3 September 2009 · Delegated
High Bank, Knock Froy Road, Santon, Isle Of Man, IM4 1jd
This reserved matters application sought approval for the detailed design of a replacement dwelling with integral garaging at High Bank, Knock Froy Road, Santon. The application followed an earlier grant of planning permission in principle and dealt with the specifics of the design, scale, and appearance of the new house. The scheme was amended during the assessment process, with revised drawings submitted in June 2009. The total external floor area was remeasured at 494 sq m, covering all habitable attic and basement space, which the officer noted is larger than a modest traditional farmhouse. The existing building, High Bank, was shown as being demolished as part of the replacement. The officer considered the dwelling's impact on the wider landscape and the need for a traditionally designed building within the permitted size.
The reserved matters application was approved by the Senior Planning Officer under delegated authority on 3 September 2009. The scheme had been amended during the process, with revised drawings submitted in June 2009. Key considerations included the dwelling's impact on the wider landscape and the requirement for a traditionally designed replacement, noting that the total floor area of 494 sq m is larger than a modest traditional farmhouse. The formal decision record lists 4 conditions.
Town and Country Planning (Development Procedure) Order 2005
paragraph 6 (5) (c) and (d)
Town and Country Planning (Permitted Development) Order 2005
Government Circular No 09/09 Delegation of functions
I confirm that this decision accords with Government Circular No 09/09
Delegation of Functions (Development Procedure)
GC No 11/09 (Advertisements)
GC No 12/09 (Registered Buildings)
Condition 1
The development hereby permitted shall commence before the expiration of four years from the date of this notice.
Condition 3
Within one week of the first occupation of the new dwelling hereby approved the existing property of High Bank shall be vacated of all persons, stores and domestic furniture and equipment and within three months of the first occupation of the replacement dwelling, High Bank shall be demolished, all materials removed from the site and the site restored to use as an agricultural field.
Condition 4
Prior to the commencement of works on site, visibility splays of 2 m by 18 m must be accessible to drivers of vehicles emerging from the site onto the access lane and from the lane onto the roadway leading to the A5 Castletown Road. The visibility splays should be maintained thereafter.
Condition 5
All planting, seeding or turfing comprised in the approved details of landscaping must be carried out in the first planting and seeding seasons following the completion of the development or the occupation of the dwellings, whichever is the sooner. Any trees or plants which within a period of five years from the completion of the development die, are removed, or become seriously damaged or diseased must be replaced in the next planting season with others of a similar size and species.