11 March 2024 · Delegated
Conrhenny Plantation, Creg-Ny-Baa Back Road, Creg Ny Baa, Onchan, Isle Of Man, IM4 6as
The site is in Conrhenny Plantation south of Creg ny Baa Back Road, linking Laxey and Onchan. It includes an existing car park for 24 spaces and an adjacent open area with a picnic table, shrubs, and mounding. Key issues considered were the effect on the area's character and appearance, and highway safety. The Council of Ministers approved the application on 29th February 2024 subject to 9 conditions.
The Council of Ministers determined to approve the car park extension and temporary food vending facility. Approval was subject to conditions addressing planning concerns. No refusal reasons were given.
General Policy 3
Development will not be permitted outside of those areas which are zoned for development on the appropriate Area Plan with the exception of (in part): "(f) building and engineering operations which are essential for the conduct of agriculture or forestry; (h) buildings or works required for interpretation of the countryside, its wildlife or heritage."
General Policy 3: Development will not be permitted outside of those areas which are zoned for development on the appropriate Area Plan with the exception of: (a) essential housing for agricultural workers who have to live close to their place of work; (Housing Policies 7, 8, 9 and 10); (b) conversion of redundant rural buildings which are of architectural, historic, or social value and interest; (Housing Policy 11); (c) previously developed land (1) which contains a significant amount of building; where the continued use is redundant; where redevelopment would reduce the impact of the current situation on the landscape or the wider environment; and where the development proposed would result in improvements to the landscape or wider environment; (d) the replacement of existing rural dwellings; (Housing Policies 12, 13 and 14); (e) location-dependent development in connection with the working of minerals or the provision of necessary services; (f) building and engineering operations which are essential for the conduct of agriculture or forestry; (g) development recognised to be of overriding national need in land use planning terms and for which there is no reasonable and acceptable alternative; and (h) buildings or works required for interpretation of the countryside, its wildlife or heritage. 6.4 Planning Agreements 6.4.1 Where development is acceptable and in accordance with the provisions of this Plan and the relevant Area Plan, but raises issues which cannot be addressed by the imposition of planning conditions, the Department will seek to conclude an Agreement with the developer under Section 13 of the 1999 Town and Country Planning Act.
Environment Policy 1
The countryside and its ecology will be protected for its own sake. For the purposes of this policy, the countryside comprises all land which is outside the settlements defined in Appendix 3 at A.3.6 or which is not designated for future development on an Area Plan. Development which would adversely affect the countryside will not be permitted unless there is an overriding national need in land use planning terms which outweighs the requirement to protect these areas and for which there is no reasonable and acceptable alternative.
Area Plan for the East sets out locally-applicable means for implementing the policies set out in the Isle of Man Strategic Plan 2016. In that Strategic Plan, we find the Environment Policies. Environment Policy 1 states: The countryside and its ecology will be protected for its own sake. For the purposes of this policy, the countryside comprises all land which is outside the settlements defined in Appendix 3 at A.3.6 or which is not designated for future development on an Area Plan. Development which would adversely affect the countryside will not be permitted unless there is an over- riding national need in land use planning terms which outweighs the requirement to protect these areas and for which there is no reasonable and acceptable alternative. Maintaining the purpose of this Area Plan as a means of implementation, there is some further direction to be found in the Strategic Plan, at paragraph 7.2.1: 'Whilst landscape and coastal change is inevitable, and in some cases desirable, the emphasis must be on the appropriateness of this change and the balance or equity between the needs of conservation and those of development. The primary goal must therefore be to respect, maintain and enhance the natural and cultural environment including nature conservation and landscape and coastal quality, and ensure its protection from inappropriate development.' Given the comprehensive nature of the Isle of Man Strategic Plan's Environmental Policies, only a small number of additional Proposals and Recommendations are necessary. In order to produce an implementable Area Plan for the East it is necessary to recognise those