Consultation DOI Flood Risk Management
Representation from Department of Infrastructure (DOI) Flood Risk Management Division
Flood Risk Management Comment:
DNOC
Flood Risk Management Representational History for this case:
The property is within a tidal flooding area.
Conditions
If the planning application is permitted we would ask that it is conditioned to the application that there should be no sleeping accommodation on the ground floor. A Flood Risk Assessment should be submitted to detail flood mitigations and emergency egress plans.
Flood Risk Management Officer:
Peter Dainton [email protected]
Code Definition
| DEFFER | Flood Risk Management’s input has been deferred pending further information |
| DNO | Do not oppose |
| DNOC | Do not oppose subject to condition(s) |
| NFRMI | No Flood Risk Management interest |
| O | Oppose |
Please note that the content of this memo has been completed by Officers from DOI Flood Risk Management in relation to the detailed planning application for the benefit of Officers of DEFA P&BC
Department of Infrastructure Sea Terminal Building, Douglas, Isle of Man, IM1 2RF www.gov.im/infrastructure