Loading document...
Mark & Rosina Casson The Paddock Ballamenagh Road Baldrine Isle Of Man IM4 6AL
TOWN AND COUNTRY PLANNING ACT 1999 The Town and Country Planning (Development Procedure)(No 2) Order 2013
In pursuance of powers granted under the above Act and Order the Department of Infrastructure determined to APPROVE an application by Mark & Rosina Casson, Ref 15/00114/B, for the Variation of condition 3 of PA 14/00337/C to extend permission to erect a dwelling for a further two years at Land At Fairfield House Fairfield Avenue Ramsey Isle Of Man IM8 2LS subject to compliance with the following condition(s):
Reason: To comply with the Town and Country Planning (Development Procedure)(No2) Order 2013.
Reason: This is an approval in principle and these matters require detailed consideration by the Planning Authority.
Reason: To comply with article 14 of the Town and Country Planning (Development Procedure) (No2) Order 2013 and to avoid the accumulation of unimplemented planning approvals.
Reason: To safeguard the trees within the development site in the interests of visual amenity.
Reason: To safeguard the ecology of and water quality within the watercourse as well the stability of the stream bank. This approval relates to drawings reference numbers 119.5.1, 119.5.2 and 119.5.3 all received on 3rd February 2015. Date of Issue: 17th March 2015
Guidance Note
This decision was made by the Director of Planning and Building Control in accordance with the authority delegated to him in the name of the Minister and/or in the name and on behalf of the Department.
This permission refers only to that required under the The Town and Country Planning (Development Procedure)(No 2) Order 2013.
Any appeal against this decision must be in accordance with the criteria set down in that instrument.
Specifically, a valid appeal must be in writing, signed by the appellant, and submitted to the Department within 21 days of the date of this Notice. To further validate the appeal it must contain:
An appeal form and guidance notes are available from either Planning & Building Control, Tel 685950, or to download from the Department’s website http://www.gov.im/categories/planning-and-building-control/planning-developmentcontrol/planning-appeals/how-to-appeal/
The proposed development must not be commenced until either;
Whichever is the later.
If no appeal is lodged within 21 days of the date of issue overleaf, and this decision becomes final, the Department’s public reference copy (counter copy) of the planning application may be collected by the applicant or their agent from Murray House.
Whilst a copy of the Officer’s report which led to the decision is now available to view via the Departments website, link below, all other correspondence relative to the application is available for inspection at the Department.
https://www.gov.im/planningapplication/services/planning/search.iom
Please note that if the counter copy of the application is not collected within THIRTY DAYS following the last date on which a planning appeal can be made it will be destroyed without further notice.
Copyright in submitted documents remains with their authors. Request removal