29 May 2013 · Delegated
Wrights Pit North Landfill Off, Cranstal Road, Bride, Isle Of Man, IM7 4bs
Permission was sought to extend the time for landfill operations by a further five years plus one year, to complete the restoration scheme. The proposal also included importing about 5,000 tonnes per annum of mixed inert and construction and demolition (C&D) wastes over the extended period, and preparing an amended alternative restoration scheme to reflect the projected volume of imported materials. The application was approved subject to the conditions set out by the decision notice. The formal decision record lists 13 conditions.
The Council approved the application subject to conditions. The decision was for extending the time for landfill operations for a further five years plus one year, to allow the restoration scheme to be completed, including importing c. 5,000 tonnes per annum of mixed inert and C&D wastes over the five-year period and developing an amended alternative restoration scheme to reflect the expected volume of imported materials.
Condition 1
This permission relates to the completion of land filling and restoration operations at Wrights Pit North as shown in the drawings and other information within the document Planning Application and Environmental Statement (SLR Ref 419-00189-000088) date stamped 19 December 2012.
Condition 2
The development hereby permitted allows a further five years for the continuation of land filling operations until 31st December 2019 and a further one year to enable the restoration scheme to be completed by 31st December 2020. By that date, all equipment, plant buildings and fencing (subject to condition 7) shall be removed from the site and its locality, save for that required in connection with the on-going management of the approved scheme of restoration.
Condition 3
As the approved landfill progresses the site shall be capped with layers of selected sand and gravel, so as to provide a suitable substrate for the development of the proposed restoration scheme. Provision shall be made for the free drainage of rainfall and for the free emission of landfill gas.
Condition 4
Prior to any final restoration, measures to prevent the ingress of rabbits shall be submitted to and approved in writing by the Planning Authority and those approved measures shall be implemented.
Condition 5
Unless otherwise approved in writing by the Planning Authority, the site shall be restored in accordance with the scheme and phasing details set out in Section 3 of the Planning Application and Environmental Statement (SLR Ref 419-00189-000088) date stamped 19 December 2012.
Condition 6
No water or other contaminants shall be permitted to flow or be transferred by vehicle wheels on to the highway at the access to Wrights Pit North.
Condition 7
Subject to the other conditions in this notice, the development shall be carried out in accordance with the approved plans WPN 1/1, WPN 2/1, WPN 2/2 WPN 2/3, WPN 3/1, WPN 3/2 and WPN 3/3 all bound into the Planning Application and Environmental Statement (SLR Ref 419-00189-000088) date stamped 19 December 2012.
Condition 8
The boundary fences around the site shall be retained and shall be removed only following the written agreement of the Planning Authority.
Condition 9
No water or mud shall be permitted to drain from the site on to the highway.
Condition 10
No deliveries shall be made to the site outside the times of Mondays to Fridays between 0930 hrs and 1530 hrs.
Condition 11
Unless otherwise approved in writing by the Planning Authority, the landform in each completed phase and surface restoration phase shall accord with the landform and contours shown in drawings WPN 3/1, WPN 3/2 and WPN 3/3.
Condition 12
No household waste or incinerator bottom ash shall be deposited on the site.
Condition 13
If at any time, frogs or lizards are found on the site, DAFF shall be notified and given time to advise.