1 November 2012 · Delegated
Park Hotel, Park Road, Ramsey, Isle Of Man, IM8 3ar
Permission was granted for the erection of a dry store extension to the rear service yard of the Ramsey Park Hotel on Park Road, Ramsey, Isle of Man. The site forms part of the curtilage of a four-storey hotel development that also includes a retail unit, restaurant, and associated car parking. The extension was proposed to serve the hotel's rear service area. The application was determined on a delegated basis by the Department of Infrastructure. The case officer recommended approval, and permission was granted subject to two conditions.
The Department of Infrastructure approved the application on a delegated basis. The officer recommended approval and the application was permitted, with two conditions attached.
Isle of Man Strategic Plan 2007
Development which is in accordance with the land-use zoning and proposals in the appropriate Area Plan and with other policies of this Strategic Plan will normally be permitted
General Policy 2: Development which is in accordance with the land-use zoning and proposals in the appropriate Area Plan and with other policies of this Strategic Plan will normally be permitted, provided that the development: (a) is in accordance with the design brief in the Area Plan where there is such a brief; (b) respects the site and surroundings in terms of the siting, layout, scale, form, design and landscaping of buildings and the spaces around them; (c) does not affect adversely the character of the surrounding landscape or townscape; (d) does not adversely affect the protected wildlife or locally important habitats on the site or adjacent land, including water courses; (e) does not affect adversely public views of the sea; (f) incorporates where possible existing topography and landscape features, particularly trees and sod banks; (g) does not affect adversely the amenity of local residents or the character of the locality; (h) provides satisfactory amenity standards in itself, including where appropriate safe and convenient access for all highway users, together with adequate parking, servicing and manoeuvring space; (i) does not have an unacceptable effect on road safety or traffic flows on the local highways; (j) can be provided with all necessary services; (k) does not prejudice the use or development of adjoining land in accordance with the appropriate Area Plan; (l) is not on contaminated land or subject to unreasonable risk of erosion or flooding; (m) takes account of community and personal safety and security in the design of buildings and the spaces around them; and (n) is designed having due regard to best practice in reducing energy consumption. 6.3 Development outside of areas zoned for development
Condition 1
The development hereby permitted shall commence before the expiration of four years from the date of this notice.
Condition 2
This approval relates to the erection of a dry store extension to rear service yard as proposed in the submitted documents and drawing 2011-097-11 all received on 27th September 2012.
Change of use of retail unit to hotel facilities
PENDING CONSIDERATION
Erection of illuminated and non illuminated signage
Construction of a 30 bed hotel development with a retail unit and 45 cover restaurant & bar with associated parking provision
Demolition of existing two bungalows and development of site to provide a hotel with function and conference facilities, and 96 residential apartments