statutory desig nations and strategies which whilst having an Island-wide scope are highly relevant to the protection of environments within the Plan Area. An example is the UNESCO Biosphere status afforded to the Isle of Man. Island-level strategies identify crossborder issues and take account of the cumulative impacts of human engagement with nature. Area Plan Objectives i. To protect, conserve and enhance the natural and cultural environment of the plan area and promote biodiversity. ii. To improve the function, usability and provision of our green infrastructure and public spaces by providing a network of green spaces and features which are connected and where possible, accessible to the public. iii. To manage and improve flood risk and improve drainage conditions. iv. To support the working countryside and its custodians in maintaini ng a sustainable rural economy. Area Plan Desired Outcomes i. Where approved, d evelopment will be ecologically sustainable and designed to protect and where possible enhance biodiversity as well as mitigate and adapt to the effects of climate change. ii. The Green Infrastructure network will be established and fostered, connecting people with nature in a way that achieves the best shared outcomes for the urban and natural environment. iii. Statutory and non-statutory designations will continue to provide protection to the most important and most vulnerable cultural assets, habitats and environments in the plan area. iv. Beyond the towns and villages, the area as a whole will retain its landscape setting including its important visual interaction with the central uplands, central valley, coast and marine environment. Natural Environment Proposal 1 The Department supports the protection, creation and improvement of green infrastructure in the East, particularly in those locations which have the potential to be part of a Green Infrastructure Network. Applications for development must take into account any approved Government Green Infrastructure Strategies, but in any case, must identify how development proposals intend to contribute to the long term provision of a network of connected green spaces. UNESCO Biosphere In 2017, the Isle of Man became the first ever entire nation to achieve UNESCO Biosphere status. Project partners pledge to take steps to protect natural resources, develop the economy in a sustainable way and promote outstanding living landscapes. UNESCO Biosphere Reserves are established to connect people and the economy with nature, wildlife, culture, heritage and communities. Biosphere Reserves have three functions: Conservation: to contribute to the conservation of landscapes, ecosystems, species and genetic variation. Development: to foster economic and human development which is socio -culturally and ecologically sustainable. Logistic support: to support demonstration projects, environmental education and training, research and monitoring related to local, regional, national and global issues of conservation and sustainable development. The Isle of Man Biosphere is zoned into six areas . Examples of all of these can be found in the Eastern area: Terrestrial Core areas, Marine Core areas, Terrestrial Buffer zone, Marine Buffer zone, Terrestrial Transition areas and Marine Transition areas. There is some overlap with The Isle of Man's First Biodiversity Strategy 2015-20
Environmental Policy 4
development will not be permitted which would adversely affect species or habitats of international, national or local importance
Environmental Policy 22
Business Policy 1
The growth of employment opportunities throughout the Island will be encouraged provided that development proposals accord with the policies of this Plan.
Business Policy 1: The growth of employment opportunities throughout the Island will be encouraged provided that development proposals accord with the policies of this Plan. 9.1.3 This chapter concent rates on the land use implications of business activity, including industry, storage and distribution, office and commercial development, retailing and tourism. 9.1.4 In respect of employment land availability, the Department has undertaken and published an Employment Land Availability Study (1). A summary of this is included in Appendix 9. Across the Island there are some 118 hectares of land allocated for industrial development. Much of this is concentrated around Ballasalla and the Airport. There is, however, a spread of land available across the Island to support employment and regeneration opportunities in each area. Such land will be important to support the regeneration of the Service Centres and the Gateway and Employment role of the Airport area. 9.1.5 The Douglas area has seen by far the bulk of the industrial land take up in recent decades and much of the land allocated for such purposes has been taken up. This is why the Department has resolved to proceed with a Development Order for the development of some 20 hectares of employment land to the south of Cooil Road. A recent report on the take up of industrial land in the Douglas area indicates that it has been faster than anticipated and at current rates that all the land will be required by 2015. While the situation will be subject to detailed assessment in the preparation of the Plan for the East, the Department is satisfied that the release of additional land is both necessary and appropriate at this stage. 