Loading document...
Architecture In Mann 80 Bucks Road Douglas Isle of Man IM1 3AF
In pursuance of powers granted under the above Act and Order the Department of Infrastructure determined to APPROVE a planning application by Thalema Ltd, Ref 14/00500/B, for the erection of a dwelling with detached garage and associated landscaping at land adjacent to Brackenthwaite Port Lewaigue Ramsey Isle of Man subject to compliance with the following condition(s):
Reason: To comply with article 14 of the Town and Country Planning (Development Procedure) (No2) Order 2013 and to avoid the accumulation of unimplemented planning approvals.
Reason: In the interests of the appearance of the development.
Reason: In the interests of the appearance of the development.
Reason: To ensure that sufficient provision is made for off-street parking and turning of vehicles in the interests of highway safety.
visibility shall be fully provided before occupation of the dwelling hereby permitted and shall thereafter be maintained at all times.
Reason: In the interests of highway safety.
Reason: To safeguard the areas to be landscaped and the existing trees and planting to be retained within the site.
This approval relates to Drawing Numbers 0150/01 01 (site location plans), 0150/01 03 (elevations) and TS-1A (site survey) received on 28 April 2014; Drawing Number 0150/01 06 (site sections) received on 02 June 2014; Drawing Numbers 0150/01 04B(site layout) received on 20 June 2014; and Drawing Number 0150/07 (revised visibility splays) received on 25 June 2014.
Date of Issue: 4th July 2014
M Gallagher
Director of Planning and Building Control
This decision was made by the Director of Planning and Building Control in accordance with the authority delegated to him. This permission refers only to that required under the Town and Country Planning (Development Procedure) (No 2) Order 2013. Any appeal against this decision must be in accordance with Article 8 of the Order.
A valid appeal must be in writing, signed by the appellant, and submitted to the Department within 21 days of the date of this Notice. To further validate the appeal it must contain:
An appeal form and guidance notes are available from either Planning & Building Control, Tel 685950, or to download from the Department’s website http://www.gov.im/categories/planning-and-building-control/planning-development-control/planning-appeals/how-to-appeal/
Please note that a copy of the Officer’s report which led to the decision, together with correspondence relative to the application, are available for inspection at the Department.
The proposed development must not be commenced until either;
Whichever is the later.
If no appeal is lodged within 21 days of the date of issue overleaf, and this decision becomes final, the Department’s public reference copy (counter copy) of the planning application may be collected by the applicant or their agent from Murray House.
Please note that if the counter copy of the application is not collected within THIRTY DAYS following the last date on which a planning appeal can be made it will be destroyed without further notice.
Copyright in submitted documents remains with their authors. Request removal