Reserved Matters Decision Notice
The Town and Country Planning (Development Procedure) Order 2005
Mr Richard Steven Baker The Mines House Corony Bridge Near Ramsey IM7 1EU
In pursuance of powers granted under the above Act and Order the Department of Infrastructure does hereby APPROVE the following application made on behalf of:
Name: Mr Richard Steven Baker Proposal: Reserved Matters application for the erection of a detached dwelling with integral garage at: Land At Thie Gretch Ballaragh Road Laxey Isle of Man
which was considered on 28th June 2010, subject to compliance with the conditions specified below.
Date of Issue: 29th June 2010
Murray House Mount Havelock Douglas
Mrs P Faragher Deputy Secretary to the Planning Committee
Schedule Of Conditions:
- The development hereby permitted shall commence before the expiration of four years from the date of this notice.
- This approval relates to drawing no.s BAL01A, BAL02A, BAL03A, BAL04A, BAL05A, BAL06A, BAL07A, BAL08A, BAL09A and BAL10A date stamped the 6th April 2010 and drawing no. BAL23A date stamped the 21st June 2010.
- The glass in the three first-floor windows on the rear (north) elevation of the dwelling must be glazed and maintained thereafter using frosted glass. The level of obscuration used must be no less than level 5 as detailed on the Pilkington's textured glass range or equivalent.
- Prior to the occupation of the dwelling the visibility splays must be set out in accordance with drawing no. BAL03A date stamped the 6th April 2010.
This decision was made by the Senior Planning Officer in accordance with the authority delegated to her under Article 3(13) of the Town and Country (Development Procedure) Order 2005.
Guidance Note
This permission refers only to that required under the Town and Country Planning (Development Procedure) Order 2005.
Any appeal against this decision must be in writing and must be received by this Department within 21 days of the date of this notice.
A form and guidance notes are available from either the Planning Office, Tel 685950, or to download from the Department's website www.gov.im/ dlge/planning/plan/applications/decision.xml
Please note that a copy of the Officer's report which led to the decision, together with correspondence relative to the application, is available for inspection at the Department.
The proposed development must not be commenced until either;
- The time for requesting an appeal has expired; or
- Any appeal has been determined;
Whichever is the later.