9.1.6 The Department has also reviewed planning permissions for office development. The majority of these are focused in the Douglas area. Take up has been low in recent years with the exception of certain relocations to corporate headquarters, such as Skandia. There are a number o f sites still available for new office development, in addition to the existing stock. Of note is the recent trend for sites with office consents to subsequently secure planning permission for residential use. The most notable example being the final pha se of the Villiers development, which now has a residential permission in addition to its partly - implemented office consent. 9.1.7 The following information has been extracted from the Review of Economic Strategy (Treasury 2003) which formed part of the background to the Economic Strategy 2004 approved by Tynwald in October that year. (1) Employment Land Availability Study DLGE 2007 9.1.8 The Isle of Man has enjoyed unprecedented economic success in the last ten years. Over this period annual gross domestic product, or GDP (the value of the economy' s output of all goods and services), has more than doubled in real terms (both absolute and per capita) such that from a deficit of around one quarter, per capita GDP in the Isle of Man now exceeds that of the UK by 7% and the average for the European Union (EU 15) by 10%. 9.1.9 The period 1993 - 2000 saw the economy not only expanding but doing so at an accelerating rate, before slowing in 2000/01. Since 2001 the economy has continued to grow at around 5% per annum (the latest national income accounts revealed growth of 5.9% in 2002/03), meaning that, after the recession in the early 1980's the Isle of Man economy has recorded economic growth in each of the last twenty years. 9.1.10 This economic performance has been led by the financial and related se rvices sectors. The finance industry grew by over 80% between 1996 and 2001 alone. But the table below illustrates that probably all areas of Manx economy are today generating more income in real terms than a decade ago, even it the relative importance o f some, most noticeably manufacturing, has declined. Table One - Sectoral Contributions to National Income 1992/93 v 2000/01 (at 2000/01 prices) Contributions to National Income (£) Real Increase in income generated (%) 1992/93 % 2000/01 % Manufacturing 72.0 11 76.7 6 6.5 Finance 229.7 35 505.4 41 120.0 Tourism 41.0 6 67.7 6 65.1 Agriculture/Fishing 11.7 2 15.8 1 35.0 Construction 46.7 7 89.6 7 91.9 Professional Services 96.7 15 186.1 15 92.4 Utilities, Distribution and Miscellaneous Services 133.1 20 223.8 18 68.1 Pubic Administration 34.6 5 53.6 4 54.9 Total 665.5 100 1,218.7 100 83.1 9.1.11 National income data aside, the clearest indication of the economic success enjoyed by the Island in recent times comes from the labour market. Census results show that the workforce increased from 33,189 in 1991 to 39,685 by 2001, an increase almost identical to that in the total resident population over the period. But the number seeking emp loyment but who were unemployed at the time halved from 1,360 to 635. 9.1.12 Changes in the underlying structure of the economy reflected in the national income accounts are further depicted in the Census statistics below showing the distribution of labour between the different sectors of the economy. Table Two - Employment by Sector 1991 v 1996 1991 1996 2001 No. % No. % No. % Agriculture and Fishing 1,240 3.9 938 2.8 543 1.4 Manufacturing 3,348 10.5 3,562 10.6 3,185 8.2 Construction 3,404 10.7 3,372 10.0 2,512 6.4 Utilities1 513 1.6 462 1.4 515 1.3 Transport and Communications 2,437 7.7 2,688 8.0 2,970 7.6 Wholesaling and Retailing 3,844 12.1 3,692 11.0 4,372 11.2 Finance 4,353 13.7 5,942 17.7 8,959 22.9 ICT2 n.a n.a n.a n.a 361 0.9 Professional Services 5,438 17.1 6,081 18.1 7,296 18.7 Tourist Accommodation 856 2.7 765 2.3 743 1.9 Entertainment and Catering 1,403 4.4 1,156 3.4 2,116 5.4 Miscellaneous Services 2,849 9.0 2,768 8.2 2,373 6.1 Public Administration 2,144 6.7 2,146 6.4 3,105 8.0 Total 31,829 100.0 33,5773 100.0 39,050 100.0 Notes: 1 Electricity, gas and water 2 Not separated out from other sectors until 2001 3 Includes 5 where occupation not recorded 9.2 Industry and Storage and Distribution 9.2.1 The nature of industrial activity on the Island changed very considerably during the last century. The previously dominant primary industries of fishing and agriculture now contribute only 1% to the Gross Domestic Product (GDP) and provide only 1.4% of our total employment, whereas manufacturing contributes 6% to the GDP and provides 8.2% of our employment, and the construction industry contributes 6% to the GDP and provides 6.4% of our employment. Storage and distribution has also become a more important activity, particularly in terms of the demands it makes on land, buildings, and access requirements. 