer's report all received on 4th August, 2009 and P02A, P03A, P07A, P08A and P10 received on 2nd December, 2009 and 05B received on 14th May, 2010.
NOTE The applicant should note that the building lies within a flood risk area in relation to tidal flooding and appropriate precautions should be taken to prevent or minimise damage to the property and its occupants and contents in this respect.
This decision was made by the Planning Committee constituted in accordance with Article 3(1) of the Town and Country Planning (Development Procedure) Order 2005.
Guidance Note
This permission refers only to that required under the Town and Country Planning (Development Procedure) Order 2005.
Any appeal against this decision must be in writing and must be received by this Department within 21 days of the date of this notice.
A form and guidance notes are available from either the Planning Office, Tel 685950, or to download from the Department's website www.gov.im/ dlge/planning/plan/applications/decision.xml
Please note that a copy of the Officer's report which led to the decision, together with correspondence relative to the application, is available for inspection at the Department.
The proposed development must not be commenced until either;
- The time for requesting an appeal has expired; or
- Any appeal has been determined;
Whichever is the later.