13 August 2025 · Committee
Land Adj To Mount Murray Golf Club, Ballacutchel Road, Mount Murray, Douglas, Isle Of Man, IM4 2ht
Permission was granted for the construction of an underpass beneath Ballacutchel Road at the Comin Hotel and Golf Resort, Mount Murray, Santon, Isle of Man. The underpass would connect the two existing halves of the golf course, which are currently separated by the road. The golf course straddles the 20 mph Ballacutchel Road, and play currently requires golfers to cross the road twice between holes. The officer report identified highway safety as the key planning issue. The site sits adjacent to the main entrance of the golf club, with hedge banks bounding both sides of the road and areas of hardstanding within the club premises. The application was approved by the Committee on 13 August 2025, subject to three conditions.
The application was permitted by the Committee on 13 August 2025. The proposal addresses a practical safety issue: the golf course currently straddles Ballacutchel Road, requiring golfers to make two road crossings between holes. The underpass removes those crossings, which was the key highway safety consideration identified in the officer report. The approval is subject to three conditions.
General Policy 2 of the Strategic Plan
The proposals will not give rise to any unacceptable impacts upon landscape character, highway safety or ecology and will comply with General Policies 2 and 3
General Policy 2: Development which is in accordance with the land-use zoning and proposals in the appropriate Area Plan and with other policies of this Strategic Plan will normally be permitted, provided that the development: (a) is in accordance with the design brief in the Area Plan where there is such a brief; (b) respects the site and surroundings in terms of the siting, layout, scale, form, design and landscaping of buildings and the spaces around them; (c) does not affect adversely the character of the surrounding landscape or townscape; (d) does not adversely affect the protected wildlife or locally important habitats on the site or adjacent land, including water courses; (e) does not affect adversely public views of the sea; (f) incorporates where possible existing topography and landscape features, particularly trees and sod banks; (g) does not affect adversely the amenity of local residents or the character of the locality; (h) provides satisfactory amenity standards in itself, including where appropriate safe and convenient access for all highway users, together with adequate parking, servicing and manoeuvring space; (i) does not have an unacceptable effect on road safety or traffic flows on the local highways; (j) can be provided with all necessary services; (k) does not prejudice the use or development of adjoining land in accordance with the appropriate Area Plan; (l) is not on contaminated land or subject to unreasonable risk of erosion or flooding; (m) takes account of community and personal safety and security in the design of buildings and the spaces around them; and (n) is designed having due regard to best practice in reducing energy consumption. 6.3 Development outside of areas zoned for development
Environment Policy 1
The proposals will not give rise to any unacceptable impacts upon landscape character, highway safety or ecology and will comply with General Policies 2 and 3, Environment Policy 1
Area Plan for the East sets out locally-applicable means for implementing the policies set out in the Isle of Man Strategic Plan 2016. In that Strategic Plan, we find the Environment Policies. Environment Policy 1 states: The countryside and its ecology will be protected for its own sake. For the purposes of this policy, the countryside comprises all land which is outside the settlements defined in Appendix 3 at A.3.6 or which is not designated for future development on an Area Plan. Development which would adversely affect the countryside will not be permitted unless there is an over- riding national need in land use planning terms which outweighs the requirement to protect these areas and for which there is no reasonable and acceptable alternative. Maintaining the purpose of this Area Plan as a means of implementation, there is some further direction to be found in the Strategic Plan, at paragraph 7.2.1: 'Whilst landscape and coastal change is inevitable, and in some cases desirable, the emphasis must be on the appropriateness of this change and the balance or equity between the needs of conservation and those of development. The primary goal must therefore be to respect, maintain and enhance the natural and cultural environment including nature conservation and landscape and coastal quality, and ensure its protection from inappropriate development.' Given the comprehensive nature of the Isle of Man Strategic Plan's Environmental Policies, only a small number of additional Proposals and Recommendations are necessary. In order to produce an implementable Area Plan for the East it is necessary to recognise those statutory desig nations and strategies which whilst having an Island-wide scope are