9.2.2 Most of the Island's industry is located close to major transportation links, particularly in the case of Douglas, Braddan and Ballasalla, which all have convenient access to Ronaldsway airport and Douglas harbour. Ramsey and Peel harbours are used for the importation and exportation of large scale good s (fuel, building supplies etc). All of these are conveniently accessible to significant pools of labour. In order to minimise excessive transportation of goods and travel for employees, and to promote sustainable development, much of the Island's future industrial development should continue to be concentrated in these locations, and appropriate areas of land should be made available for such uses in the Area Plans for these parts of the Island. It will also be appropriate, when formulating Area Plans for our smaller settlements, to make provision for the continued operation of small -scale family businesses, particu
Condition 1
The development hereby approved shall be begun before the expiration of four years from the date of this decision notice.
Condition 2
In respect of the mobile food and catering unit only, at the expiration of a period of 5 years from the date of this approval, or when the food unit ceases to be operational, whichever shall occur first, the use and siting of a mobile food and catering unit shall cease and be removed.
Condition 3
The operation of the mobile food and catering unit hereby permitted shall be closed and the use cease between 18.30 or dusk (whichever time is earlier) and 06.00 hours. For the avoidance of doubt dusk shall be defined as 30 minutes before sunset.
Condition 4
This approval, in so far as it relates to the siting and operation of a single mobile food and catering unit, must be sited in accordance with the Proposed Site Plan dwg no 20-002 03 rev B and maintained as such. The extension to the car park shall be constructed and laid out in accordance with the same plan and completed in all respects prior to the commencement of the use of the new parking spaces.
Condition 5
No external lighting shall be installed except in accordance with a detailed external low level lighting scheme which complies with the recommendations outlined in the BCT and ILP Guidance Note 8 Bats and Artificial Lighting (2023), which must be submitted to and approved in writing by the Planning Department prior to the installation of any external illuminations. Any external lighting shall be installed and maintained solely in accordance with the agreed scheme. This condition applies equally to the car park extension as to external lighting on the mobile food and catering van.
Condition 6
No part of the works hereby approved to extend the car park shall commence until a Precautionary Working Method Statement for Common Lizard - Zootoca Vivipara, has been submitted to the Department and approved in writing. The agreed details of the Working Method Statement, which should include a timetable for implementation if appropriate, shall be implemented in accordance with the terms of the Statement and the agreed timetable.
Condition 7
Before the extension to the car park hereby permitted is first bought into use the proposed new sod bank shall be constructed in accordance with the Typical Sod Bank Section and the other details shown on the Proposed Site Plan (Dwg No 20-002 03 rev B). The bank shall then be maintained in accordance with those prescribed details.
Condition 8
Before work commences on the car park hereby permitted a comprehensive scheme of planting of native species covering the full length of the new sod bank boundary shall be submitted to and approved in writing by the Planning Authority. The scheme shall include a specification for the proposed plant species, along with planting guides and a timetable for the implementation of the scheme. The scheme shall be carried out in accordance with the agreed timetable. Any trees or plants which within a period of 5 years from the commencement of planting of the sod bank, are removed or become seriously damaged or diseased shall be replaced in the next planting season with others of similar size and species.
Condition 9
The temporary Heras fencing must be installed and maintained throughout the construction period of the approved car park extension works, in line with the details contained in the Proposed Site Plan (Dwg No 20-002 03 rev B). No construction activities shall take place outside of the designated construction area, and any fencing which becomes damaged throughout construction must be replaced immediately.