Planning Approval Notice 10/00145/B
The Town and Country Planning (Development Procedure) Order 2005
Balderton Consulting Ltd C/o Wilson & Collins Balthane Industrial Estate
Ballasalla
IM9 2AJ
In pursuance of powers granted under the above Act and Order the Department of Infrastructure does hereby APPROVE the following application made on behalf of:
Name: Balderton Consulting Ltd
Proposal: Erection of an industrial manufacturing building
at: Unit C
Balderton Court
Balthane
Ballasalla
Isle Of Man
which was considered on 31st March 2010, subject to compliance with the conditions specified below. Date of Issue: 14th April 2010 Murray House Mount Havelock
Douglas
Deputy Secretary to the Planning Committee
Schedule Of Conditions:
- The development hereby permitted shall commence before the expiration of four years from the date of this notice.
- This permission relates to the construction of an industrial unit with associated car parking as shown in drawings GA1, GA2, GA3, GA4, GA1/1250 and GA200 all received on 2nd February, 2010.
- Notwithstanding the details submitted, further details of the means of surface water drainage shall be submitted to and approved in writing by the Planning Authority prior to the commencement of building works on site: such details shall include the final discharge figure from the proposed development into the public sewer.
NOTE The applicant is advised to consult the Manx Electricity Authority in respect of future and existing electricity supplies to and on the site.
This decision was made by the Senior Planning Officer in accordance with the authority delegated to her under Article 3(13) of the Town and Country (Development Procedure) Order 2005.
Guidance Note This permission refers only to that required under the Town and Country Planning (Development Procedure) Order 2005. Any appeal against this decision must be in writing and must be received by this Department within 21 days of the date of this notice.
A form and guidance notes are available from either the Planning Office, Tel 685950, or to download from the Department's website www.gov.im/dlge/planning/plan/applications/decision.xml.
Please note that a copy of the Officer's report which led to the decision, together with correspondence relative to the application, is available for inspection at the Department.
The proposed development must not be commenced until either:
- The time for requesting an appeal has expired; or
- Any appeal has been determined;
Whichever is the later.
10/00145/8