highly relevant to the protection of environments within the Plan Area. An example is the UNESCO Biosphere status afforded to the Isle of Man. Island-level strategies identify crossborder issues and take account of the cumulative impacts of human engagement with nature. Area Plan Objectives i. To protect, conserve and enhance the natural and cultural environment of the plan area and promote biodiversity. ii. To improve the function, usability and provision of our green infrastructure and public spaces by providing a network of green spaces and features which are connected and where possible, accessible to the public. iii. To manage and improve flood risk and improve drainage conditions. iv. To support the working countryside and its custodians in maintaini ng a sustainable rural economy. Area Plan Desired Outcomes i. Where approved, d evelopment will be ecologically sustainable and designed to protect and where possible enhance biodiversity as well as mitigate and adapt to the effects of climate change. ii. The Green Infrastructure network will be established and fostered, connecting people with nature in a way that achieves the best shared outcomes for the urban and natural environment. iii. Statutory and non-statutory designations will continue to provide protection to the most important and most vulnerable cultural assets, habitats and environments in the plan area. iv. Beyond the towns and villages, the area as a whole will retain its landscape setting including its important visual interaction with the central uplands, central valley, coast and marine environment. Natural Environment Proposal 1 The Department supports the protection, creation and improvement of green infrastructure in the East, particularly in those locations which have the potential to be part of a Green Infrastructure Network. Applications for development must take into account any approved Government Green Infrastructure Strategies, but in any case, must identify how development proposals intend to contribute to the long term provision of a network of connected green spaces. UNESCO Biosphere In 2017, the Isle of Man became the first ever entire nation to achieve UNESCO Biosphere status. Project partners pledge to take steps to protect natural resources, develop the economy in a sustainable way and promote outstanding living landscapes. UNESCO Biosphere Reserves are established to connect people and the economy with nature, wildlife, culture, heritage and communities. Biosphere Reserves have three functions: Conservation: to contribute to the conservation of landscapes, ecosystems, species and genetic variation. Development: to foster economic and human development which is socio -culturally and ecologically sustainable. Logistic support: to support demonstration projects, environmental education and training, research and monitoring related to local, regional, national and global issues of conservation and sustainable development. The Isle of Man Biosphere is zoned into six areas . Examples of all of these can be found in the Eastern area: Terrestrial Core areas, Marine Core areas, Terrestrial Buffer zone, Marine Buffer zone, Terrestrial Transition areas and Marine Transition areas. There is some overlap with The Isle of Man's First Biodiversity Strategy 2015-20
Transport Policy 5 of the Strategic Plan
The proposals will not give rise to any unacceptable impacts upon landscape character, highway safety or ecology and will comply with General Policies 2 and 3, Environment Policy 1 and Transport Policy 5
Transport Policy 5: Any improvements to the Island's highway network, including the provision of new roads, footpaths, and cycle routes, should be undertaken in accordance with the environmental objectives of this plan. In the preparation of the Area Plans consideration will be given to the identification of suitable sites for commercial vehicle parking. 11.4 Pedestrians 11.4.1 Walking is also an important means of travel in its own right or as part of most journeys. All pedestrians need safe and convenient means of crossing and passing along roads. Alternatively provision should be made for walking journeys separated from general traffic.
Condition 1
- 1. The development hereby approved shall be begun before the expiration of four years from the date of this decision notice. Reason: To comply with Article 26 of the Town and Country Planning (Development Procedure) Order 2019 and to avoid the accumulation of unimplemented planning approvals.
Condition 2
- 2. The development shall be carried out in strict accordance with the recommendations and requirements set out at Section 5.0 of the ecological survey report dated April 2025 submitted with the planning application. Reason: To provide adequate safeguards for the ecological species existing on the site.
Condition 3
- 3. The banks to be removed as part of the development hereby approved shall be fully reinstated prior to the use of the underpass first commencing. Reason: In the interests of landscape character and ecology in the area. This decision relates to the following plans and drawings, date stamped 2 May 2025: