Erection of five façade mounted flagpoles and two ground mounted flag poles (in association with 14/00617/CON) The Douglas and Clarendon Hotel, North Quay
Do not oppose
14/00618/B
Erection of a glazed shelter to side elevation of Lawn Chapel, Lawn Cemetery, Johnny Watterson Lane
Do not oppose
14/00621/B
Erection of a ground floor extension to side and rear elevations and installation of roof dormer 127 Royal Avenue, Onchan
Do not oppose
14/00623/B
Conversion of existing barns and outbuildings into a watch makers workshop, outbuildings Claddagh Farm, Sulby Bridge, Sulby
Do not oppose subject to the imposition of the following conditions
There is an existing access which served the farm. The increase in vehicular traffic created from this proposal will not impact on road safety. Visibility splays of 2.4 x 90 metres must be provided in each direction. Nothing must be planted, erected or allowed to remain within the visibility splay that exceeds or may exceed one metre in height.
Infrastructure Highway Services Sea Terminal Building Douglas, Isle of Man IM1 2RF Switchboard (01624) 686600 Telephone (01624) 686676 Fax (01624) 686677 Email: [email protected]
Copyright in submitted documents remains with their authors. Request removal
Source & Provenance
Official reference
14/00616/GB
Source authority
Isle of Man Government Planning & Building Control