Decision Notice 15 April 2010
The Town and Country Planning (Development Procedure) Order 2005
Mr & Mrs Duncan 4 Links Close Port Erin Isle Of Man IM9 6LT
In pursuance of powers granted under the above Act and Order the Department of Infrastructure does hereby APPROVE the following application made on behalf of:
Name: Heritage Homes Ltd Proposal: Residential development of 16 apartments with associated parking and landscaping at: Land Rear To Princess Towers And Port Erin Royal Hotel Maine Road Port Erin Isle Of Man
which was considered on 13th April 2010, subject to compliance with the conditions specified below.
Date of Issue: 15th April 2010
Jerome Gill
Mrs E J Callow Secretary to the Planning Committee
Murray House Mount Havelock Douglas
Schedule Of Conditions:
- The development hereby permitted shall commence before the expiration of four years from the date of this notice.
- This permission relates to the development of an apartment building with associated landscaping, access and parking as shown and described in the Transport Statement, Design Concept, Energy Impact Assessment and Planning Statement all received on 25th June, 2009 and drawings drw-a-02A, -03A, -04A, -05A, -06A, 07A and 08A all received on 31st July, 2009.
09/01084/B
- The proposed apartments may not be occupied until such times as the parking shown in the approved plans are set out and available for use and thereafter retained for use by the occupants of the apartments on the site.
- All planting, seeding or turfing comprised in the approved details of landscaping must be carried out in the first planting and seeding seasons following the completion of the development or the occupation of the dwellings, whichever is the sooner. Any trees or plants which within a period of five years from the completion of the development die, are removed, or become seriously damaged or diseased must be replaced in the next planting season with others of a similar size and species.
This decision was made by the Director of Planning and Building Control in accordance with the authority delegated to him under Article 3(13) of the Town and Country (Development Procedure) Order 2005.
Guidance Note This permission refers only to that required under the Town and Country Planning (Development Procedure) Order 2005. Any appeal against this decision must be in writing and must be received by this Department within 21 days of the date of this notice.
A form and guidance notes are available from either the Planning Office, Tel 685950, or to download from the Department's website www.gov.im/dlge/planning/plan/applications/decision.xml.
Please note that a copy of the Officer's report which led to the decision, together with correspondence relative to the application, is available for inspection at the Department.
The proposed development must not be commenced until either:
- The time for requesting an appeal has expired; or
- Any appeal has been determined;
Whichever is the later.
09/01084/B