Erection of fencing adjacent to highway (retrospective) Lezayre Lodge, Kerrowmoard, Sulby
Do not oppose has no traffic management, parking or road safety implications
Note: The fence is set back 2 metres from the highway and does not interfere with the visibility splays. Improvement to the existing trees
13/00182/B
Installation of canopy over new doorway and replacement signage, Railway Hotel, Banks Circus, Douglas
Do not oppose has no traffic management, parking or road safety implications
13/00184/A
Approval in principle for erection of a replacement farm dwelling Clypse Moar Farm, Clypse, Onchan
Do not oppose has no traffic management, parking or road safety implications
13/00178/B
Erection of a garage extension to dwelling, Read Ellan Cottage, Jurby East
Do not oppose has no traffic management, parking or road safety implications
13/00177/B
Erection of a greenhouse The Carrick, Port Lewaigue, Maughold
Do not oppose has no traffic management, parking or road safety implications
Director of Highways R D Pearson BEng (Hons) CEng, MICE, MCIHT, DMS Highways Division Sea Terminal Building Douglas, Isle of Man IM1 2RF Switchboard (01624) 686600 Telephone (01624) 686676 Fax (01624) 686677 Email: [email protected]
Date of Response 01/03/13 - AG
Copyright in submitted documents remains with their authors. Request removal
Source & Provenance
Official reference
13/00184/A
Source authority
Isle of Man Government Planning & Building Control